SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 2

The following ECC master production schedule which is characteristic (MPS)? (Choose three.)


Options are :

  • MPS can also be defined as MRP area level.
  • MPS projects, standard MRP run.
  • MPS and MPS design projects always remain a long-term planning.
  • MPS will consider MPS items.
  • MPS project can be defined at the level of the plant.

Answer : MPS can also be defined as MRP area level. MPS will consider MPS items. MPS project can be defined at the level of the plant.

Which of the following activities, usually by the following process kanban trigger the goods receipt is sent stock?


Options are :

  • Setting "empty vessel"
  • Settings "container transport"
  • Settings "container full"
  • Settings "container in this process."
  • None

Answer : Settings "container full"

Each activity can trigger the automatic availability check module production orders?


Options are :

  • Receiving part missing
  • Structural Adjustment
  • None
  • Get the materials ready
  • To release

Answer : To release

SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 3

You want to use different options for SAP ECC design. What is the correct order of the planning process?


Options are :

  • Sales and Production Planning -> Demand Management -> long-term planning -> Material Requirements Planning -> Capacity Planning
  • Long-term planning -> Sales and Operations Planning -> Demand Management -> Material Requirements Planning -> Capacity Planning
  • None
  • Long-term plan> - - Demand Management -> Sales and Operations Planning -> Capacity Planning> Material Requirements Planning
  • Material Requirements Planning -> Demand Management -> Sales and Operations Planning -> Long-term Planning -> Capacity Planning

Answer : Sales and Production Planning -> Demand Management -> long-term planning -> Material Requirements Planning -> Capacity Planning

SAP ECC, on the following information center can calculate the working capacity of the available standard capacity: - Start: 7:00: 00 - End: 3:00 pm 00 minutes 00 seconds - pause time: 1 hour - implementation rate: 80% - overload: 110% - individuals: 1 how much the standard available capacity?


Options are :

  • 5.6 hours
  • 7 hours
  • None
  • 6.16 hours
  • 8 hours

Answer : 5.6 hours

What action will reduce the required operational capabilities? (Choose three.)


Options are :

  • By reducing the amount of orders
  • Restructuring operations
  • Confirm the operation
  • Posting Goods Receipt for Production Order
  • Done by providing the state in the art (TECO)

Answer : By reducing the amount of orders Confirm the operation Done by providing the state in the art (TECO)

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

You want to improve the system of state orders for the production of user equipment. How do you do that?


Options are :

  • None
  • Definition Edit the location of your configuration file, and determine the order type
  • Profiles define the position of editor and determine the profile of its production plan.
  • Mode depending on the type of user specified order parameter.
  • Specifies the user's premise is adaptability table space.

Answer : Definition Edit the location of your configuration file, and determine the order type

The following activation which object backwash work? (Choose three.)


Options are :

  • Work Center
  • A main material (component)
  • routing
  • Material Master (product)

Answer : Work Center A main material (component) routing

Adapt to the design requirements, the team found that the option P1, P2, P3 and P4 provide, as standard, except MRP type PD. Each option represents the amount of compact type. What Firming defined? (Choose two.)


Options are :

  • Unplanned time processing of the fence existing procurement proposals.
  • For the treatment has been due to new requirements planning time fence to create a new purchase proposals.
  • Fence at the existing procurement process planning recommendations.
  • New requirements for the processing of planning time fence.

Answer : For the treatment has been due to new requirements planning time fence to create a new purchase proposals. Fence at the existing procurement process planning recommendations.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Establishing the route, wherein a first sequence including five (10, 20). When production bottlenecks, to be used centering 30 and 40, you can create a second episode in the system using any other work of the second sequence of what class?


Options are :

  • Ready to start over
  • Parallel sequences
  • None
  • ANonether sequence
  • Standard Order

Answer : ANonether sequence

What could be the result confirmed the operation?


Options are :

  • None
  • The planned cost is updated
  • The actual cost of interpretation
  • Production orders for playback
  • Capacity needs update

Answer : Capacity needs update

The company headquartered in, to produce a final product, "pound" (an LB) measured as a unit. The material currently sold in the EU market. A prerequisite for this is that the material can be sold to the unit "kg" (KG). What is the easiest way to meet this requirement?


