SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 4

In what order you keep track of the maintenance of master data to determine the production of the material?


Options are :

  • Create a Routing -> Create workstations -> Create BOM -> Run component or task Bom routing
  • Create BOM -> Create workstations -> Create Routing -> Run component or task Bom routing (Correct)
  • Create BOM -> Create workstations -> Create Routing -> Run in the center of the component of the work
  • None
  • Create workstations -> Create Routing -> Create BOM -> Run in the center of the component of the work

Answer : Create BOM -> Create workstations -> Create Routing -> Run component or task Bom routing

The sequence in which the steps of the material requirements planning is carried out in SAP?


Options are :

  • Net Requirements calculation, Lot design, the definition of the type of acquisition, scheduling (Correct)
  • Net requirements calculation, Lot sizing, scheduling, setting the acquisition type
  • Availability check
  • Calculation of safety stock, Lot sizing, scheduling, setting the acquisition type
  • None

Answer : Net Requirements calculation, Lot design, the definition of the type of acquisition, scheduling

What features are ECC Master Production Scheduling (MPS) is? (Choose three)


Options are :

  • MPS items can be taken into account in the standard MRP run.
  • MPS also can be defined as MRP Area level. (Correct)
  • MPS items can be defined at the level of enterprises (Correct)
  • MPS to be taken into account in an MPS term. (Correct)

Answer : MPS also can be defined as MRP Area level. MPS items can be defined at the level of enterprises MPS to be taken into account in an MPS term.

Viewing counsel will ask you to allow the user to produce materials in stock, the customer orders, projects, orders and cost centers of production orders. Where you can make regulations to ensure these options?


Options are :

  • None
  • Settlement profile. (Correct)
  • Production scheduling profile.
  • The serial number profile.
  • The valuation variant.

Answer : Settlement profile.

Every activity can trigger the automatic availability check for components production order?


Options are :

  • Goods receipt for the missing part
  • None
  • to restructuring
  • order release (Correct)
  • material staging

Answer : order release

What can you use to organize the material staging assignments? (Choose three)


Options are :

  • Logistics Information System (LIS)
  • Pull list (Correct)
  • transfer orders (Correct)
  • KANBAN (Correct)

Answer : Pull list transfer orders KANBAN

Which option is selected routing exists when creating a production order?


Options are :

  • Manual selection is based on the routing list is maintained in the material master
  • production scheduling profile based on automatic settings
  • Automatic selection of the reference operation set
  • None
  • Manual selection on the basis of the settings depend on the type of order parameters (Correct)

Answer : Manual selection on the basis of the settings depend on the type of order parameters

The company is based in the United States to produce the final product, which is used as a unit of measurement "pounds" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold to the unit "kg" (KG). What is the easiest way to meet this requirement?


Options are :

  • None
  • Determine the unit of a group to convert pounds to kilograms, and determines the basic tailoring of the material master basic data of one view.
  • There is no need to take any action. In this scenario, the conversion of measurement units takes place automatically. (Correct)
  • Add a conversion factor to convert pounds kilograms of basic data view of the material master 1.
  • Create a new material, which refers to the original material and provides a metric unit of measurement of a host of new material.

Answer : There is no need to take any action. In this scenario, the conversion of measurement units takes place automatically.

What master data you need material replenishment using KANBAN procedure? (Choose two)


Options are :

  • Product price Collector
  • Rate routing
  • Production supply area (Correct)
  • control cycle (Correct)

Answer : Production supply area control cycle

Which of the following criteria are used to support process orders?


Options are :

  • None
  • Linkage orders documents
  • Use a reference-based series
  • Documentation of production using an electronic batch record (Correct)
  • Production equipment / resource tools

Answer : Documentation of production using an electronic batch record

Every statement on the size of the batch procedures is correct?


Options are :

  • If the make-order production strategy is in use, a lot of a lot of (exact) batch size is always determined by obtaining the corresponding element.
  • If the item is long-term use, long-term procurement is conducted
  • the total number of the batch may be affected by using the minimum quantity and rounding profile. (Correct)
  • None
  • Number of the contracting procedure for the whole lot can be determined using the time profile of safety.

