SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 7

Which of the following situations occurs when the production order is set to Technically Complete (TECO)? (Choose three.)


Options are :

  • Capacity Needs removed. (Correct)
  • Bookings will be deleted. (Correct)
  • The order and the operations receive the system status Locked (LKD).
  • The order is no longer relevant Material Requirements Planning. (Correct)

Answer : Capacity Needs removed. Bookings will be deleted. The order is no longer relevant Material Requirements Planning.

SAP C_TSCM62_65 Certified Associate - Order Fulfilment Exam Set 6

Which of the following master data you do not need to make use of repetitive manufacture? (Choose three.)


Options are :

  • Repetitive Manufacturing (Correct)
  • production versions (Correct)
  • Product price Collector (Correct)
  • The master record of the serial numbers

Answer : Repetitive Manufacturing production versions Product price Collector

Which of the following components do not process the order is? (Choose three.)


Options are :

  • parallel sequences
  • Interpersonal relationships (Correct)
  • stages of (Correct)
  • the destination information
  • Characteristic process instructions (Correct)

Answer : Interpersonal relationships stages of Characteristic process instructions

The ready material is designed in a controlled manner in connection with SAP system design requirements. The planned orders are scheduled using a so-called basic programming day (no lead-scheduling). Which of the following statements is true for the result depends on the requirements?


Options are :

  • Multi-level backward scheduling, the requirements depend on the date of the assembly is triggered higher-level planned order.
  • When a customer order is created in the final product dependent requirements automatically trigger the bill of material components without planning run.
  • If the individual material components are specifically addressed to during operation of the BOM and routing service, the requirement dates dependent on the requirements of these components is the amount of each of the operation start dates.
  • Multi-level scheduling pass, the requirements depend on the starting date triggered the upper-level configuration. (Correct)
  • None

Answer : Multi-level scheduling pass, the requirements depend on the starting date triggered the upper-level configuration.

Which of the following statements is true for ATP (available to promise) availability check in SAP ECC, which starts from the customer order?


Options are :

  • If the ATP check reveals is not available, it can check whether it is still possible to buy or prepare in time.
  • ATP check does not strengthen against the stocks and receipts, check it against the consumption of the design requirements.
  • An availability check using ATP creates a solid contact to customer orders and confirmed their receipts.
  • ATP amount is the quantity still available that can be used to confirm the incoming customer orders. (Correct)
  • None

Answer : ATP amount is the quantity still available that can be used to confirm the incoming customer orders.

Which settings can you give to someone who uses the SAP system mandates and requires the support material supply in production? (Choose three.)


Options are :

  • Pull list (Correct)
  • Selection list (Correct)
  • material directory
  • Automatic generation of traffic order (Correct)

Answer : Pull list Selection list Automatic generation of traffic order

Which of the following criteria are used to support process orders?


Options are :

  • Linkage orders documents
  • Documentation of production using an electronic batch record (Correct)
  • None
  • Use a reference-based series
  • Production equipment / resource tools

Answer : Documentation of production using an electronic batch record

What information can be sent directly to the Plant Data Collection (PDC PP) interface?


Options are :

  • Maintenance notifications
  • Goods issues
  • None
  • reinforcements (Correct)
  • Goods receipts

Answer : reinforcements

During the processing of production orders, planned and actual costs are determined. Which of the following items, you can collect these costs? (Choose two)


Options are :

  • work center
  • planned order
  • Product price Collector (Correct)
  • production orders (Correct)

Answer : Product price Collector production orders

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 5

You shape strategy group 10 (make-to-stock production), the master material (SAP) material. In the coming months, you have planned requirements type LSF requirement (derived from the main strategy 10). Now you want to change the type of claim (40 accordance with its strategy, design and final assembly) LSF VSF and the requirements of the current production plan. Which of the following scenarios are applicable to this case? (Choose two)


Options are :

  • You need to change the requirement type of VSF adaptation strategy 10. The claim type for all the existing requirements are then converted to the next planning run.
  • You can change the strategy group from 10 to 40 current production plan in the host material, and the requirement for all the requirements type will change automatically.
  • You can write a Strategy Group 40 material master, but a requirement type can not automatically change the existing requirements. (Correct)
  • You can write a Strategy Group 40 in the material master and change the current requirement in accordance with the product manually plan production. (Correct)

Answer : You can write a Strategy Group 40 material master, but a requirement type can not automatically change the existing requirements. You can write a Strategy Group 40 in the material master and change the current requirement in accordance with the product manually plan production.

Every adaptation element controls designed for the determination of the cost of production orders?


