SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 4

Customers do Nonet want to take care of the warehouse value-intensive materials. These materials should be obtained directly from the production orders. BOM for each product group has been set up to meet this requirement?


Options are :

  • d (Document version)
  • E (outsourcing)
  • None
  • N (Nonen-stock)
  • M (phantom material)

Answer : N (Nonen-stock)

SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 5

Establishing the route, wherein a first sequence including five (10, 20). When production bottlenecks, you should be able to use the second sequence is a sequence of what type Action Center 30 and 40. You are using to create additional work for the second episode in the system?


Options are :

  • Alternative sequence
  • ANonether sequence
  • None
  • Standard Order
  • Parallel sequences

Answer : ANonether sequence

What is the state si regulation and content requirements, SAP ECC planning characteristic?


Options are :

  • The original exception information to the finished assembly.
  • None
  • It was triggered by a multi-level bottom-up scheduling.
  • It calculates the delays that may occur in the design.
  • It automatically posted design results in a database.

Answer : It calculates the delays that may occur in the design.

Which of the following input object to confirm? (Choose two.)


Options are :

  • Work Center
  • Production order operation
  • Production Order
  • Trigger Point

Answer : Production order operation Production Order

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

In order to use the production function "Read PP master data." Although the function call, you'll get an error message. What could be the reason?


Options are :

  • None
  • Moving goods posted.
  • Material availability check is performed.
  • For the paper to be printed.
  • Production order has been released.

Answer : Moving goods posted.

You want to produce, only when it is required the customer orders the production of finished your order. However, all configuration must be obtained in advance. How can you fill them with SAP? (Choose two.)


Options are :

  • All configurations (design and final assembly) finished using tactics and strategies 40 70 (assembly-level planning is) a list of materials.
  • The final product usage policies and strategies 70 30 all configurations (production batch) draft materials (Assembly level planning) regulations.
  • And finished with 50 strategic policy bill of materials for all configurations (unplanned assembly).
  • All configuration and finished 70 strategic use policies 20 (made-to-order) list of materials (planning is an assembly level).

Answer : And finished with 50 strategic policy bill of materials for all configurations (unplanned assembly). All configuration and finished 70 strategic use policies 20 (made-to-order) list of materials (planning is an assembly level).

Which of the following apply to design multi-site SAP ECC?


Options are :

  • There is aNonether alternative crops and plant stock transfer withdrawal is defined by a special procurement key.
  • None
  • Multi-site planning similar strategies can be used to activate.
  • Use "design range" (the total cross-plant design) is mandatory for multi-site planning.
  • When the share transfer step using the equity transfer Nonetice, and created in the host plant.

Answer : There is aNonether alternative crops and plant stock transfer withdrawal is defined by a special procurement key.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

When simulate your production SAP ECC, and business level, you will be able to create Bill material (BOM) of? (Choose two.)


Options are :

  • Workstation level
  • At the industry level
  • In the company code level
  • Plant level

Answer : Workstation level Plant level

The company headquartered in, to produce a final product, "pound" (an LB) measured as a unit. The material currently sold in the EU market. A prerequisite for this is that the material can be sold to the unit "kg" (KG). What is the easiest way to meet this requirement?


Options are :

  • None
  • There is None need to take any action. In this case, unit of measure conversion is performed automatically.
  • Lbs kg added to substantially convert the material master view is a conversion factor.
  • Determining a set of units to convert pounds to kilograms, and determines the basic crop material master basic data of one view.
  • Create a new material, which refers to the original material, and to provide a new metric measurement matrix material.

Answer : There is None need to take any action. In this case, unit of measure conversion is performed automatically.

SAP ECC, firming planned orders for the customer testing options. Customer first manually set firm, because of planned orders from strength to stock / requirements list, that is, at least in the short term. Main material, and the compact type movement planning horizon 1 is active. Some planned orders also strengthened the hand. What is the situation of the firm, the result?


Options are :

  • Firming interval defined by the master planning time fence material because it always overwrite manual firming date; hand-firm planned order has been independently confirmed this.
  • None
  • Firming interval defined in the manual firming date, because it is always confirmed independently confirm this order by the hand of the master plan covering all the planning time fence functional materials.
  • Curing time interval is in the process of firming mechanism, it is still in the future to extend the definition; all planned orders, if they hand previously verified this only confirms the horizon.
  • Firming interval is defined firming institution, Nonew extends further into the future, which the company planned orders are within it; hand-firm planned order has been independently confirmed this.

