TIBCO TB0 -123 Active Matrix Business Works 5 Practice Exam Set 2

When a transition is created, which condition type is used by default?


Options are :

  • Otherwise
  • Error
  • Success
  • Success if No Matching Condition
  • Success with Condition

Answer : Success

What is a use of the End activity?


Options are :

  • To define multiple custom error schemas
  • To map input values into a called process
  • To catch unhandled exceptions
  • To propagate errors for groups

Answer : To define multiple custom error schemas

Tibco TB0-120 Enterprise Message Service 6 Practice Exam Set 2

Which statement is true about the Load Full Project option in TIBCO Designer?


Options are :

  • It finds references to other projects in memory
  • It makes working with the project faster.
  • It loads only the referenced parts of the project.
  • It loads and validates the entire project in memory.

Answer : It loads and validates the entire project in memory.

When creating a TIBCO Administrator domain, which types of repositories can be used for storage?


Options are :

  • Database and file-based
  • LDAP and Active Directory
  • Local and cloud
  • Secured and unsecured

Answer : LDAP and Active Directory

What is an available action as you deploy an ActiveMatrix BusinessWorks solution?


Options are :

  • Older versions of the deployed solution can be deleted.
  • The start time of a deployed application can be delayed.
  • A delay in seconds before a service is stopped can be indicated.
  • The path to the EAR file location can be specified.

Answer : Older versions of the deployed solution can be deleted.

TIBCO Enterprise Message Service Certification Exam Set 2

A BusinessWorks process must be deployed that receives input from an EMS topic and publishes data to an EMS queue. The topic and queue names must contain a token used for migrating between testing and production environments. The system administrator must be able to purge the topic and queue from within the TIBCO Administrator.Which two tools should you use to create a TIBCO Administrator domain that meets these requirements? (Choose two.)


Options are :

  • Domain Utility
  • Designer
  • BusinessWorks Global Variable
  • AppManage Utility

Answer : Domain Utility BusinessWorks Global Variable

What is a common use of Shared Variables?


Options are :

  • using process data to supply input values for an activity
  • store predefined values such as process ID and Project Name
  • sharing data between process instances to change it dynamically without restarting the engine
  • setting default values to be used throughout a project

Answer : sharing data between process instances to change it dynamically without restarting the engine

Which resource should you use to create a single Java object for the entire JVM?


Options are :

  • Job Shared Variable
  • Java Global Instance
  • Java Custom Function
  • XML to Java

Answer : Java Global Instance

TIBCO TB0-115 Active Structure Oriented Matrix Practice Exam Set 2

You wish to be able to configure a Global Variable on a per-service basis from TIBCO Administrator. Which Global Variable option should you check?


Options are :

  • Service
  • Type
  • Value
  • Service

Answer : Service

Which two statements are true when checking out from a version control system with ActiveMatrix BusinessWorks? (Choose two.)


Options are :

  • A project is the largest unit of work.
  • A folder is the largest unit of work.
  • An activity file is the smallest unit of work.
  • A process file is the smallest unit of work.

Answer : A project is the largest unit of work. A process file is the smallest unit of work.

You wish to pass data into a sub-process without changing the interface of the process. Which type of variable is most suited for this task?


Options are :

  • Shared Variable
  • Job Shared Variable
  • Process Variable
  • Global Variable

Answer : Job Shared Variable

TIBCO Enterprise Message Service Certification Exam Set 1

What is the purpose of the tokenize function?


Options are :

  • To concatenate two strings
  • To replace a specific character in a string
  • To map undefined data to a defined data type
  • Extract fields from a string

Answer : Extract fields from a string

What are the three ways to install TIBCO ActiveMatrix BusinessWorks? (Choose three.)


Options are :

  • Simple mode
  • Console mode
  • Silent mode
  • GUI mode
  • Custom mode

Answer : Console mode Silent mode GUI mode

A solution must implement different integration logic based on an object type. Depending on the object type, different external systems and interfaces must be called. There are more than 50 object types in the system. Which type of activity contains the Process Dynamic Override functionality required in this solution?


Options are :

  • Call Process activity
  • Java activity
  • Null activity
  • Dispatch activity

Answer : Call Process activity

Tibco TB0-120 Enterprise Message Service 6 Practice Exam Set 2

Which statement is true about the Accumulate Output feature for loops?


Options are :

  • It accumulates the output for a selected activity in the loop.
  • It accumulates the output for all activities in the loop.
  • It accumulates the output for the last executed activity in the loop.
  • It accumulates the output for any map activity in the loop

Answer : It accumulates the output for a selected activity in the loop.

Which four resources can be shared using the LibraryBuilder? (Choose four.)