Options are :

  • None
  • pays variant (Correct)
  • operation
  • Settlement profile
  • accounting type

Answer : pays variant

When analyzing the SAP order report planned order for the finished product, one will notice that the configurations are not available in time to schedule the final configuration as the automatic forward timing. What would you use the design to deal with the problem in order to create a solution that is from the point of view of the requirements of the design feasible?


Options are :

  • Interactive yksittäispisteytyksiä for the design of delay in assembly
  • Total design online
  • Multi-level yksittäispisteytyksiä with design simulation mode option (Correct)
  • Multi-level design with yksittäispisteytyksiä Display results before saving option
  • None

Answer : Multi-level yksittäispisteytyksiä with design simulation mode option

SAP ECC, you want to make a general inventory of production in-house production process. Marked area depending on the size of the batch of house production time is occupied, the material of the master of the final product is created. These fields can be maintained by updating the scheduling result associated with the routing. You now think that there could be significant changes in the production time routing and decides that the updating of the host material. What's the problem, this could lead?


Options are :

  • Turnaround time scheduling, which occurs at the point that the planned order is converted to a production order (at the latest) may undergo an incorrect dates on the basis of the basic information.
  • scheduling requirements for the year, the basic design dates, depend on the requirements to request the bill of materials components at the wrong times. (Correct)
  • Requirements Planning impinges exception message based scheduling dates as the material of the master parameters do not match the routing control scheduling result.
  • The resulting design production capacity is no longer possible due to outdated timing parameters.
  • None

Answer : scheduling requirements for the year, the basic design dates, depend on the requirements to request the bill of materials components at the wrong times.

Which of the following SAP Solution Manager in the list is the right one?


Options are :

  • Solution Manager is a standalone system that communicates with other systems in the system landscape. (Correct)
  • The solution was Manager is part of the SAP system.
  • None
  • Solution Manager is an add-industry solution.
  • Solution Manager is a satellite system in the system landscape.

Answer : Solution Manager is a standalone system that communicates with other systems in the system landscape.

Which objects can you use in the production order component of the material suggests the storage location of the provision? (Choose three.)


Options are :

  • work center (Correct)
  • the production version (Correct)
  • Material master (Component) (Correct)
  • routing

Answer : work center the production version Material master (Component)

SAP C_TSCM52_66 Certified Associate - Procurement Exam Set 1

What you need to consider when using SAP's long-term planning (LTP)? (Choose two)


Options are :

  • A planning consent scenario must be released before it can be used for LTP. (Correct)
  • LTP creates purchase requisitions for external procurement.
  • Reorder point designed materials can be included in the LTP. (Correct)
  • LTP will focus on the important parts of the operational planning.

Answer : A planning consent scenario must be released before it can be used for LTP. Reorder point designed materials can be included in the LTP.

What date you can no longer use the Read PP master data production sequence?


Options are :

  • None
  • After the placing, the number of fixed component of the material due to material availability check carried out.
  • From the release of the production order.
  • When the first transmission of movements of goods or confirmation (Correct)
  • After printing, the order papers.

Answer : When the first transmission of movements of goods or confirmation

You are using a planning time fence and the attachment type 1. For a customer order material availability date within the planning time fence. What you need to consider in this scenario?


Options are :

  • None
  • MRP controller can create planned orders within the planning time fence.
  • The planned orders are created planning time fence and automatically establishes requirements for the design.
  • The planned orders created by the requirements of the design is transferred to the end of the planning time fence. (Correct)
  • Requirements planning to keep only the changes that are relevant to scheduling within the framework of the planning time fence.

Answer : The planned orders created by the requirements of the design is transferred to the end of the planning time fence.

You want to reduce the uncertainty caused by the varying requirements of the finished product dynamic safety stock in SAP ECC. Specifications which is a dynamic safety stock calculation is based on?


Options are :

  • The average daily demand and the desired coverage area (Correct)
  • The average daily demand and the backup time
  • Static safety equipment and material forecast
  • Static safety stock and safety time per day
  • None

Answer : The average daily demand and the desired coverage area

The company would like to advise the material availability check carried out automatically production of the different points in time. Which of the following would you recommend? (Choose two.)


Options are :

  • Goods Receipt manufactured product subscription
  • Creating a production order (Correct)
  • The release of a production order (Correct)
  • To ensure that the materials of the measure indicated by the auditee

Answer : Creating a production order The release of a production order

What options for repetitive manufacturing line loading can be used to perform the SAP system and thus produces a Run Time Traffic (RSQ) of the normal planned orders? (Choose three.)


