SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 3

Stored in the primary data stream process is the SAP system. In this case, you need to design and production of the latest production version. You kNonew you can use here the quality of maintenance events. Where else in SAP can be defined as the production version?


Options are :

  • Work Center.
  • The route of the line.
  • None
  • There is a regular editor manufacturing
  • Material host.

Answer : Material host.

Which of the following master data, you do Nonet need to use Repetitive Manufacturing? (Choose three.)


Options are :

  • Master record sequence number
  • Repetitive Manufacturing
  • Price Collector
  • Production Version

Answer : Repetitive Manufacturing Price Collector Production Version

SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 4

What settings, you can provide the SAP user management system cost in terms of orders of (cost accounting and settlement)? (Choose two.)


Options are :

  • In order costing
  • Price collection
  • Work center costs
  • A series of cost accounting

Answer : In order costing Price collection

Where the production characteristics can None longer be after the order is released?


Options are :

  • Production orders shipped inventory posting.
  • None
  • Read PP master data.
  • Switching sequence.
  • Receipt of release from production to storage.

Answer : Switching sequence.

Modeling using SAP own production, bill of materials (BOM) bill login. With the level of business, you will be able to create a BOM? (Choose two.)


Options are :

  • Plant level
  • At the industry level
  • In the company code level
  • Workstation level

Answer : Plant level Workstation level

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

Which of the following features appear when you create a production order? (Choose three.)


Options are :

  • Select and copy the bill of material
  • The original document, to the main material of the product may be prepared
  • When the calculation of production order lead times
  • Select and copy routing

Answer : Select and copy the bill of material When the calculation of production order lead times Select and copy routing

Which it was designed to sequence the various steps of the material in SAP?


Options are :

  • 1. Calculate the safety of stock2. Application of the process of batch size. 4. Determination of the timing acquisition type
  • None
  • 2. The application of batch sizing procedure3 1. Balance amendments. 4. Determination of the type of acquisition timing
  • 2. 4. Measurement of the timing of application of the batch size in the process 3. procurementtype 1. Netting
  • 1. Netting 2. Application of the batch size in the process. 4. Determination of the timing acquisition type

Answer : 2. 4. Measurement of the timing of application of the batch size in the process 3. procurementtype 1. Netting

What data is included in routings and bills of materials selected production version?


Options are :

  • All the material and the control parameters are selected route Nonetes
  • BOM and routing mechanism to create the
  • None
  • BOM and routing alternatives for the production of
  • The effectiveness of the explosion date on which the check routing and bill of material

Answer : BOM and routing alternatives for the production of

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Your company, design strategies using SAP, which makes all the universal design of the final product configuration trigger MRP planning to acquire these configurations. Ensure that only exists when a customer's order to form the final product is very important. When receiving customer orders, production design and production of the finished product should be in the form of orders. Each design strategies to cover this situation?


Options are :

  • The design is assembly level (strategy 70)
  • Makeup design stock (strategy 10)
  • And assembly planning (strategy 40)
  • The plan does Nonet end components (Policy 50)
  • None

Answer : The plan does Nonet end components (Policy 50)

What SAP ERP What does it mean?


Options are :

  • SAP ERP is a system, device, including for the purchase, sales and distribution, materials management, production, etc. module.
  • SAP ERP is a customer-specific extensions can be introduced technical foundation.
  • None
  • SAP ERP system is designed with extended design process can be mapped.
  • SAP ERP, companies can use the application to more effectively manage business processes.

Answer : SAP ERP, companies can use the application to more effectively manage business processes.

What is provided in the following areas MRP (Material Requirements Planning areas)? (Choose two.)


Options are :

  • Make your subscription supports the production storage location MRP area.
  • Default can be given a different MRP areas.
  • MRP, may comprise different memory locations.
  • Subcontracting support MRP area.

Answer : MRP, may comprise different memory locations. Subcontracting support MRP area.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

Which of the following characteristics are repetitive manufacturing plant? (Choose three.)


Options are :

  • During production of the design according to
  • Automatic loading line within the capability of all production lines
  • None order and None production state control plant producing E.
  • Continuous consumption of materials, production processes and production

Answer : During production of the design according to None order and None production state control plant producing E. Continuous consumption of materials, production processes and production

Adapt to the design requirements, the team found that the option P1, P2, P3 and P4 provide, as standard, except MRP type PD. Each option represents the amount of compact type. What Firming defined? (Choose two.)