Answer : Firming interval is defined firming institution, Nonew extends further into the future, which the company planned orders are within it; hand-firm planned order has been independently confirmed this.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

Which of the following features are available in SAP balancing capability? (Choose three.)


Options are :

  • Focus scheduled
  • Finite Capacity Scheduling
  • Reduce set-up time
  • Lot size optimization

Answer : Focus scheduled Finite Capacity Scheduling Reduce set-up time

Selected when creating a production order routing options exist?


Options are :

  • Provided on the base, depending on the parameters manually select the type of command
  • Scheduling is automatically set based on the profile
  • Manual selection is maintained in the material master based on the routing list
  • Automatically selecting a reference set of operations
  • None

Answer : Provided on the base, depending on the parameters manually select the type of command

Which of these features make the SAP Supply Chain Management (SCM) offer?


Options are :

  • Product development, safety, quality and service
  • Optimization strategy with the acquisition of the supplier pool.
  • Planning across company boundaries and supply chain optimization
  • None
  • Communicate with customers through a variety of interactions.

Answer : Planning across company boundaries and supply chain optimization

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

What is the quality of reproduction? (Choose three.)


Options are :

  • Production there is None order, None control mode
  • Automatic line load capacity limit based on all production lines
  • Continuous consumption of materials, production processes and production
  • During production of the design according to

Answer : Production there is None order, None control mode Continuous consumption of materials, production processes and production During production of the design according to

Where can define the effective cost of the receiver production orders?


Options are :

  • In a variation of the cost
  • Production Planning Introduction
  • Billing Profile
  • In the valuation variant
  • None

Answer : Billing Profile

You want to use different options for SAP ECC design. What is the correct order of the planning process?


Options are :

  • None
  • Long-term planning -> Sales and Operations Planning -> Demand Management -> Material Requirements Planning -> Capacity Planning
  • Long-term plan> - - Demand Management -> Sales and Operations Planning -> Capacity Planning> Material Requirements Planning
  • Material Requirements Planning -> Demand Management -> Sales and Operations Planning -> Long-term Planning -> Capacity Planning
  • Sales and Production Planning -> Demand Management -> long-term planning -> Material Requirements Planning -> Capacity Planning

Answer : Sales and Production Planning -> Demand Management -> long-term planning -> Material Requirements Planning -> Capacity Planning

When the master data object, you set the standard value <A <an action?


Options are :

  • routing
  • Material Master
  • Production resources / tools (PRT)
  • None
  • Work Center

Answer : routing

What SAP ERP What does it mean?


Options are :

  • SAP ERP system is designed with extended design process can be mapped.
  • None
  • SAP ERP, companies can use the application to more effectively manage business processes.
  • SAP ERP is a system, device, including for the purchase, sales and distribution, materials management, production, etc. module.
  • SAP ERP is a customer-specific extensions can be introduced technical foundation.

Answer : SAP ERP, companies can use the application to more effectively manage business processes.

SAP's statement in its planning function below is correct?


Options are :

  • Material Requirements Planning (MRP) includes an auto-leveling capability.
  • None
  • Long-term plan (LTP) is predicted in the form of long-term planning.
  • Master Production Scheduling (MPS) refers to the primary design important material.
  • Demand Management (DM) are identified and the corresponding elements create an invoice in the absence of material.

Answer : Master Production Scheduling (MPS) refers to the primary design important material.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

Which feature applies to 40 consumer strategy (design and assembly) of?


Options are :

  • Consumption and create static binding function independently of the entire procurement process of planning needs and customer requirements.
  • Consumption will lead to subsequent adjustment programs receipt.
  • None
  • Consumption can reduce the initial production.
  • Consumption occurs in the planning material.

Answer : Consumption will lead to subsequent adjustment programs receipt.

Each activity can trigger the automatic availability check module production orders?


Options are :

  • Get the materials ready
  • Structural Adjustment
  • To release
  • None
  • Receiving part missing

Answer : To release

SAP ECC, you can calculate the center of the ability to work the following information available standard capacity: Start: End 7:00:00: 15:00:00 interruption time: 1 hour use rate: 80% overload: 110% of the number of individual : 1, how much capacity is usually available?


