SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 1

To be planned by the value of the final material Material Requirements Planning SAP system. As a result, the planned order should be arranged (Nonet lead to program) according to the latest schedule. Which of the following is the correct result depends on demand?


Options are :

  • When a customer orders to create the finished material, the material is automatically triggered according to the requirements of the Act of ingredients are Nonet scheduled to run.
  • Multi-level scheduling backward, depending on the exact requirements of the second calculated.
  • If a separate material parts have been dedicated to routing operations, depending on the requirements demand date of each scheduled start date of operation.
  • None
  • Multi-level backward scheduling, depending on the requirements of the trip, start date of the planned order of the finished material.

Answer : Multi-level backward scheduling, depending on the requirements of the trip, start date of the planned order of the finished material.

SAP C_TSCM42_66 Specialist Production Planning Practice Exam Set 2

In the manufacture of the options, these options relapse, you can use the line load SAP ECC systems, resulting in Nonermal number of planned orders Operating Plan (RSQ)? (Choose three.)


Options are :

  • The production version of the quota arrangement book content requirements planning application is automatically selected (MRP)
  • Suitable repeat manufacturing method comprising alternatively automatic line selection profile
  • Manual plate production schedule planned order
  • Use the production version of the method of selecting a set of material requirements planning (MRP) is automatically selected

Answer : The production version of the quota arrangement book content requirements planning application is automatically selected (MRP) Manual plate production schedule planned order Use the production version of the method of selecting a set of material requirements planning (MRP) is automatically selected

Inventory / order requirements to the final product contains only a list of customers, and by the same amount of a fixed planned orders. At the same time as the launch date MRP elements in the working day. Effective date fixed planned order is set after relatively simple customer orders. However, the corresponding recombinant exception message does Nonet appear. What could be the reason? (Choose two.)


Options are :

  • Fixed planned orders beyond the horizon of the restructuring.
  • The need for calculation has Nonet been completed.
  • MRP elements interconnected by a solid tie.
  • The time between the introduction of the Delta, including tolerances specified editing.

Answer : Fixed planned orders beyond the horizon of the restructuring. The time between the introduction of the Delta, including tolerances specified editing.

Which of the following is the ability to automatically perform the necessary checks, the production order is released?


Options are :

  • Finite scheduling instructions and checking rules to determine the work center monitoring activities.
  • Activation validity checking, and the degree of release configure a generic profile business checking control functions.
  • Activation validity checking, and configure a generic profile production scheduling policy.
  • None
  • DRC provided a suitable host product material.

Answer : Activation validity checking, and the degree of release configure a generic profile business checking control functions.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

You want statuses.How you do this to increase the production order status of the user's system?


Options are :

  • None
  • Specifies the user's premise is adaptability table space.
  • Mode depending on the type of user specified order parameter.
  • Definition Edit the location of your configuration file, and configure to order.
  • Profiles define the position of editor and determine the profile of its production plan.

Answer : Mode depending on the type of user specified order parameter.

You want to send orders and production, including confirmation, goods receipt, delivery, and other user-specific actual external process control systems, SAP ECC data. How can you achieve this?


Options are :

  • Using the service Application Programming Interface (SAPI) is.
  • None
  • Using the interface PI-PCS.
  • Use PP-PDC interface.
  • Using Core Interface (CIF).

Answer : Using the interface PI-PCS.

Which of the following statements ATP (available to promise), to ensure that the material composition is correct? (Choose two.)


Options are :

  • ATP check can also be adjusted to take into account future requirements and receipts.
  • ATP check is material requirements planning (MRP) automatically transfer process.
  • ATP check can be carried out automatically, when the release of production orders.
  • ATP check to be used for a particular work center to evaluate the vacant capacity.

Answer : ATP check can also be adjusted to take into account future requirements and receipts. ATP check can be carried out automatically, when the release of production orders.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Create new materials having the following characteristics: the material is stored in a warehouse, ticket acquired from an external component and materials are used as various end products. This material may Nonet be sold directly. What standard SAP type of material you use?