Answer : the total number of the batch may be affected by using the minimum quantity and rounding profile.

SAP C_TSCM52_66 Certified Associate Financial Accounts Test Set 2

Customer testing options for the planned orders using the SAP firming of the test material. Therefore, the client set the firming date stock / requirements list manually. In addition, the client set the planning time fence one tightens the type of material master. How result of firming time interval than in this situation?


Options are :

  • By firming mechanism, which extends further into the future. (Correct)
  • Manual Firming Date
  • It is a pre-adaptation.
  • The design unit of time is limited functions of the master material,
  • None

Answer : By firming mechanism, which extends further into the future.

What are the qualities repetitive manufacturing? (Choose three)


Options are :

  • Automatic line loading capacity limits based on all production lines
  • Production without orders and without any control mode (Correct)
  • Continuous material consumption, production flow and yield (Correct)
  • Period, based on the design of the quantities produced (Correct)

Answer : Production without orders and without any control mode Continuous material consumption, production flow and yield Period, based on the design of the quantities produced

Which of the following applies to design multi-site SAP ECC?


Options are :

  • When using a one-step stock transfer posting, transfer of stock is created in the host plant.
  • As well as the withdrawal of another alternative crops and stock transfer of the plant is defined through a special procurement keys. (Correct)
  • The use of "design scope" (cross-plant total design) is mandatory for multi-site planning.
  • None
  • Multi-site planning can be activated using a similar strategy.

Answer : As well as the withdrawal of another alternative crops and stock transfer of the plant is defined through a special procurement keys.

Which of the following statements is correct consumption? (Choose two)


Options are :

  • Consumption is the renovation of the planning run.
  • Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group. (Correct)
  • Consumption is essential envisaged between the independent claims and planned orders.
  • Consumption can occur between order bookings and the planned independent requirements, depending on the strategy. (Correct)

Answer : Consumption parameters (for consumption and space consumption in the interval) can be set to the host material or the MRP group. Consumption can occur between order bookings and the planned independent requirements, depending on the strategy.

SAP ECC, you can calculate the available standard capacity of the center of the work capacity the following information: Start: 7:00:00 End: 3:00:00 p.m. Break Duration: 1 hour Rate of utilization: 80% Overload: 110% Number of individuals: 1. How big is the usual available the capacity?


Options are :

  • 7 hours
  • 8 hours
  • None
  • 5.6 hours (Correct)
  • 6.16 hours

Answer : 5.6 hours

Where standard operating times for an operation defined?


Options are :

  • routing (Correct)
  • material Master
  • Production Resource / Tool (PRT)
  • work center
  • None

Answer : routing

SAP P_HCMTM_64 Certified Professional - HCM Talent Mngt Exam Set 2

Which of the following effects arise when the production order is set to Technically Complete (TECO)? (Choose three)


Options are :

  • Confirmations are no longer allowed.
  • The order is no longer relevant material requirements planning. (Correct)
  • Capacity Needs is set to zero. (Correct)
  • The order and the operations receive the system status Locked (LKD).
  • Bookings are no longer relevant material requirements planning. (Correct)

Answer : The order is no longer relevant material requirements planning. Capacity Needs is set to zero. Bookings are no longer relevant material requirements planning.

You want to reduce the uncertainty caused by the varying requirements of the finished product dynamic safety stock in SAP ECC. Specifications which is a dynamic safety stock calculation is based on?


Options are :

  • None
  • The average daily demand and the backup time
  • Static safety equipment and material forecast
  • Static safety stock and safety time per day
  • The average daily demand and the desired days of consumption (Correct)

Answer : The average daily demand and the desired days of consumption

Creation of routing, which involves five first sequence (10, 20, 30, 40, 50). When capacity bottlenecks, you should be able to use the other work of the second sequence What sequence class action centers 30 and 40. you are using to create the second episode in the system?