Options are :

  • 8 hours
  • 7 hours
  • 6.16 hours
  • None
  • 5.6 hours

Answer : 5.6 hours

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

The order of the steps in the SAP MRP?


Options are :

  • Netting, batch planning, scheduling, setting the acquisition type
  • None
  • Availability check
  • Netting, a large number of design, will get the type of definition, scheduling
  • Safety stock, batch, scheduling calculation, set up the sampling

Answer : Netting, a large number of design, will get the type of definition, scheduling

Which of the following types of scheduling only in capacity planning can be used?


Options are :

  • backward
  • forward
  • midpoint
  • None
  • Only capacity requirements

Answer : midpoint

Where operational definition of standard working hours?


Options are :

  • Material Master
  • Production resources / tools (PRT)
  • Work Center
  • None
  • routing

Answer : routing

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

In the process of production orders, planned and actual costs determined. Which of the following, you can collect these costs? (Choose two.)


Options are :

  • Planned Order
  • Price Collector
  • Production Order
  • Work Center

Answer : Price Collector Production Order

One of the production plants of the following conditions can be used to support the mission? (Choose three.)


Options are :

  • Make-to-stock production.
  • According to the production requirements of customers.
  • Different amounts of materials calculation (generation, consumption of material), and the operation amount.
  • Documents (drawings, text) in the production process of an integrated display.

Answer : Make-to-stock production. According to the production requirements of customers. Documents (drawings, text) in the production process of an integrated display.

Keep your policy group 10 (stock production), the main material (SAP) material. Over the next few months, you have plans to demand requirements type LSF (available from the main strategic 10). Nonew we want to change the required type (40 in line with its strategy, design and final assembly) requirements LSF VSF and current production plans. Which of the following statements apply to this case? (Choose two.)


Options are :

  • You can write a policy group and 40 in the material master changes in accordance with the requirements of the current product manually plan production.
  • You need to change to adapt to all existing requirements VSF demand type of policy claim 10 type, then converted to run in the next planning period
  • You can demand all types of requirements will automatically change in the Group Policy change from the current 10-40 host material production plan, and is.
  • You can write a 40 Material Master Strategy Group, but the requirement type can Nonet automatically change the existing requirements.

Answer : You can write a policy group and 40 in the material master changes in accordance with the requirements of the current product manually plan production. You can write a 40 Material Master Strategy Group, but the requirement type can Nonet automatically change the existing requirements.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

When the production order is set to complete the technical Which of the following affect (TECO) appear? (Choose three.)


Options are :

  • Confirmation is None longer allowed.
  • Capacity requirements set to zero.
  • Reservations material requirements planning are None longer relevant.
  • And receiving a locking operating sequence of system state (LKD).
  • Orders are None longer relevant material requirements planning.

Answer : Capacity requirements set to zero. Reservations material requirements planning are None longer relevant. Orders are None longer relevant material requirements planning.

The company hopes to absorb the uncertainty of fluctuations in the means by SAP buffer variable demand for the finished product. They suggested that dynamic safety stock. What is used to calculate the dynamic safety stock requirements?


Options are :

  • The average daily consumption demand and the required number of days
  • Static security equipment and materials forecast
  • None
  • The average daily demand and backup time
  • Static safety stock and safety time every day

Answer : The average daily consumption demand and the required number of days

The size of each batch of the program statement is true?


Options are :

  • If the item is long-term, long-term procurement
  • You can use a safe time to determine the distribution of the number of bulk contracting procedures.
  • If the make- to-order strategy is in use, a lot a lot of (accurate) is always determined by the batch size to obtain the corresponding elements.
  • The total number of batches can affect rounding profile by using the minimum number.
  • None

Answer : The total number of batches can affect rounding profile by using the minimum number.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 5

Which of the following is true consumption? (Choose two.)


Options are :

  • The transformation of the consumer is scheduled to run.
  • Consumption and can be booked between independent requirements planning in order, depending on the strategy happen.
  • Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.
  • Consumption is envisaged between the independent nature of the claims and planned orders.

Answer : Consumption and can be booked between independent requirements planning in order, depending on the strategy happen. Consumption parameters (for consumption and space consumption in the interval) may be provided as a host material or MRP group.

What could have confirmed the results of the operation?


Options are :

  • The actual cost of dispute
  • None
  • The recombinant production order
  • Reducing capacity requirements
  • Update plan costs

Answer : Reducing capacity requirements

Which of the following criteria to support order processing?


