SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 8

Which of the following elements you need to prepare to pay a production plant in order to function correctly? (Choose three.)


Options are :

  • To propose a standard text key to the workstation.
  • Specify the type of order to pay for the variants. (Correct)
  • Use the operation control indicator pay-relevant. (Correct)
  • Enter formulas to pay for the work center. (Correct)

Answer : Specify the type of order to pay for the variants. Use the operation control indicator pay-relevant. Enter formulas to pay for the work center.

Customer testing options for the planned orders using the SAP firming of the test material. Therefore, the client set the firming date stock / requirements list manually. In addition, the client set the planning time fence one tightens the type of material master. How result of firming time interval than in this situation?


Options are :

  • None
  • According to the firming process mechanism tightens a longer time interval (Correct)
  • The design unit of time is limited functions of the master material,
  • Manual Firming Date
  • It is a pre-adaptation.

Answer : According to the firming process mechanism tightens a longer time interval

Which recur in the manufacturing of options you can use to make a line loading of SAP ECC system, and thus create a run schedule quantities (RSQ) of the normal planned orders? (Choose three)


Options are :

  • Automatic selection of production determined by the MRP group used in material requirements planning (MRP)
  • Manual planned order sheet production volumes are planning table (Correct)
  • Automatic selection of the production version of the application of a quota arrangement book content requirements planning (MRP) (Correct)
  • Automatic selection of the production version of the material requirements planning (MRP) using the selection methods of setting (Correct)

Answer : Manual planned order sheet production volumes are planning table Automatic selection of the production version of the application of a quota arrangement book content requirements planning (MRP) Automatic selection of the production version of the material requirements planning (MRP) using the selection methods of setting

SAP P_HCMTM_64 Certified Professional - HCM Talent Mngt Exam Set 2

In production, the processing of orders, which of the following objects to enter the confirmation? (Choose three.)


Options are :

  • Action / suboperation (Correct)
  • work center
  • Order (Correct)
  • individual capacity (Correct)

Answer : Action / suboperation Order individual capacity

Which supports the function assignments?


Options are :

  • Automatic creation of transfer orders to order release (Correct)
  • Automatic reading grade PP master data release
  • Automatic printing of documents in order to create a
  • None
  • Automatic selection of the work center in order release

Answer : Automatic creation of transfer orders to order release

What types of items can be changed Change requests? (Choose three.)


Options are :

  • To-do list (Correct)
  • Bill of Materials (Correct)
  • work center
  • material Master (Correct)

Answer : To-do list Bill of Materials material Master

The company wants to use SAP requirements planning, together with the procedure NETPL (net change planning in planning horizon). The planning horizon should be given equally to all media by default. However, some materials have to be different planning horizon. What do you recommend to set the planning horizon?


Options are :

  • Set the planning horizon adaptation of the plant parameters and store the abnormal marking material masters similar materials.
  • Set the planning horizon for MRP groups, and give anomalous entries via the factory setting parameters editing.
  • None
  • Set the adjustment and give the planning horizon now parameters different from the corresponding entries via the MRP groups of materials. (Correct)
  • Set the MRP planning horizon from Customizing and store abnormal markings material masters in charge of materials.

Answer : Set the adjustment and give the planning horizon now parameters different from the corresponding entries via the MRP groups of materials.

Which of the following activities, which are usually triggered by KANBAN procedure later in stock sending the receipt of the goods?


Options are :

  • Set Container empty
  • Set Container running
  • None
  • Set Container full (Correct)
  • Set Container traffic

Answer : Set Container full

Which of the following statements in the planning functions of SAP are true? (Choose two.)


Options are :

  • Material Requirements Planning (MRP) does not include the auto-leveling capacity. (Correct)
  • Long-term planning (LTP) is in the form of a forecast long-term planning.
  • The master production scheduling (MPS) refers to the primary design of important materials. (Correct)
  • Demand Management (DM) material shortage situations are identified and given the requirement coverage elements.

Answer : Material Requirements Planning (MRP) does not include the auto-leveling capacity. The master production scheduling (MPS) refers to the primary design of important materials.

SAP C_THR12_66 Certified Application Associate - HCM Exam Set 5

Which of the following is necessary for the capacity availability check that can be performed automatically when the production order is released?


Options are :

  • None
  • Checks to set a suitable master the rule of the material of the product.
  • Place the finite scheduling indicator and checking rule determines the Work Center for the activities reviewed.
  • Activate availability check and configure a generic profile production scheduling profile.
  • To activate the availability check and configure a generic profile checking supervision order type / plant combination. (Correct)

Answer : To activate the availability check and configure a generic profile checking supervision order type / plant combination.

Which of the following master data is necessary to create a reserve of material production orders?


Options are :

  • None
  • material output record (Correct)
  • production versions
  • Production / resource tools
  • routings

Answer : material output record

The user has entered a planning strategy group 10 (make-to-stock production), the master material (SAP) of the product. In the coming few months, the requirements of the type of claim LSF (derived from the main strategy 10) is designed. The user wants to change the requirements type LSF with VSF design and final assembly (strategy in accordance with Article 40) The requirements of the production plan, which has already been stored. Which of the following statements are applicable to this case? (Choose two.)