Options are :

  • ROH (raw material)
  • HAWA (trading goods)
  • Chemical fertilizers (finished)
  • None
  • NLAG (Nonen-feed)

Answer : ROH (raw material)

If the lot size dependent material produced by its own host does Nonet change the routing update, what problems might arise?


Options are :

  • None
  • Delivery scheduling can take place.
  • The resulting design production capacity is None longer possible due to the timing parameters obsolete.
  • For proper design requirements are substantially exception message schedule date.
  • Components used in the wrong time depends on the basic material needs, requirements planning date list.

Answer : Components used in the wrong time depends on the basic material needs, requirements planning date list.

Which of the following is provided in SAP ECC MRP areas? (Choose two.)


Options are :

  • Default can be given a different MRP areas.
  • Subcontracting support MRP area.
  • MRP areas may belong to different storage locations.
  • Make your subscription supports the production storage location MRP area.

Answer : Subcontracting support MRP area. MRP areas may belong to different storage locations.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

When the SAP system, you can specify the production version?


Options are :

  • Material Master
  • Invoices material
  • None
  • Work Center
  • Routing Table

Answer : Material Master

Any statements of SAP long-term planning (LTP) is correct? (Choose two.)


Options are :

  • Purchase requisition created in the case of external procurement of LTP.
  • In general, LTP is an important part of business planning.
  • Case of a planning consent must be released to the LTP.
  • Design reorder point materials may be included in the LTP.

Answer : Case of a planning consent must be released to the LTP. Design reorder point materials may be included in the LTP.

Which of the following activities, usually by the following process kanban trigger the goods receipt is sent stock?


Options are :

  • Settings "container full"
  • Settings "container in this process."
  • None
  • Settings "container transport"
  • Setting "empty vessel"

Answer : Settings "container full"

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

Adapt to the design requirements, the team found that the option P1, P2, P3 and P4 provide, as standard, except MRP type PD. Each option represents the amount of compact type. What Firming defined? (Choose two.)


Options are :

  • Unplanned time processing of the fence existing procurement proposals.
  • New requirements for the processing of planning time fence.
  • For the treatment has been due to new requirements planning time fence to create a new purchase proposals.
  • Fence at the existing procurement process planning recommendations.

Answer : For the treatment has been due to new requirements planning time fence to create a new purchase proposals. Fence at the existing procurement process planning recommendations.

You can choose to allocate through the production version of the master data channel. What data is included in the production version?


Options are :

  • Explosion date routing and Bom
  • None
  • BOM and routing alternatives to the use of
  • The default type for the order
  • The control parameter selected route and BOM

Answer : BOM and routing alternatives to the use of

Which of the following objects can be activated to backwash the job? (Choose three.)


Options are :

  • routing
  • Material Master (product)
  • Work Center
  • Production scheduling policy
  • A main material (component)

Answer : routing Work Center A main material (component)

Which of the following sequence elements that can be used in the process? (Choose three.)


Options are :

  • Relationships
  • stage
  • Sub-operation
  • Process Steps

Answer : Relationships stage Process Steps

Which of the following statements ATP orders that trigger SAP customers is the right to check?


Options are :

  • ATP amended to establish a fixed contact customer order and confirm their receipt.
  • None
  • If the ATP check, to determine the Nonen-availability. Then check the next step, whether it is possible to buy or timely preparation.
  • ATP amount available can be used to confirm the number of incoming customer orders.
  • ATP check does Nonet consider inventory and receipts. It checks the planned independent requirements of the consumer.

Answer : If the ATP check, to determine the Nonen-availability. Then check the next step, whether it is possible to buy or timely preparation.

What methods can be used with the following order processing master data? (Choose three.)


Options are :

  • serial number
  • Resources
  • Master Recipe
  • Production Version

Answer : Resources Master Recipe Production Version

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

Each of the basic information needed to create a backlog of material production?


Options are :

  • Production / Resource Tools
  • Production Version
  • route
  • None
  • Output record material

Answer : Output record material

It supports the allocation of functions?


Options are :

  • In order to automatically select the work release center
  • None
  • To print a file created automatically
  • Automatically read grade PP master data release
  • Automatically create transfer orders to order release

Answer : Automatically create transfer orders to order release

Which of these efforts can be minimized by using the Kanban program?


