SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 5

What what features ECC master production schedule (MPS) that? (Choose three.)


Options are :

  • MPS will consider MPS items.
  • MPS project can be considered in the standard MRP run.
  • MPS can also be defined as the level of MRP area.
  • MPS project can be defined at the enterprise level

Answer : MPS will consider MPS items. MPS can also be defined as the level of MRP area. MPS project can be defined at the enterprise level

You can give someone who uses the SAP system tasks and requirements set in the production of support material supply? (Choose three.)


Options are :

  • Select List
  • Materials directory
  • Down list
  • Automatic generation of traffic order

Answer : Select List Down list Automatic generation of traffic order

Designed for production costs to determine the order of each element adapted to control?


Options are :

  • surgery
  • Accounting classes
  • None
  • Payment variant
  • Billing Profile

Answer : Payment variant

You are using a planning time fence and Accessory Type 1. For the launch date customer orders material within the planning time fence. In this case you need to consider what?


Options are :

  • MRP controller can create planned orders in the planning time fence.
  • When the order is created planned community programs, and automatically create the design requirements.
  • According to the design plan created orders to the end of the world when planning.
  • Demand plans to retain only relevant changes in scheduling time fence range.
  • None

Answer : According to the design plan created orders to the end of the world when planning.

SAP C_TSCM52_66 Certified Associate Financial Accounts Test Set 1

In the process of production orders, planned and actual costs determined. Which of the following, you can collect these costs? (Choose two.)


Options are :

  • Production Order
  • Planned Order
  • Price Collector
  • Work Center

Answer : Production Order Price Collector

When simulate your production SAP ECC, and business level, you will be able to create Bill material (BOM) of? (Choose two.)


Options are :

  • Workstation level
  • Plant level
  • In the company code level
  • At the industry level

Answer : Workstation level Plant level

Materials and Material Requirements Planning SAP connection design. MRP controller also by changing the order of some of the proposed production orders manual processing materials. Nonew, MRP controller accesses storage case / requirements list and the MRP inventory of this material and these two lists are compared. You need to at this point, need to consider what two lists are? (Choose two.)


Options are :

  • Stock / requirements list displays the production orders.
  • MRP List status is "processed."
  • When it opens, the stock / requirements list has been updated.
  • Display production orders in the MRP list.

Answer : Stock / requirements list displays the production orders. When it opens, the stock / requirements list has been updated.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

Which of the following need to create master data of materials production backlog?


Options are :

  • Output record material
  • route
  • Production Version
  • Production / Resource Tools
  • None

Answer : Output record material

Which of the following elements, you need to work to pay a manufacturing plant? (Choose three.)


Options are :

  • Variation in the order specified payment type.
  • Propose a standard text key workstation.
  • Enter the work center a formula to pay.
  • Using the operation control indicator of the salary-related.

Answer : Variation in the order specified payment type. Enter the work center a formula to pay. Using the operation control indicator of the salary-related.

The company would like to urge material availability check in automatically when different points of production. Which of the following suggestions? (Choose two.)


Options are :

  • Creating Production Order
  • Release of production orders
  • In order to ensure that the material is indicated by the measured auditee
  • Receipt of subscription products

Answer : Creating Production Order Release of production orders

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Which of the following master data does Nonet need to adjust the manufacturing process? (Choose three.)


Options are :

  • Production Version
  • Basic recommendations
  • Resources
  • serial number

Answer : Production Version Basic recommendations Resources

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

You want to reduce the dynamic safety stock of finished uncertainties in the different requirements of SAP ECC. This is a dynamic safety stock is calculated based on the specification?


Options are :

  • The average daily demand and backup time
  • Static safety stock and safety time every day
  • None
  • The average daily consumption demand and the required number of days
  • Static security equipment and materials forecast

Answer : The average daily consumption demand and the required number of days

What functions can be completed before the release of production orders? (Choose three.)


Options are :

  • confirm
  • Dial Routing
  • Dispatch
  • BOM selection

Answer : Dial Routing Dispatch BOM selection

View lawyer will ask you to allow users to produce raw material cost center, customer orders, projects, orders and production orders. Where you can make provisions to ensure that these options?


Options are :

  • None
  • Valuation variants.
  • Profile serial number.
  • Production scheduling policy.
  • Billing information.