Options are :

  • Create a new material, which refers to the original material, and to provide a new metric measurement matrix material.
  • None
  • There is None need to take any action. In this case, unit of measure conversion is performed automatically.
  • Determining a set of units to convert pounds to kilograms, and determines the basic crop material master basic data of one view.
  • Lbs kg added to substantially convert the material master view is a conversion factor.

Answer : There is None need to take any action. In this case, unit of measure conversion is performed automatically.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

If the lot size dependent material produced by its own host does Nonet change the routing update, what problems might arise?


Options are :

  • Delivery scheduling can take place.
  • For proper design requirements are substantially exception message schedule date.
  • Components used in the wrong time depends on the basic material needs, requirements planning date list.
  • None
  • The resulting design production capacity is None longer possible due to the timing parameters obsolete.

Answer : Components used in the wrong time depends on the basic material needs, requirements planning date list.

Which option is checked, when you create a production order routing will be there?


Options are :

  • Manual selection is maintained in the material master based on the routing list
  • None
  • Provided on the base, depending on the parameters manually select the type of command
  • Automatic selection based on the selection of the material of the main ID
  • Automatically selecting a reference set of operations

Answer : Provided on the base, depending on the parameters manually select the type of command

Which feature applies to 40 consumer strategy (design and assembly) of?


Options are :

  • Consumption and create static binding function independently of the entire procurement process of planning needs and customer requirements.
  • Consumption occurs in the planning material.
  • Consumption may increase the initial total production.
  • Consumption can reduce the size of the initial production volume.
  • None

Answer : Consumption may increase the initial total production.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

Which of the following is provided in SAP ECC MRP areas? (Choose two.)


Options are :

  • Make your subscription supports the production storage location MRP area.
  • MRP areas may belong to different storage locations.
  • Default can be given a different MRP areas.
  • Subcontracting support MRP area.

Answer : MRP areas may belong to different storage locations. Subcontracting support MRP area.

What functions can be completed before the release of production orders? (Choose three.)


Options are :

  • Dial Routing
  • Dispatch
  • BOM selection
  • OK stock

Answer : Dial Routing Dispatch BOM selection

What is the function of the SAP concern plans?


Options are :

  • Demand Management (DM) are identified and the corresponding elements create an invoice in the absence of material.
  • Long-term plan (LTP) is in the form of long-term forecasts.
  • None
  • Material Requirements Planning (MRP) includes an auto-leveling capability.
  • Master Production Scheduling (MPS) refers to the primary design important material.

Answer : Master Production Scheduling (MPS) refers to the primary design important material.

You can use it to organize the material staging assignment? (Choose three.)


Options are :

  • Down list
  • Material file
  • Transfer Order
  • Kanban

Answer : Down list Transfer Order Kanban

When you view the opportunity to keep working center, determined by the formula. Parameter calculation formula for the formula. What may be the origin of the scheduling formula parameters? (Choose three.)


Options are :

  • User-defined field operation route
  • For operation of the standard settings for the route
  • General Business Value Line
  • Common values work scheduling view of the material master

Answer : User-defined field operation route For operation of the standard settings for the route General Business Value Line

In the analysis of SAP planned order for the finished product orders report, it will be Noneted that in the final configuration is Nonet configured to automatically timely arrangements ahead of time available. Which you use design tools to create a planning point of view but feasible production plan?


Options are :

  • Delayed assembly design interactive
  • Total Design Online
  • It is a multi-level "simulation mode" option pistey Design
  • None
  • multi-level design "materials display a list" option

Answer : It is a multi-level "simulation mode" option pistey Design

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

What types of projects can be changed Change Management (ECM)? (Choose three.)


Options are :

  • Work Center
  • To Do
  • Production version
  • Material Master
  • BOM

Answer : To Do Material Master BOM

Objects may affect the requirements of the operational capability of computing? (Choose three.)


Options are :

  • Equation (Job Center)
  • Within the production time (material master)
  • Shuttle Time (routing)
  • Standard setting (route)
  • Motion controller (route)

Answer : Equation (Job Center) Standard setting (route) Motion controller (route)

What you need to use Kanban process master data material replenishment? (Choose two.)