Options are :

  • SAR within an EAR
  • XSD Schema
  • JMS Configuration
  • SSL Certificate
  • Identity
  • PAR within an EAR

Answer : XSD Schema JMS Configuration SSL Certificate Identity

When a loaded process begins with a Start activity that requires input, what are two ways to automatically load the data when you click the Supply Input Data to Starter button? (Choose two.)


Options are :

  • From a Read File activity
  • From a process
  • From a file
  • From a project

Answer : From a Read File activity From a process

TIBCO TB0 -123 Active Matrix Business Works 5 Practice Exam Set 1

The JVM is crashing every time the ActiveMatrix BusinessWorks installer tries to start. Which two steps should be taken? (Choose two.)


Options are :

  • check that the javahome directory contains bin/java.exe or bin/java
  • try running the installer using a different version of JVM
  • add the parameter -update JVM to the installer
  • check that the network has access to sun.java.com

Answer : check that the javahome directory contains bin/java.exe or bin/java try running the installer using a different version of JVM

Which file can be modified to expose the custom engine properties in TIBCO Administrator during deployment?


Options are :

  • The TIBCO Administrator TRA file
  • The rulebase file
  • The EAR file
  • The bwengine.xml file

Answer : The bwengine.xml file

What is the purpose of transitions?


Options are :

  • To apply configurations on a per-activity basis
  • To bind activities that must be treated as a single task
  • To control the execution order of activities in a process
  • To control the execution order of activities in a process

Answer : To bind activities that must be treated as a single task

TIBCO Enterprise Message Service Certification Exam Set 2

Which two statements are true about Global Variables? (Choose two.)


Options are :

  • They can be changed during deployment.
  • They are fixed and make deployment rigid.
  • They cannot be grouped.
  • They can be used to store the JDBC URL.

Answer : They can be changed during deployment. They can be used to store the JDBC URL.

A process using a Wait For JMS Topic Message activity occasionally receives events that do not match any Candidate Key.What should you use to make sure these un-matched events are sent to an existing logging service?


Options are :

  • A process with an onEventTimeout starter referencing the Wait For JMS Topic Message activity
  • A class implemented to the BusinessWorksEventTimeout interface and bundled with the deployment EAR file
  • A customized log4j appender class associated with the Wait For JMS Topic Message activity
  • The appropriate process referenced in the Process Name Dynamic Override field of the Wait For JMS Topic Message activity

Answer : A process with an onEventTimeout starter referencing the Wait For JMS Topic Message activity

Which two steps must take place before a domain can be deleted? (Choose two.)


Options are :

  • All administrators associated with the domain must be deleted.
  • Any LDAP server used by the domain must be stopped.
  • All secondary servers must be deleted through TIBCO Domain Utility.
  • All deployed applications must be undeployed.

Answer : All secondary servers must be deleted through TIBCO Domain Utility. All deployed applications must be undeployed.

TIBCO Enterprise Message Service Certification Exam Set 3

ActivationLimit is applied when which property is set to a value greater than 0?


Options are :

  • MaxJobs
  • FlowLimit
  • StepCount
  • ThreadCount

Answer : MaxJobs

The Retrieve Resources activity can retrieve which resources?


Options are :

  • WSDL, WSIL and ZIP
  • WSDL, WSIL, and XSD
  • XSD, XSLT and XML
  • JAR, XSD and WSDL

Answer : WSDL, WSIL, and XSD

What is an acceptable Activation Interval if the Heartbeat Interval is 30 seconds?


Options are :

  • 105 seconds
  • 15 seconds
  • 45 seconds
  • 35 seconds

Answer : 105 seconds

TIBCO TB0-120 Enterprise Message Service TM 6 Practice Exam Set 3

The ActiveEnterprise Adapter Palette supports which transport types?


Options are :

  • Tibrv Network and Tibrv Certified
  • Tibrv Certified and JMS Queue
  • JMS Route and JMS Queue
  • HTTP and Tibrv Certified

Answer : Tibrv Certified and JMS Queue

Which activities prohibit transitions to other activities?


Options are :

  • Catch and Rethrow
  • Generate Error and Set Shared Variable
  • Rethrow and Generate Error
  • Inspector and Catch

Answer : Rethrow and Generate Error

By default, ActiveMatrix BusinessWorks 5.9 uses which version of the Java Runtime Environment?


Options are :

  • 1.3.2
  • 1.6.0
  • 1.4.2
  • 1.5.0

Answer : 1.3.2

TIBCO TB0-115 Active Structure Oriented Matrix Practice Exam Set 4

You wish to allow a message selector to be changed at runtime. Which JMS activity should you use?


Options are :

  • Reply To JMS Message
  • JMS Queue Sender
  • JMS Topic Publisher
  • Get JMS Queue Message

Answer : Get JMS Queue Message

Comment / Suggestion Section
Point our Mistakes and Post Your Suggestions