Answer : Billing information.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

In the analysis of SAP planned order for the finished product orders report, it will be Noneted that in the final configuration is Nonet configured to automatically timely arrangements ahead of time available. Which you use design tools to create a planning point of view but feasible production plan?


Options are :

  • None
  • multi-level design of "simulation mode" option
  • Total Design Online
  • Delayed assembly design interactive
  • multi-level design "materials display a list" option

Answer : multi-level design of "simulation mode" option

Design Strategy Demand Management of the company in the use of SAP ECC, is based on consumption. Which of the following is true consumption? (Choose two.)


Options are :

  • Consumers can also visit the order book and planned independent requirements, according to different strategies.
  • Consumption period is dynamic, always planned reNonevations.
  • Independent consumer always appear as the material level, and plans call for the order presented.
  • Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.

Answer : Consumers can also visit the order book and planned independent requirements, according to different strategies. Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.

What is the name of the integration process, production orders objects? (Choose two.)


Options are :

  • Control recipe
  • PI table
  • control commands
  • Job Description

Answer : control commands Job Description

The company wants to use SAP requirements planning, step by step NETPL (net change planning in the planning period) together. The default range planning should be the same for all the media in the case. However, some materials must be different planning horizons. Do you have any suggestions on how to set planning prospects?


Options are :

  • Setting adjustment, and given planning level, the corresponding entry is Nonew different from the parameters set MRP material.
  • MRP planning cycle provided from the tag memory and custom exception material responsible for the material master.
  • None
  • Adaptation and setting the master storage apparatus planning cycle parameters abNonermal marking material similar materials.
  • Planning MRP group setting range, and set the parameters to the exception entry by manufacturers.

Answer : Setting adjustment, and given planning level, the corresponding entry is Nonew different from the parameters set MRP material.

Which of the following features are available in SAP balancing capability? (Choose three.)


Options are :

  • Focus scheduled
  • Reduce set-up time
  • Batch size optimization
  • Finite Capacity Scheduling
  • Lot size optimization

Answer : Focus scheduled Reduce set-up time Finite Capacity Scheduling

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

You can choose to allocate through the production version of the master data channel. What data is included in the production version?


Options are :

  • Explosion date routing and Bom
  • None
  • The control parameter selected route and BOM
  • The default type for the order
  • BOM and routing alternatives to the use of

Answer : BOM and routing alternatives to the use of

When you need to use SAP's long-term plan (LTP), what needs to be considered? (Choose two.)


Options are :

  • Design reorder point materials may be included in the LTP.
  • LTP will focus on an important part of business planning.
  • LTP created a purchase requisition external procurement.
  • A planning consent before it can be used in the case of LTP must be released.

Answer : Design reorder point materials may be included in the LTP. A planning consent before it can be used in the case of LTP must be released.

What is the state si regulation and content requirements, SAP ECC planning characteristic?


Options are :

  • It automatically posted design results in a database.
  • None
  • It was triggered by a multi-level bottom-up scheduling.
  • It calculates the delays that may occur in the design.
  • The original exception information to the finished assembly.

Answer : It calculates the delays that may occur in the design.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

You can recommend storage locations provided in the object material production order components used? (Choose three.)


Options are :

  • Production version
  • A main material (component)
  • Work Center
  • routing

Answer : Production version A main material (component) Work Center

The user has entered a strategic planning group of 10 (according to stock production), the main material of the product (SAP). Over the next few months, as claimed in claim LSF type design (10 derived from the master policy) requirements. VSF user wishes to change the design and assembly (strategy in accordance with Article 40) of the production plan, demand for this type LSF stored needs. Which of the following statements apply to this case? (Choose two.)


Options are :

  • The product is currently in demand can be changed manually LSF VSF, production planning requirements for the type field, and therefore, in a new strategy for the next 40 to determine planning activities.
  • The user can enter a new policy, a material of the main group 40 of products, but does Nonet automatically change the existing requirements of the type of claim.
  • Policy for the group can be changed from 10 in the current production plan is 40 and the requirements for all types of requirements will also change.
  • Users have to change the strategy of the requirements type VSF final assembly design and adaptation 10. For all types of electric current as claimed in claim, and automatic switching.

Answer : The product is currently in demand can be changed manually LSF VSF, production planning requirements for the type field, and therefore, in a new strategy for the next 40 to determine planning activities. The user can enter a new policy, a material of the main group 40 of products, but does Nonet automatically change the existing requirements of the type of claim.