Options are :

  • Using the design algorithm for capacity planning.
  • Automatic selection of the production version of the material requirements planning (MRP) using the dial setting methods. (Correct)
  • Automatic selection of the production version of the application of a quota arrangement book content requirements planning (MRP). (Correct)
  • Manual planned order sheet production volumes are planning table. (Correct)

Answer : Automatic selection of the production version of the material requirements planning (MRP) using the dial setting methods. Automatic selection of the production version of the application of a quota arrangement book content requirements planning (MRP). Manual planned order sheet production volumes are planning table.

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 3

In what order you keep track of the maintenance of master data to determine the production of the material?


Options are :

  • Create BOM -> Create workstations -> Create Routing -> Run component or task Bom routing (Correct)
  • None
  • Create BOM -> Create workstations -> Create Routing -> Run in the center of the component of the work
  • Create workstations -> Create Routing -> Create BOM -> Run in the center of the component of the work
  • Create a Routing -> Create workstations -> Create BOM -> Run component or task Bom routing

Answer : Create BOM -> Create workstations -> Create Routing -> Run component or task Bom routing

Which of the following requirements for a production plant can be supported by using the method of manufacturing? (Choose three.)


Options are :

  • The master recipe-based manufacturing. (Correct)
  • the amount corresponding to manufacturing. (Correct)
  • Material requirements planning production resources.
  • Calculation of variable amounts of a substance (for example, the production, the use of the material). (Correct)

Answer : The master recipe-based manufacturing. the amount corresponding to manufacturing. Calculation of variable amounts of a substance (for example, the production, the use of the material).

The sequence in which the steps of the material requirements planning is carried out in SAP?


Options are :

  • 1. Net requirements calculation 2. Lot sizing 3. Determination of the type of acquisition 4. Timing (Correct)
  • 1. Balance Amendment 2. Lot sizing 3. Determination of the type of acquisition 4. Timing
  • 1. Net requirements calculation 2. Lot sizing 3. Timing 4. Determination of the acquisition type
  • None
  • 1. Calculation of safety stock dimensioning 2. Batch 3. Timing 4. Determination of the acquisition type

Answer : 1. Net requirements calculation 2. Lot sizing 3. Determination of the type of acquisition 4. Timing

What you need to consider when you use ATP (available to promise) to ensure the material? (Choose two)


Options are :

  • ATP checks can also be adjusted to consider the demands of the future and receipts. (Correct)
  • ATP checks can be carried out automatically, when the release of the production order. (Correct)
  • ATP checks is carried out automatically during the Material Requirements Planning (MRP) passes.
  • ATP checks will be used to evaluate the free capacity in a particular work center.

Answer : ATP checks can also be adjusted to consider the demands of the future and receipts. ATP checks can be carried out automatically, when the release of the production order.

Material designed in connection with the SAP material requirements planning. MRP controller further processed material manually by changing the order of certain of the proposed production order. Now MRP controller accesses the storage situation / requirements list and the MRP inventory This material and compares these two lists. What you need to consider two lists at this point? (Choose two)


Options are :

  • The MRP list shows the production order.
  • Stocks / requirements list displays the production order. (Correct)
  • Stocks / requirements list was updated when it opened. (Correct)
  • MRP list status is "processed".

Answer : Stocks / requirements list displays the production order. Stocks / requirements list was updated when it opened.

What is characteristic of state si-regulation and content requirements planning in SAP ECC?


Options are :

  • It is triggered by a multi-level bottom-up scheduling.
  • It posts the design results in a database automatically.
  • It turned exception messages to the finished component.
  • None
  • It calculates the delay that may occur in the design. (Correct)

Answer : It calculates the delay that may occur in the design.

SAP C_TFIN52_66 Certify Associate Financial Accounting Exam Set 3

Which of the following master data you do not need to adjust the manufacture process? (Choose three.)


Options are :

  • production versions (Correct)
  • resources (Correct)
  • serial numbers
  • The basic advice (Correct)

Answer : production versions resources The basic advice

What are the names of the integration process, the objects of production orders? (Choose two)


Options are :

  • PI sheets
  • control commands (Correct)
  • Work instructions (Correct)
  • control recipes

Answer : control commands Work instructions

The company's design strategies used in SAP ECC demand management, which are based on consumption. Which of the following statements is true consumption? (Choose two.)


Options are :

  • Consumer can also visit the order bookings and the planned independent requirements, depending on the strategy. (Correct)
  • Consumption always occurs independent of the proposed requirements for the level of the material and the planned orders.
  • Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group. (Correct)
  • Consumption situation is dynamic and is always planning the renovation period.

Answer : Consumer can also visit the order bookings and the planned independent requirements, depending on the strategy. Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group.