Options are :

  • Strategy of the group can be changed from 10 to 40 in the current production plan and a requirement for the type of all the requirements will change automatically.
  • The present requirement of the product can be changed manually LSF VSF that the requirement for the Type field production plan, so that a new strategy for the next 40 to determine the planning activities. (Correct)
  • The user has the requirement to change the type of strategy 10 with VSF design and final assembly of adaptation. The claim type for all the current requirements, then switched automatically.
  • The user can enter new strategy, a group of 40 in the material master of the product, but the requirement type does not automatically change the existing requirements. (Correct)

Answer : The present requirement of the product can be changed manually LSF VSF that the requirement for the Type field production plan, so that a new strategy for the next 40 to determine the planning activities. The user can enter new strategy, a group of 40 in the material master of the product, but the requirement type does not automatically change the existing requirements.

The customer does not want to take care of the warehouse value-intensive materials. These materials should be obtained directly from the production order. Every product BOM group has set the meet this requirement?


Options are :

  • N (non-stock) (Correct)
  • None
  • D (document Edition)
  • M (phantom material)
  • E (external procurement)

Answer : N (non-stock)

Which statements are true ECC long-term planning (LTP)? (Choose two.)


Options are :

  • In the case of external procurement, long-term planning creates procurement proposals.
  • Long-term planning is generally the operational planning of important components.
  • Reorder point designed materials can be incorporated into long-term planning. (Correct)
  • A planning consent scenario must be released to use it long-term planning. (Correct)

Answer : Reorder point designed materials can be incorporated into long-term planning. A planning consent scenario must be released to use it long-term planning.

Instruct the user wishes to move the variable A method for automatic processing instructions directly to particular workstations and machinery production department (for example, high speed, the compression pressure, the dry temperature). The user also wants to get a variable-on messages (such as actual amounts, the actual time) for the processing of these workstations and machines and their messages, feedback on production orders. Which of the following would you recommend to implement these requirements?


Options are :

  • SAP Application Link of (ALE)
  • None
  • Assessment Stages (XSteps) and process messages (Correct)
  • SAP Business Intelligence (BI)
  • Plant data (PP PDC) interface

Answer : Assessment Stages (XSteps) and process messages

SAP C_TSCM42_66 Certified Associate - Production Exam Set 5

Which of the following objects can be activated backflushing components, if you want to use this function during the order confirmation? (Choose three.)


Options are :

  • Material Master (Component) (Correct)
  • routing (Correct)
  • Production Scheduling Profile
  • work center (Correct)

Answer : Material Master (Component) routing work center

What you need to consider in relation to the size of the batch procedures?


Options are :

  • the entire amount of the item can be influenced using the minimum lot size and a rounding profile. (Correct)
  • None
  • If the size of the long-term tranche of the procurement is conducted using a long-term perspective.
  • If you make an order production strategy is used only for the lot-for-lot (exact) size of the item may be subject.
  • Number of the contracting procedure for the whole lot can be determined using the time profile of safety.

Answer : the entire amount of the item can be influenced using the minimum lot size and a rounding profile.

Availability inspection during the production creation would be to use a different scope than the check during order release. How can you meet this requirement?


Options are :

  • Maintain adequate checking the availability of the rules depend on the parameters of the order type.
  • Maintain adequate checking the availability of the rules of production scheduling profile.
  • None
  • Keep checking the availability of the appropriate group of master material.
  • To maintain appropriate monitoring rules, check the control creation and order release. (Correct)

Answer : To maintain appropriate monitoring rules, check the control creation and order release.

Where can define the valid receivers production order costs?


Options are :

  • settlement profile (Correct)
  • In the valuation variant
  • In the variant costs
  • None
  • Production Scheduling Profile

Answer : settlement profile

Which of the following functions are available in SAP for capacity leveling? (Choose three)


Options are :

  • The focal point of scheduling (Correct)
  • lot size optimization
  • Batch size optimization
  • A finite capacity scheduling (Correct)
  • Setup time reduction (Correct)

Answer : The focal point of scheduling A finite capacity scheduling Setup time reduction

You choose the master data channel assignments through the production versions. Which data are included in the production version?


Options are :

  • type used in the default order
  • Explosion dates routing and Bom
  • Control of parameters selected routes and BOM
  • None
  • A routing and BOM alternatives for use (Correct)

Answer : A routing and BOM alternatives for use

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 7

When modeling your production SAP ECC, with business levels you will be able to create a Bill of Material (BOM)? (Choose two)


Options are :

  • At the industry level
  • The factory level (Correct)
  • The workstation level (Correct)
  • At the company code level

Answer : The factory level The workstation level

What you need to consider with regard to consumption? (Choose two)


Options are :

  • Consumption is essential envisaged between the independent claims and planned orders.
  • Consumption can occur between order bookings and the planned independent requirements, depending on the strategy. (Correct)
  • Consumption is the renovation of the planning run.
  • Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group. (Correct)

Answer : Consumption can occur between order bookings and the planned independent requirements, depending on the strategy. Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group.

When you maintain a center of work, the formulas to determine the timing of view. Formulas used to calculate the parameters of the formula. What may be the origin of the formula parameters for scheduling? (Choose three.)


Options are :

  • Public values the work scheduling view of the material master
  • The general operation values to-do list (Correct)
  • Standard value of the operation-do list (Correct)
  • User-defined field in the operation do list (Correct)

Answer : The general operation values to-do list Standard value of the operation-do list User-defined field in the operation do list

Which data forms the basis for calculating the capacity requirement for the operation? (Choose three.)


Options are :

  • In-house production time (material masters)
  • Standard settings (routing) (Correct)
  • Formulas (job center) (Correct)
  • Action Controller (routing) (Correct)

Answer : Standard settings (routing) Formulas (job center) Action Controller (routing)