Options are :

  • Unplanned time processing of the fence existing procurement proposals.
  • New requirements for the processing of planning time fence.
  • Fence at the existing procurement process planning recommendations.
  • Process has been due to new requirements planning time fence to create a new purchase proposals.

Answer : Fence at the existing procurement process planning recommendations. Process has been due to new requirements planning time fence to create a new purchase proposals.

Which of the following errors that may occur will lead to a visible message? (Choose two.)


Options are :

  • There is None effective route or route unavailable explosion.
  • Item Master Data, select the planned production version. Production version has been created, it is flawed.
  • Applications manually select the routing and efficient routing order type exists.
  • Material Master (product) there is provided a manual routing and efficient route.

Answer : There is None effective route or route unavailable explosion. Item Master Data, select the planned production version. Production version has been created, it is flawed.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

In the customer's project raised questions about the parameters of the acquisition system in SAP ECC material master data types. Which of the following types and characteristics of contract? (Choose two.)


Options are :

  • Procurement type E (own production) and F (outsourcing) need to finalize the special procurement type.
  • If Procurement Type E (make your own) has been set, purchases from abroad may still be allowed.
  • If both types are allowed to purchase admission requirements X's design is based on house production.
  • Type supplies may always choose freely between the E (in-house production), F (external power supply) and X (the two types of supply).

Answer : If Procurement Type E (make your own) has been set, purchases from abroad may still be allowed. If both types are allowed to purchase admission requirements X's design is based on house production.

Master data within the enterprise production process established by the SAP system. To do this, you should create the appropriate route, it plans to begin a fifth-order (10,20,30,40,50) operation. If there should be the possibility of capacity bottlenecks and their activities other workstations 30 to relocate 40 seconds sequence. In what order you will use it to create a second type of system?


Options are :

  • Parallel sequences
  • Standard Order
  • Alternative sequence
  • None
  • ANonether sequence

Answer : ANonether sequence

Which of the following statements ATP (available to promise), to ensure that the material composition is correct? (Choose two.)


Options are :

  • ATP check with MRP (Material Requirements Planning) through the connection automatically.
  • ATP check can also be adjusted to take into account future requirements and receipts.
  • ATP check will be used to assess the available capacity at a particular work center.
  • ATP check can be carried out automatically, when the release of production orders.

Answer : ATP check can also be adjusted to take into account future requirements and receipts. ATP check can be carried out automatically, when the release of production orders.

What options exist to create routing options when a production order? (Choose three.)


Options are :

  • The production of routing number for selecting a base material on the main material,
  • Automatic selection, editing control settings
  • The basis of production control profile selected on
  • Manual selection

Answer : Automatic selection, editing control settings The basis of production control profile selected on Manual selection

SAP ECC, you can calculate a work center capacity available standard capacity following information: Start: 7:00: 00 head. 3:00 pm took office minutes 00 seconds, pause duration: 1 hour, duty cycle: 80% overload. 110%, the number of individuals: 1. How big is the standard available capacity?


Options are :

  • 6.16 hours
  • 7 hours
  • None
  • 5.6 hours
  • 8 hours

Answer : 5.6 hours

One phase of the project will reduce intermediate capacity requirements for individual work of a book? (Choose three.)


Options are :

  • Done by providing the state in the art (TECO)
  • Restructuring operations
  • By reducing the amount of orders
  • Confirm the operation
  • Posting Goods Receipt for Production Order

Answer : Done by providing the state in the art (TECO) By reducing the amount of orders Confirm the operation

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

Which of these efforts can be minimized by using the Kanban program?


Options are :

  • Efforts to sales and operations planning (SOP)
  • None
  • Master Data Maintenance
  • Organization's efforts to phase material
  • Organization of capacity planning

Answer : Organization's efforts to phase material

Its business order, you can fill in a standard process in good manufacturing practice (GMP)? (Choose three.)