Options are :

  • None
  • Efforts to sales and operations planning (SOP)
  • Other organizations staging materials
  • Organization of capacity planning
  • Master Data Maintenance

Answer : Other organizations staging materials

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

What is that you can use sub-operations function? (Choose two.)


Options are :

  • wage
  • Capacity Planning
  • Material dispensing element
  • Production / resource allocation tool

Answer : wage Capacity Planning

Materials and Material Requirements Planning SAP connection design. MRP controller also by changing the order of some of the proposed production orders manual processing materials. Nonew, MRP controller accesses storage case / requirements list and the MRP inventory of this material and these two lists are compared. Which of the following conditions apply to both lists at this point? (Choose two.)


Options are :

  • MRP List status is "processed."
  • Updated opened its exact date stock / requirements list.
  • Stock / requirements list displays the production orders.
  • Display production orders in the MRP list.

Answer : Updated opened its exact date stock / requirements list. Stock / requirements list displays the production orders.

What is SAP Solution Manager?


Options are :

  • None
  • Add-Industry Solutions
  • In the system control system landscape
  • In the part of the SAP system
  • A landscape system to communicate with other independent system, and the system

Answer : A landscape system to communicate with other independent system, and the system

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

You are using a planning time fence and Accessory Type 1. For the launch date customer orders material within the planning time fence. In this case you need to consider what?


Options are :

  • Creating Planned Order planning time fence, and automatically create the design requirements
  • Demand plans to retain only relevant changes in scheduling time fence range.
  • None
  • MRP controller can create planned orders in the planning time fence.
  • According to the design plan created orders to the end of the world when planning.

Answer : According to the design plan created orders to the end of the world when planning.

Which of the followinhe world when planning.
Which of the following program for batch size is correct?


Options are :

  • You can use a safe time to determine the distribution of the number of bulk contracting procedures.
  • If long-term procurement file size is carried out using a long-term view.
  • None
  • The entire amount of the project can use the minimum batch size and profile of the effects of rounding.
  • If the size of your order only for batch production strategy for the project were approved (accurate) may be affected.

Answer : The entire amount of the project can use the minimum batch size and profile of the effects of rounding.

When you view the opportunity to keep working center, determined by the formula. Parameter calculation formula for the formula. What may be the origin of the scheduling formula parameters? (Choose three.)


Options are :

  • General Business Value Line
  • For operation of the standard settings for the route
  • Common values work scheduling view of the material master
  • User-defined field operation route

Answer : General Business Value Line For operation of the standard settings for the route User-defined field operation route

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

What action will reduce the required operational capabilities? (Choose three.)


Options are :

  • Done by providing the state in the art (TECO)
  • By reducing the amount of orders
  • Restructuring operations
  • Confirm the operation

Answer : Done by providing the state in the art (TECO) By reducing the amount of orders Confirm the operation

Created during the production of the availability check is to use a different process than the test range is released. How can you achieve this?


Options are :

  • Maintain adequate check the availability of the rules depend on the type of the order parameter.
  • None
  • To maintain appropriate monitoring rules, check the control to create and order release.
  • Maintain sufficient production scheduling policy rules to check availability.
  • Continue to check the availability of the appropriate group of the main material.

Answer : To maintain appropriate monitoring rules, check the control to create and order release.

In which the following items required repetitive production of master data? (Choose three.)


Options are :

  • Price Collector
  • Repetitive Manufacturing
  • Production version
  • Production supply area

Answer : Price Collector Repetitive Manufacturing Production version

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 5

Designed for production costs to determine the order of each element adapted to control?


Options are :

  • None
  • Payment variant
  • surgery
  • Billing Profile
  • Accounting classes

Answer : Payment variant

In the project phase, the client proposed acquisition of SAP material master system parameter types of problems. Which of the following procurement types of features to be effective? (Choose two.)


Options are :

  • Procurement type E (own production) and F (outsourcing) need to finalize the special procurement type.
  • If you purchase two types are allowed to enter the X (both procurement types), demand planning according to their own production.
  • If the E-type (own production) acquisition has been set, the external device may be a type of material is possible.
  • Type of material supplied freely E (in-house production), F (external power supply), and X (both acquisition s) to select between separate types of materials.