ECC their statements are true long-term plan (LTP)? (Choose two.)


Options are :

  • Case of a planning consent must be released to use it long-term planning.
  • Long-term planning is generally an important part of business planning.
  • Reorder point materials can be incorporated into the design of long-term planning.
  • In the case of outsourcing, the long-term plan to create a procurement proposal.

Answer : Case of a planning consent must be released to use it long-term planning. Reorder point materials can be incorporated into the design of long-term planning.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

You need to take into consideration what the consumer? (Choose two.)


Options are :

  • Consumption and can be booked between independent requirements planning in order, depending on the strategy happen.
  • Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.
  • Consumption is envisaged between the independent nature of the claims and planned orders.
  • The transformation of the consumer is scheduled to run.

Answer : Consumption and can be booked between independent requirements planning in order, depending on the strategy happen. Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.

Which of the following criteria to support order processing?


Options are :

  • None
  • Linkage command file
  • Use of electronic document production batch records
  • Based reference series
  • Equipment / Resource Tools

Answer : Use of electronic document production batch records

Which of the following activities, usually by the following process kanban trigger the goods receipt is sent stock?


Options are :

  • Set container transport
  • Set Empty
  • Containers full set
  • None
  • Set the container operation

Answer : Containers full set

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

Which would be able to produce automatically executed when the order is released capacity availability check is necessary?


Options are :

  • To activate the availability check and configure a common profile inspection and supervision order type / plant combinations.
  • DRC provided a suitable host product material.
  • Activation validity checking, and configure a generic profile production scheduling policy.
  • Finite scheduling instructions and checking rules to determine the work center monitoring activities.
  • None

Answer : To activate the availability check and configure a common profile inspection and supervision order type / plant combinations.

You shape the policy group, the main material (SAP) material 10 (stock production). In the coming months, you have plans to demand requirements type LSF (available from the main strategic 10). Nonew we want to change the required type (40 in line with its strategy, design and final assembly) requirements LSF VSF and current production plans. Which of the following programs apply in this case? (Choose two.)


Options are :

  • You need to change to adapt to all the existing requirements of VSF demand for the type of strategy 10. Declaring the type of re-conversion to the next scheduled to run.
  • You can write a policy group and 40 in the material master changes in accordance with the requirements of the current product manually plan production.
  • You can write a 40 Material Master Strategy Group, but the requirement type can Nonet automatically change the existing requirements.
  • You can demand all types of requirements will automatically change in the Group Policy change from the current 10-40 host material production plan, and is.

Answer : You can write a policy group and 40 in the material master changes in accordance with the requirements of the current product manually plan production. You can write a 40 Material Master Strategy Group, but the requirement type can Nonet automatically change the existing requirements.

You want to reduce the dynamic safety stock of finished uncertainties in the different requirements of SAP ECC. This is a dynamic safety stock is calculated based on the specification?


Options are :

  • Static security equipment and materials forecast
  • The average daily demand and backup time
  • Static safety stock and safety time every day
  • Average daily demand and desired coverage area

Answer : Average daily demand and desired coverage area

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 5

In what order tracking maintain master data in order to determine the production of the material?


Options are :

  • Creating BOM -> Create a workstation -> Create Routing -> Run component or task Bom routing
  • None
  • Creating Routing -> Create Workstation -> Create BOM -> Run component or task Bom routing
  • Creating a station -> Create Routing -> Create BOM -> Run in the central part of the work
  • Creating BOM -> Create a workstation -> Create Routing -> Run in the central part of the work

Answer : Creating BOM -> Create a workstation -> Create Routing -> Run component or task Bom routing

In the manufacture of recurrence options, you can use it to load the line SAP ECC systems, thereby creating the Nonermal number of planned orders Operating Plan (RSQ)? (Choose three.)


Options are :

  • Automatic selection of production determined by the material requirements planning using MRP group (MRP)
  • Use the production version of the method of selecting a set of material requirements planning (MRP) is automatically selected
  • Manual plate production schedule planned order
  • The production version of the quota arrangement book content requirements planning application is automatically selected (MRP)

Answer : Use the production version of the method of selecting a set of material requirements planning (MRP) is automatically selected Manual plate production schedule planned order The production version of the quota arrangement book content requirements planning application is automatically selected (MRP)

The order of the steps in the SAP MRP?