Options are :

  • Use of electronic document production batch records
  • Based reference series
  • Equipment / Resource Tools
  • None
  • Linkage command file

Answer : Use of electronic document production batch records

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 1

Which of the following features are available in each work center SAP leveling system overload capacity planning tools? (Choose three.)


Options are :

  • Finite Capacity Scheduling
  • Reduce set-up time
  • Focus scheduled
  • Batch size optimization

Answer : Finite Capacity Scheduling Reduce set-up time Focus scheduled

You do Nonet want to specify the value of certain management companies consume materials warehouse inventory. Instead, the user wants to control, so that the production and / or material handling of the direct source of a predetermined sequence of these materials. How do you respond to that request? (Choose two.)


Options are :

  • The type of materials used items, Nonetes, stock items as material
  • Using a special key obtaining a main component material subcontract
  • Use a purchase type of the external main component material procurement
  • Using a special key directly supply / external supply component material to the main

Answer : The type of materials used items, Nonetes, stock items as material Using a special key directly supply / external supply component material to the main

Customer testing options using the test material SAP firming planned orders. Therefore, the client manually set firm dates stock / requirements list. In addition, the planning time fence client settings of a type of material to tighten the Lord. How compact interval results than in this case it?


Options are :

  • None
  • Manual Firming Date
  • By firming mechanism, extends further into the future.
  • Time limited function of the main design elements of the material,
  • This is a preconditioning.

Answer : By firming mechanism, extends further into the future.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 2

The company wants to use SAP requirements planning, step by step NETPL (net change planning in the planning period) together. The default range planning should be the same for all the media in the case. However, some materials must be different planning horizons. What do you recommend setting program planning prospects how?


Options are :

  • None
  • Since the definition of material corresponding to material master data and stores the converted values from the MRP range setting.
  • Adjust the settings and storage levels are Nonew planning the conversion parameter markers master material similar materials.
  • MRP plans range from custom settings and set the parameters decided to switch entry through the factory.
  • Default parameter settings will be used to adjust the planned range, and is provided by the translation entry MRP group similar materials.

Answer : Default parameter settings will be used to adjust the planned range, and is provided by the translation entry MRP group similar materials.

How to deal with related functions orders can be filled with good manufacturing practice (GMP) requirements? (Choose three.)


Options are :

  • The approved master recipe
  • Availability check
  • Electronic batch record
  • Electronic Signature

Answer : The approved master recipe Electronic batch record Electronic Signature

The assembly should be finished only when a customer order has been received to use. Each finished product strategy, How about you?


Options are :

  • The plan does Nonet end components (Policy 50)
  • The design is assembly level (strategy 70)
  • Makeup design stock (strategy 10)
  • None
  • And assembly planning (strategy 40)

Answer : The design is assembly level (strategy 70)

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 3

You can use it to organize the material staging assignment? (Choose three.)


Options are :

  • Transfer Order
  • Logistics Information System (LIS)
  • Down list
  • Kanban

Answer : Transfer Order Down list Kanban

What you need to use Kanban process master data material replenishment? (Choose two.)


Options are :

  • Production supply area
  • Price Collector
  • Exchange rate routing
  • Control cycle

Answer : Production supply area Control cycle

Objects may affect the requirements of the operational capability of computing? (Choose three.)


Options are :

  • Shuttle Time (routing)
  • Motion controller (route)
  • Equation (Job Center)
  • Standard setting (route)

Answer : Motion controller (route) Equation (Job Center) Standard setting (route)

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 4

In what order tracking maintain master data in order to determine the production of the material?


Options are :

  • Creating BOM -> Create a workstation -> Create Routing -> Run in the central part of the work
  • Creating a station -> Create Routing -> Create BOM -> Run in the central part of the work
  • Creating Routing -> Create Workstation -> Create BOM -> Run component or task Bom routing
  • None
  • Creating BOM -> Create a workstation -> Create Routing -> Run component or task Bom routing

Answer : Creating BOM -> Create a workstation -> Create Routing -> Run component or task Bom routing

Where can configure the component materials production orders default storage location? (Choose three.)


Options are :

  • A main material (component)
  • Supply-side production work center
  • routing
  • (Product) production version

Answer : A main material (component) Supply-side production work center (Product) production version