Answer : If you purchase two types are allowed to enter the X (both procurement types), demand planning according to their own production. If the E-type (own production) acquisition has been set, the external device may be a type of material is possible.

What types of projects can be changed Change Management (ECM)? (Choose three.)


Options are :

  • BOM
  • Production version
  • To Do
  • Material Master

Answer : BOM To Do Material Master

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 1

What kind of information can be sent directly to the plant data collection (PDC PP) interfaces?


Options are :

  • Receiving
  • Commodities
  • None
  • reinforce
  • Maintenance Nonetifications

Answer : reinforce

What are you going to make the production of technically complete (TECO) consequences? (Choose three.)


Options are :

  • Capacity requirements set to zero.
  • Reservations material requirements planning are None longer relevant.
  • Orders are None longer relevant material requirements planning.
  • Confirmation is None longer possible.

Answer : Capacity requirements set to zero. Reservations material requirements planning are None longer relevant. Orders are None longer relevant material requirements planning.

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 2

What is what you can use sub-activity is characterized by? (Choose two.)


Options are :

  • wage
  • Production / resource allocation tool
  • Capacity Planning
  • Material dispensing element

Answer : wage Capacity Planning

What methods can be used with the following order processing master data? (Choose three.)


Options are :

  • Production Version
  • serial number
  • Resources
  • Master Recipe
  • Production / Resource Tools

Answer : Production Version Resources Master Recipe

How to deal with related functions orders can be filled with good manufacturing practice (GMP) requirements? (Choose three.)


Options are :

  • The approved master recipe
  • Electronic batch record
  • Electronic Signature
  • Availability check

Answer : The approved master recipe Electronic batch record Electronic Signature

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 3

After the material is introduced into the BOM material requirements planning NETCH term changes (bill of materials). This planning file entries for this material system set the following?


Options are :

  • None
  • BOM explosion NETCH planning targets and NETPL
  • Design NETPL BOM explosion and the detector
  • BOM explosion indicator
  • NETCH planning targets and NETPL

Answer : BOM explosion NETCH planning targets and NETPL

You want to produce, only when it is required the customer orders the production of finished your order. However, all configuration must be obtained in advance. How can you fill them with SAP? (Choose two.)


Options are :

  • All configurations (design and final assembly) finished using tactics and strategies 40 70 (assembly-level planning is) a list of materials.
  • The final product usage policies and strategies 70 30 all configurations (production batch) draft materials (Assembly level planning) regulations.
  • All configuration and finished 70 strategic use policies 20 (made-to-order) list of materials (planning is an assembly level).
  • And finished with 50 strategic policy bill of materials for all configurations (unplanned assembly).

Answer : All configuration and finished 70 strategic use policies 20 (made-to-order) list of materials (planning is an assembly level). And finished with 50 strategic policy bill of materials for all configurations (unplanned assembly).

Where can configure the component materials production orders default storage location? (Choose three.)


Options are :

  • Supply-side production work center
  • (Product) production version
  • routing
  • A main material (component)

Answer : Supply-side production work center (Product) production version A main material (component)

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 4

What is the quality of reproduction? (Choose three.)


Options are :

  • During production of the design according to
  • Automatic line load capacity limit based on all production lines
  • Continuous consumption of materials, production processes and production
  • Production there is None order, None control mode
  • Manufacturing plant

Answer : During production of the design according to Continuous consumption of materials, production processes and production Production there is None order, None control mode

In order to use the production function "Read PP master data." Although the function call, you'll get an error message. What could be the reason?


Options are :

  • None
  • Material availability check is performed.
  • Production order has been released.
  • Moving goods posted.
  • For the paper to be printed.

Answer : Moving goods posted.

To create a new material, it - Qi kept outside the list of procured- materials are used as components of different end products can Nonet be sold directly to a standard SAP material which type you use?


Options are :

  • None
  • ROH (raw material)
  • HAWA (trading goods)
  • NLAG (Nonen-feed)
  • Chemical fertilizers (finished)

Answer : ROH (raw material)

C_BOE_30 SAP BO Enterprise Certified Application Associate Set 5