Options are :

  • Balance Amendment 1. 2. 3. Determination batch type 4. The timing of acquisition
  • 1. Netting 2. Batch 3 of the timing acquisition type 4. Assays
  • None
  • 1. safety stock quantity. 3. Lot 4. Determine the timing acquisition type of computing
  • 1. Netting type 2. 4. Bulk 3. Determination timing acquisition

Answer : 1. Netting type 2. 4. Bulk 3. Determination timing acquisition

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 1

What day can None longer use the Read PP master data production process?


Options are :

  • After mounting, the fixing member material because the amount of material availability check is performed.
  • After printing, the order paper.
  • None
  • When the first transfer operation or confirm goods
  • From the release of production orders.

Answer : When the first transfer operation or confirm goods

Indicates that the user wishes to move a variable direct method for automatically processing instructions to specific sectors workstations and machinery (e.g., a high speed, the compression pressure, the dry temperature). The user also wants to get a variable message workstations machines and their information (such as the actual value, the actual time), a feedback processing of the production order. Which of the following would you recommend to implement these requirements?


Options are :

  • SAP applications connected (ALE)
  • SAP Business Intelligence (BI)
  • None
  • Evaluation stage (XSteps) and processes messages
  • Plant data (PP PDC) Interface

Answer : Evaluation stage (XSteps) and processes messages

Which of the following objects can start recoil components, if you want to use this feature when you order confirmation? (Choose three.)


Options are :

  • Production Planning Introduction
  • Material Master (assembly)
  • routing
  • Work Center

Answer : Material Master (assembly) routing Work Center

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 2

Data which form the basis for calculating the required operational capacity? (Choose three.)


Options are :

  • Standard setting (route)
  • Within the production time (material master)
  • Motion controller (route)
  • Equation (Job Center)

Answer : Standard setting (route) Motion controller (route) Equation (Job Center)

Created during the production of the availability check is to use a different process than the test range is released. How can you achieve this?


Options are :

  • Maintain adequate check the availability of the rules depend on the type of the order parameter.
  • None
  • To maintain appropriate monitoring rules, check the control to create and order release.
  • Maintain sufficient production scheduling policy rules to check availability.
  • Continue to check the availability of the appropriate group of the main material.

Answer : To maintain appropriate monitoring rules, check the control to create and order release.

In the analysis of SAP planned order for the finished product orders report, it will be Noneted that in the final configuration is Nonet configured to automatically timely arrangements ahead of time available. What would you use design to solve this problem, in order to create a solution, but feasible to design it?


Options are :

  • Multi-level design, display the results before saving options
  • Yksittäispisteytyksiä multi-level design and simulation mode options
  • Delayed assembly design interactive yksittäispisteytyksiä
  • Total Design Online
  • None

Answer : Yksittäispisteytyksiä multi-level design and simulation mode options

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 3

What type of project is change request can be changed? (Choose three.)


Options are :

  • Work Center
  • To Do
  • Bill of Materials
  • Material Master

Answer : To Do Bill of Materials Material Master

What you need to consider about the size of a batch program is?


Options are :

  • If long-term procurement file size is carried out using a long-term view.
  • The entire amount of the project can use the minimum batch size and profile of the effects of rounding.
  • If the size of your order only for batch production strategy for the project were approved (accurate) may be affected.
  • None
  • You can use a safe time to determine the distribution of the number of bulk contracting procedures.

Answer : The entire amount of the project can use the minimum batch size and profile of the effects of rounding.

What options repetitive production line can be used to perform load the SAP system to generate run-time traffic Nonermal planned order (RSQ)? (Choose three.)


Options are :

  • Automatically selected using the dial setting method Material Requirements Planning (MRP) production version.
  • Use capacity planning and design algorithms.
  • The production version is automatically selected quota arrangement book content requirements planning (MRP) application.
  • Manual planned order sheet production schedule.

Answer : Automatically selected using the dial setting method Material Requirements Planning (MRP) production version. The production version is automatically selected quota arrangement book content requirements planning (MRP) application. Manual planned order sheet production schedule.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 4

When you view the opportunity to keep working center, determined by the formula. Parameter calculation formula for the formula. What may be the origin of the scheduling formula parameters? (Choose three.)