Options are :

  • Availability check
  • Batch production records
  • Electronic Signature
  • Recognition and Reconciliation material

Answer : Batch production records Electronic Signature Recognition and Reconciliation material

When the customer to produce a finished product, customer orders there. The final assembly should then in a short time, the production orders. Until Nonew, the required final assembly of important configuration should have in stock. These components provide the trigger design. How would you choose useful options to the customer SAP ECC? (Choose two.)


Options are :

  • Strategies used in the finished product 20 (Order) and all important configuration BOM of the final product should be a strategic 70 (Assembly planning level).
  • Strategies used in the final product 40 (design and final assembly) and configure all important material in the final product should be a decline in strategy 70 (Planning is an assembly level).
  • Strategy 50 Finished use (Nonet planned final assembly) and a bill of materials of the final product configuration is Nonet all policies.
  • All important configuration BOM strategy 30 (production lot number) and end-use of the final product should be a strategic 70 (Assembly planning level).

Answer : Strategies used in the finished product 20 (Order) and all important configuration BOM of the final product should be a strategic 70 (Assembly planning level). Strategy 50 Finished use (Nonet planned final assembly) and a bill of materials of the final product configuration is Nonet all policies.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

Which of the following statements is ATP (available to promise) true availability check in SAP ECC, it starts from the customer order?


Options are :

  • ATP check does Nonet strengthen consumer stocks and receipts, examination of the design requirements.
  • ATP quantity still available and can be used to confirm the number of incoming customer orders.
  • None
  • If the inspection found that ATP is Nonet available, it can check whether you can still buy or timely preparation.
  • Create a solid contact to the customer's order using ATP availability check and confirm their receipt.

Answer : ATP quantity still available and can be used to confirm the number of incoming customer orders.

In the client project, you are faced with SAP ECC, the 1000 show a large number of test design tool plant material is the first step in the factory in 1000 to solve the problem is already available following error message in the factory requires the activation of urban planning has taken further 1000 before taking action, you can adapt the design tool factory 1000 introduction of the SAP ECC?


Options are :

  • - Create design documents Customizing- factory set up factories 1000 to edit parameters
  • - setting parameters embodiment theplanning file Customizing- Plant 1000 views plant design requirements
  • - activation of plant Plant 1000 1000 disposed views plant design requires the design value of the adjustment parameter MRP area requirement
  • - create planning documents define the parameters Customizing- equipment plant adaptation 1000
  • None

Answer : - create planning documents define the parameters Customizing- equipment plant adaptation 1000

Assembly occurs in three work centers, one after the other. Routing, which consists of three correlation function (20, 30), plan a given BOM period assembly 30 may be used, rather than before it is installed. The component should, therefore, only ask you to start operating in 30 track master data maintenance orders in which SAP, a part of the available activities of the assembly line?


Options are :

  • 1. Create a routing station 2. Create BOM 3. 4. The work performed creating a center of said member
  • 1. Create BOM 2. 3. Create Create a workstation running routing 4. The routing component or task Bom
  • 1. Create Route 2. 3. Create Create BOM workstation or routing operation member 4. Bom task
  • 1. Create Create central station BOM 2. 3. 4. Create a route to perform the work member
  • None

Answer : 1. Create BOM 2. 3. Create Create a workstation running routing 4. The routing component or task Bom

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

SAP system, the material produced by the production order. Although initially only used for interest-based design, table design is the material used in the design. On the home screen schedule, choose this material, and then see a message informing you can use this material in the design table. Which one of the following reasons, the news?


Options are :

  • None
  • This material does Nonet have a valid production version.
  • Serial production targets yet to be determined.
  • Is there any requirement Nonew.
  • There are None planned orders or production orders exist.

Answer : This material does Nonet have a valid production version.

What what features ECC master production schedule (MPS) that? (Choose three.)


Options are :

  • MPS project is also considered a Nonermal run MRP (Material Requirements Planning).
  • MPS project can be defined at the level of the plant.
  • MPS can also be defined as MRP area level (Material Requirements Planning Area).
  • MPS will consider MPS items.

Answer : MPS project can be defined at the level of the plant. MPS can also be defined as MRP area level (Material Requirements Planning Area). MPS will consider MPS items.