Options are :

  • Control cycle
  • Exchange rate routing
  • Price Collector
  • Production supply area

Answer : Control cycle Production supply area

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

Which of the following apply to design multi-site SAP ECC?


Options are :

  • Multi-site planning similar strategies can be used to activate.
  • When using a single-step stock transfer, stock transfer to create a reception facility
  • And transfer withdrawal from alternative plant and aNonether plant is from the stock through a special procurement key definitions.
  • None
  • Use the "design" and a continuing need for multi-site planning.

Answer : And transfer withdrawal from alternative plant and aNonether plant is from the stock through a special procurement key definitions.

Stock / requirements to final product list includes only a sales order, and the same amount by a fixed planned orders. At the same time as the launch date MRP elements in the working day. Fixed planned order is later than the effective date of the sales order. However, None corresponding adjustment exception message appears. What could be the reason? (Choose two.)


Options are :

  • For the design requirements it is incomplete.
  • Fixed planned orders beyond the horizon of the restructuring.
  • The time between the introduction of the Delta, including tolerances specified editing.
  • MRP elements interconnected by a solid tie.

Answer : Fixed planned orders beyond the horizon of the restructuring. The time between the introduction of the Delta, including tolerances specified editing.

What is SAP Solution Manager?


Options are :

  • A landscape system to communicate with other independent system, and the system
  • Add-Industry Solutions
  • In the system control system landscape
  • None
  • SAP transaction system

Answer : A landscape system to communicate with other independent system, and the system

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

Which of the following most closely define the SAP ERP match?


Options are :

  • SAP ERP is a more efficient use of the company's applications business process management.
  • SAP ERP is a software application supports all processes involved in the entire customer lifecycle in direct contact with customers.
  • SAP ERP is a system, apparatus, including such as purchasing, sales and distribution, materials management and production.
  • SAP ERP system is in advanced planning and optimization process mapping.
  • None

Answer : SAP ERP is a more efficient use of the company's applications business process management.

Which of the following input object to confirm? (Choose two.)


Options are :

  • Trigger Point
  • Production Order
  • Production order operation
  • Work Center

Answer : Production Order Production order operation

When the SAP system, you can specify the production version?


Options are :

  • None
  • Invoices material
  • Routing Table
  • Work Center
  • Material Master

Answer : Material Master

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

When the master data object, you set the standard value <A <an action?


Options are :

  • routing
  • Work Center
  • Production resources / tools (PRT)
  • Material Master
  • None

Answer : routing

Which of these features make the SAP Supply Chain Management (SCM) offer?


Options are :

  • None
  • With the acquisition of optimization strategies vendor library
  • Across company boundaries designed supply chain
  • Customer interaction channels of different communication
  • Product development, safety, quality and service

Answer : Across company boundaries designed supply chain

Which of the following sequence elements that can be used in the process? (Choose three.)


Options are :

  • Sub-operation
  • Parallel sequences
  • Process Steps
  • Relationships

Answer : Sub-operation Process Steps Relationships

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 5

To be planned by the value of the final material Material Requirements Planning SAP system. As a result, the planned order should be arranged (Nonet lead to program) according to the latest schedule. Property-related needs of the application which generated the following?


Options are :

  • None
  • When a customer orders to create the finished material, the material is automatically triggered according to the requirements of the Act of ingredients are Nonet scheduled to run.
  • Multi-level backward scheduling, depending on the requirements of the trip, start date of the planned order of the finished material.
  • If a separate material parts have been dedicated to routing operations, depending on the requirements demand date of each scheduled start date of operation.
  • Multi-level scheduling backward, depending on the exact requirements of the second calculated.

Answer : Multi-level backward scheduling, depending on the requirements of the trip, start date of the planned order of the finished material.

In which the following items required repetitive production of master data? (Choose three.)


Options are :

  • Production version
  • Price Collector
  • Repetitive Manufacturing
  • Production supply area

Answer : Production version Price Collector Repetitive Manufacturing

Which of the following types of plans may only be used in the design of capacity?


Options are :

  • forward
  • midpoint
  • None
  • backward
  • Only capacity requirements

Answer : midpoint

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 1

The assembly should be finished only when a customer order has been received to use. Each finished product strategy, How about you?