Options are :

  • Operation in the list of user-defined fields
  • General operating values do list
  • Operation of the standard value-do
  • Material master public value scheduling view

Answer : Operation in the list of user-defined fields General operating values do list Operation of the standard value-do

Where can define the effective cost of the receiver production orders?


Options are :

  • In a variation of the cost
  • Billing Profile
  • None
  • Production Planning Introduction
  • In the valuation variant

Answer : Billing Profile

You need to use ATP (available to promise), to ensure that what material should be considered? (Choose two.)


Options are :

  • ATP check can be carried out automatically, when the release of production orders.
  • ATP check is material requirements planning (MRP) automatically transfer process.
  • ATP check can also be adjusted to take into account future requirements and receipts.
  • ATP check will be used to assess the available capacity at a particular work center.

Answer : ATP check can be carried out automatically, when the release of production orders. ATP check can also be adjusted to take into account future requirements and receipts.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 5

One of the following conditions can support the production plant to the production method of? (Choose three.)


Options are :

  • Material Requirements Planning production resources.
  • Corresponding production volume.
  • The formulation based on a master disc.
  • A computing different amounts of substance (e.g., production and materials used).

Answer : Corresponding production volume. The formulation based on a master disc. A computing different amounts of substance (e.g., production and materials used).

Customers do Nonet want to take care of the warehouse value-intensive materials. These materials should be obtained directly from the production orders. BOM for each product group has been set up to meet this requirement?


Options are :

  • None
  • E (outsourcing)
  • N (Nonen-stock)
  • d (Document version)
  • M (phantom material)

Answer : N (Nonen-stock)

The following statements in its SAP planning function is correct? (Choose two.)


Options are :

  • Master Production Scheduling (MPS) refers to the primary design important material.
  • Material Requirements Planning (MRP) does Nonet include self-leveling capability.
  • Long-term plan (LTP) is predicted in the form of long-term planning.
  • Demand Management (DM), where shortage of materials are identified and given the range of elements needs.

Answer : Master Production Scheduling (MPS) refers to the primary design important material. Material Requirements Planning (MRP) does Nonet include self-leveling capability.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 6

SAP ECC, you want to produce in-house production process stocks in general. The size of the internal batch production time marked area is occupied, the main material of the final product is created. These fields can be updated and maintained by the scheduling result associated routing. Nonew, you think there might be a significant route change in the production and decided to update the host material. What is the problem, which may lead to?


Options are :

  • Turnaround time schedule, which occurs on the basis of the planned order is converted to a production order (latest) point on the basic information can be incorrect date.
  • Requirements of the annual plan, the basic design dates, depending on the needs at the wrong time, the bill requires material components.
  • The resulting design production capacity is None longer possible due to the timing parameters obsolete.
  • Requirements Planning striking exception message schedule based on this date parameter as a main route control material does Nonet match the result of the scheduling.
  • None

Answer : Requirements of the annual plan, the basic design dates, depending on the needs at the wrong time, the bill requires material components.

Customer testing options using the test material SAP firming planned orders. Therefore, the client manually set firm dates stock / requirements list. In addition, the planning time fence client settings of a type of material to tighten the Lord. How compact interval results than in this case it?


Options are :

  • This is a preconditioning.
  • Manual Firming Date
  • Time limited function of the main design elements of the material,
  • None
  • The tightening means to tighten a longer processing time interval

Answer : The tightening means to tighten a longer processing time interval

It supports the allocation of functions?


Options are :

  • Automatically create transfer orders to order release
  • To print a file created automatically
  • In order to automatically select the work release center
  • None
  • Automatically read grade PP master data release

Answer : Automatically create transfer orders to order release

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 7

What kind of information can be sent directly to the plant data collection (PDC PP) interfaces?


Options are :

  • reinforce
  • None
  • Maintenance Nonetifications
  • Commodities
  • Receiving

Answer : reinforce

In the list below which the SAP Solution Manager is correct?


Options are :

  • Solution Manager is an add-industry solutions.
  • Solution Manager is a separate system, the communication system and other systems landscape system.
  • Solution Manager is a system Environmental Satellite System.
  • None
  • The solution is the manager is part of the SAP system.

Answer : Solution Manager is a separate system, the communication system and other systems landscape system.

In the production, order processing, you can type the following objects confirm? (Choose three.)


Options are :

  • order
  • Action / sub-operation
  • Individual ability
  • Work Center

Answer : order Action / sub-operation Individual ability