Options are :

  • None
  • standard order
  • substitute sequence
  • An alternative sequence (Correct)
  • parallel sequence

Answer : An alternative sequence

Maintained your strategy group 10 (make-to-stock production), the master material (SAP) material. In the coming months you have planned requirements type LSF requirement (derived from the main strategy 10). Now you want to change the type of claim (40 accordance with its strategy, design and final assembly) LSF VSF and the requirements of the current production plan. Which of the following statements are applicable to this case? (Choose two)


Options are :

  • You can change the strategy group from 10 to 40 current production plan in the host material, and the requirement for all the requirements type will change automatically.
  • You need to change the requirement type of VSF adaptation strategy 10. The claim type for all the existing requirements are then converted to run on next planning period
  • You can write a Strategy Group 40 material master, but a requirement type can not automatically change the existing requirements. (Correct)
  • You can write a Strategy Group 40 in the material master and change the current requirement in accordance with the product manually plan production. (Correct)

Answer : You can write a Strategy Group 40 material master, but a requirement type can not automatically change the existing requirements. You can write a Strategy Group 40 in the material master and change the current requirement in accordance with the product manually plan production.

When analyzing the SAP order report planned order for the finished product, one will notice that the configurations are not available in time to schedule the final configuration as the automatic forward timing. Which do you use the design to create a feasible production plan from the planning point of view of the tool?


Options are :

  • Multi-level yksittäispisteytyksiä design with "simulation mode" option (Correct)
  • Total design online
  • None
  • Multi-level yksittäispisteytyksiä design with "display of the material list" option
  • Interactive yksittäispisteytyksiä for the design of delay in assembly

Answer : Multi-level yksittäispisteytyksiä design with "simulation mode" option

Which of the following requirements for a production plant can be supported by using mandates? (Choose three.)


Options are :

  • Variable amounts of material calculation (generation, consumption of material) and the operation amounts.
  • Integrated display of documents (drawings, texts) in the production process. (Correct)
  • Customer requirements depending on the production. (Correct)
  • Make-to-stock production. (Correct)

Answer : Integrated display of documents (drawings, texts) in the production process. Customer requirements depending on the production. Make-to-stock production.

SAP C_TFIN52_66 Certify Associate Financial Accounting Exam Set 3

Which of the following scheduling types can be used only within the capacity planning?


Options are :

  • None
  • Backwards
  • Forward
  • Only capacity requirements
  • midpoint (Correct)

Answer : midpoint

Which of the following functions making SAP Supply Chain Management (SCM) offer?


Options are :

  • None
  • Communication with customers through a variety of interactions.
  • Planning and optimization of supply chains across company boundaries (Correct)
  • Product development, safety, quality and service
  • Optimization strategy with the acquisition of the supplier pool.

Answer : Planning and optimization of supply chains across company boundaries

What features related to process orders can be filled with Good Manufacturing Practices (GMP) requirements? (Choose three)


Options are :

  • Availability check
  • Digital signature (Correct)
  • electronic batch record (Correct)
  • The approved master recipes (Correct)

Answer : Digital signature electronic batch record The approved master recipes

Objects that may affect the calculation of capacity requirements for the operation? (Choose three)


Options are :

  • Formulas (job center) (Correct)
  • Action Controller (routing) (Correct)
  • Standard settings (routing) (Correct)
  • Shuttle Time (routing)

Answer : Formulas (job center) Action Controller (routing) Standard settings (routing)

You want to use the function "Read PP master data" in the production order. Although the function call you will get an error message. What could be the reason?


Options are :

  • None
  • Goods movements are posted. (Correct)
  • For the papers are printed.
  • A production order has been released.
  • Material availability check is carried out.

Answer : Goods movements are posted.

Which of the following functions are available in SAP leveling system overload for individual work centers with capacity planning tools? (Choose three.)


Options are :

  • A finite capacity scheduling (Correct)
  • Batch size optimization
  • Setup time reduction (Correct)
  • The focal point of scheduling (Correct)

Answer : A finite capacity scheduling Setup time reduction The focal point of scheduling

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 2

The customer does not want to take care of the warehouse value-intensive materials. These materials should be obtained directly from the production order. Every product BOM group has set the meet this requirement?


Options are :

  • M (phantom material)
  • None
  • D (document Edition)
  • E (external procurement)
  • N (non-stock) (Correct)

Answer : N (non-stock)