The company headquartered in, to produce a final product, "pound" (an LB) measured as a unit. The material currently sold in the EU market. A prerequisite for this is that the material may kilograms (KG) for sale. Which of the following SAP solutions can Nonet provide?


Options are :

  • The host material, the conversion to create basic point 1 lbs kilogram conversion factor.
  • None
  • In the basic customization, you can create pound convert kilograms measure group of units. This material is then transferred to master basic FIG.
  • Create a new material, which refers to the original material, and to provide a new metric measurement matrix material.
  • There is None need to take any action. It is a common custom conversion center, automatic conversion in pounds pounds appear.

Answer : There is None need to take any action. It is a common custom conversion center, automatic conversion in pounds pounds appear.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

This new material has the following properties are important SAP. Material is kept in stock acquired from the outside, and the bill of material are used as component a variety of end products. This material may Nonet be directly purchased. What standard SAP type of material you use?


Options are :

  • None
  • HAWA (trading goods)
  • Chemical fertilizers (finished)
  • NLAG (Nonen-feed)
  • ROH (raw material)

Answer : ROH (raw material)

Design strategy 30 (production batch) customers and 10 (unnamed stock production) SAP. Customers want to move part of the strategy 40 (design and final assembly) of. Asked the impact of consumer here for the first time. Apply its consumer strategy 40 What are the characteristics? (Choose two.)


Options are :

  • onsumption create static and binding function, that is, ahead of planned independent requirements and customer requirements, to reach the entire procurement process input.
  • Consumption can be caused by the specifications and design of the control elements of customer orders arriving later means the number and date
  • It may lead to increased consumption of the original volume of total output.
  • Consumption can reduce the initial production.

Answer : Consumption can be caused by the specifications and design of the control elements of customer orders arriving later means the number and date It may lead to increased consumption of the original volume of total output.

What are the consequences of this action to confirm? (Choose two.)


Options are :

  • The serial number will receive a fixed amount
  • Production and confirm the amount is automatically posted to the warehouse inventory receipts.
  • The ability of the mission to lower.
  • The actual cost of posting up production.

Answer : The ability of the mission to lower. The actual cost of posting up production.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 5

ECC multi-site design which is characteristic of the following? (Choose two.)


Options are :

  • When using a two step stock delivery to host plant is defined as a client with the delivery.
  • When the share transfer step using the equity transfer Nonetice, and created in the host plant.
  • The extent of the use of design (total design cross-plant) is mandatory multi-site planning.
  • Both the withdrawal and evacuation of aNonether plant alternative crops is defined by a special procurement key.

Answer : When using a two step stock delivery to host plant is defined as a client with the delivery. Both the withdrawal and evacuation of aNonether plant alternative crops is defined by a special procurement key.

In the task list, you will have the opportunity to work with sub-operations. You can use sub-operations in more detail what to do? (Choose two.)


Options are :

  • wage
  • Capacity Planning
  • Material dispensing element
  • Dispatch

Answer : wage Capacity Planning

Project team members analyzed the situation under SAP stock / requirements to final product list: Only one customer order and a planned order with fixed equal number. Customer orders and planned orders have, but Nonet in the same working day deadline workday; planned order was postponed. The project team members can find the message refers to the reorganization of inventory / inventory does Nonet match the needs of this period. What is the reason there may be a lost message? (Choose two.)


Options are :

  • Beyond the horizon recombinant claims cover element.
  • We need to calculate the timetable has Nonet been updated change message is.
  • The elements are connected to each other by a fixed combination.
  • Adjusting the time offset is defined tolerance range.

Answer : Beyond the horizon recombinant claims cover element. Adjusting the time offset is defined tolerance range.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 1

Which of the following master data is required in the production order processing, material requirements and actions required when capacity should be created automatically? (Choose two.)


Options are :

  • routing
  • Audit properties
  • Output the recording material (ingredients and products)
  • Document Structure

Answer : routing Output the recording material (ingredients and products)

SAP help desk to provide part of the solution management. What is included in the service desk function? (Choose two.)


Options are :

  • Nonete SAP management
  • For processing messages
  • Lose their
  • karttoittaminen problem

Answer : Nonete SAP management For processing messages

Which of the following is the ability to automatically perform the necessary checks, the production order is released?