Options are :

  • The plan does Nonet end components (Policy 50)
  • The design is assembly level (strategy 70)
  • Makeup design stock (strategy 10)
  • And assembly planning (strategy 40)
  • None

Answer : The plan does Nonet end components (Policy 50)

In the project phase, the client proposed acquisition of SAP material master system parameter types of problems. Which of the following procurement types of features to be effective? (Choose two.)


Options are :

  • If Procurement Type E (make your own) has been set, outsourcing is still possible, depending on the type of material.
  • If you purchase two types are allowed to enter the X (both procurement types), demand planning according to their own production.
  • Procurement type E (own production) and F (outsourcing) always need to be further refined special type of procurement.
  • Contract Type E (own production), F (external power supply) or X (both acquisition s) may be selected from the material, regardless of the type of material.

Answer : If Procurement Type E (make your own) has been set, outsourcing is still possible, depending on the type of material. If you purchase two types are allowed to enter the X (both procurement types), demand planning according to their own production.

You need to think about the order that triggered the ATP check SAP customers how to do?


Options are :

  • ATP check determines if Nonet available, it then checks the next step, or whether the current collecting production is possible.
  • ATP amended to establish a fixed contact customer order and confirm their receipt.
  • None
  • ATP amount can be used to confirm the amount of incoming customer orders to use.
  • ATP check does Nonet consider inventory and receipts. It checks the planned independent requirements of the consumer.

Answer : ATP amount can be used to confirm the amount of incoming customer orders to use.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 2

Which of the following organizational measures can be minimized by using the Kanban program?


Options are :

  • None
  • Efforts to sales and operations planning (SOP)
  • Master Data Maintenance
  • Preparation efforts
  • Capacity planning efforts

Answer : Preparation efforts

What is the order of the following components which do Nonet deal with that? (Choose three.)


Options are :

  • Relationships
  • Parallel sequences
  • Process Description Features
  • stage
  • Destination Information

Answer : Relationships Process Description Features stage

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 3

Which of the following statements is true simulation of material requirements planning in SAP ECC connection status?


Options are :

  • Analysis of delay emulation mode is turned on. The final product of recombination within the design manual and the following requirements will result in a solution is feasible to design the angle. However, this solution may cause the date / time violation in the final product.
  • Assuming the critical path delay time, the emulation mode is finished, so that the reception timing delayed from the bottom up to the level of the received trigger.
  • In analog mode design requirements, the demand side has created a procurement unit in the case of premature use.
  • Simulation model represents an interactive multi-layered exterior design, the result is automatically released when the database is running to plan.
  • None

Answer : Analysis of delay emulation mode is turned on. The final product of recombination within the design manual and the following requirements will result in a solution is feasible to design the angle. However, this solution may cause the date / time violation in the final product.

The materials you need to use the Kanban process is always available to add the following master data? (Choose two.)


Options are :

  • Production, circulation
  • Control cycle
  • Price Collector
  • Currency route

Answer : Production, circulation Control cycle

Which of the following conditions must be met mission is to interface to transfer data entered into the system's plant data collection (PDC PP)? (Choose three.)


Options are :

  • The step is used to operate instructions stored.
  • The order includes at least one operation, consisting of a central subsystem to the work of the group.
  • PP-PDC's application program interface is activated, so that the production order type.
  • Order has been released.

Answer : The order includes at least one operation, consisting of a central subsystem to the work of the group. PP-PDC's application program interface is activated, so that the production order type. Order has been released.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 4

Prepare materials in connection with the SAP system design design requirements in a controlled manner. The planned orders using the so-called basic programming day (unleaded schedule) schedule. Which of the following is the correct result depends on demand?


Options are :

  • When you create a customer bill in the final product order-related demand triggered automatically material part is Nonet scheduled to run.
  • Multi-level backward scheduling, the requirements depend on the date on which the components are triggered high levels of planned orders.
  • If during operation specifically for the respective material components in the BOM and routing services, the demand of these elements depends on the date of the start date is the amount required for each operation.
  • Multi-level scheduling pass, depending on required top configure the starting date of the trigger.
  • None

Answer : Multi-level scheduling pass, depending on required top configure the starting date of the trigger.