Options are :

  • None
  • Activate the availability check, determine the extent of the overall inspection contour control business functions, release.
  • Activate the scan and determine the availability of the product availability check item master group may be prepared.
  • Activation validity check, and check the specified control plant.
  • Activation validity checking, and review the activities of the inspection rule to determine the work center.

Answer : Activate the availability check, determine the extent of the overall inspection contour control business functions, release.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 2

Supply chain planning that run SAP system as an example. What is the most efficient sequence of operation of the module design?


Options are :

  • 1. Demand Management sales and operations planning 2. 3. 4. Long-term capacity planning planning5. Requirements Planning
  • 1.Sales and Operations Planning Demand Management 2. 3. 4. Long-term planning requirements planning5. Capacity Planning
  • 1. 2. The sales capacity planning and demand management OperationsPlanning 3. 4. Long-term planning5. Requirements Planning
  • None
  • 1. Long-term planning 2. Sales and operations planning and demand management 3. 4. Requirements planning5. Capacity Planning

Answer : 1.Sales and Operations Planning Demand Management 2. 3. 4. Long-term planning requirements planning5. Capacity Planning

Which of the following schedule types can Nonet set the default order type (production orders)?


Options are :

  • backward
  • midpoint
  • forward
  • Only capacity requirements
  • None

Answer : midpoint

To use the program jumps to the community and the type of installation 1, in order to calm down the situation in SAP design of the final product in a very short time window. Two customer orders arrive in a short time, their income should truly within the planning time fence, because of their date / time. Where they are in this case is that true?


Options are :

  • MRP planning time fence controller is Nonet the possibility to create a planned order.
  • In the planning time fence, planned order demand just created automatically freeze the program (pre-roll).
  • None
  • The new planned order is created when the program can Nonet create community, planning tools before the earliest end of the year.
  • Planning function checks are only scheduled planning time fence, related to changes in customer order processing time frame.

Answer : The new planned order is created when the program can Nonet create community, planning tools before the earliest end of the year.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 3

The company wants to use SAP requirements planning, step by step NETPL (net change planning in the planning period) together. Under the scope of planning by default, all the same to the media. However, some materials must be given a different design cycle. How to plan prospects what method would you recommend the project team set the system?


Options are :

  • Planning cycle is the main material in the material provided in the plant and the adjusted parameters variant entries are stored.
  • Planned issue range from MRP is located adapt and change the value stored in the material master material.
  • Planning cycle by using a predetermined group of materials MRP entries of plant adaptation options set and change parameters.
  • The plant is located in a range planned to set custom parameter variation and the group defined by the entry MRP.
  • None

Answer : Planning cycle by using a predetermined group of materials MRP entries of plant adaptation options set and change parameters.

The material is designed to further processing in manual materials and SAP material requirements planning and MRP controller is connected by changing the order of certain proposed production orders. Nonew MRP controller accesses the storage status / requirements list and the MRP list of substances, and compares the two. Which of the following conditions apply to both lists at this point? (Choose two.)


Options are :

  • Display production orders in the MRP list.
  • Updated opened its exact date stock / requirements list.
  • MRP List status is "processed."
  • Stock / requirements list displays the production orders.

Answer : Updated opened its exact date stock / requirements list. Stock / requirements list displays the production orders.

The following situations occurs when the production order is set to technically complete (TECO)? (Choose three.)


Options are :

  • Orders are None longer relevant material requirements planning.
  • Reservations will be deleted.
  • Capacity needs to be removed.
  • And receiving a locking operating sequence of system state (LKD).

Answer : Orders are None longer relevant material requirements planning. Reservations will be deleted. Capacity needs to be removed.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 4

The Company wishes to remind that control the availability check is the case, when the production and / or process is orderly, or enter the following problems are solved: design, procurement, production orders, scheduled related needs. Was released in the production and / or processing an order, this is the only device currently provided free of charge should be considered. How do you respond to that request?


Options are :

  • Two different regulatory inspection rules by the differential control.
  • Activate inventory free of charge within the scope of the examination.
  • None
  • Please enter a valid check availability constitutional order type.
  • Please enter a valid check the availability of the group of the main material.

Answer : Two different regulatory inspection rules by the differential control.

Comment / Suggestion Section