SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 3

Which of the following items of master data needed for the production of repetitive? (Choose three)


Options are :

  • Product price Collector (Correct)
  • Repetitive Manufacturing (Correct)
  • the production version (Correct)
  • Production supply area

Answer : Product price Collector Repetitive Manufacturing the production version

Where the SAP system, you can specify the production versions?


Options are :

  • Material master (Correct)
  • None
  • The invoice material
  • The work center
  • routing list

Answer : Material master

Which of the following types of schedules may only be used in the design of capacity?


Options are :

  • midpoint (Correct)
  • Backwards
  • None
  • Only capacity requirements
  • Forward

Answer : midpoint

SAP C_TSCM62_65 Certified Associate - Order Fulfilment Exam Set 1

Stocks / requirements to the final product list includes only one sales order and one fixed planned order by the same amount. Availability dates for both the MRP elements are in working days. Availability date fixed planned order is set later than one sales order. However, the corresponding restructuring exception message does not appear. What could be the reason? (Choose two)


Options are :

  • Requirements for design is not complete.
  • MRP elements are interconnected by a solid tie.
  • availability dates between Delta includes editing the tolerance range specified. (Correct)
  • The fixed planned order is out of the reorganization of the horizon. (Correct)

Answer : availability dates between Delta includes editing the tolerance range specified. The fixed planned order is out of the reorganization of the horizon.

Which of the following most closely matches the defined SAP ERP?


Options are :

  • SAP ERP is a software application that supports all processes involving direct contact with the customer throughout the customer's life cycle.
  • None
  • SAP ERP is a system, apparatus, which includes components such as purchasing, sales and distribution, materials management and production.
  • SAP ERP is a system in which advanced planning and optimization of processes to be mapped.
  • SAP ERP is the application that can use the company's management of business processes more efficiently. (Correct)

Answer : SAP ERP is the application that can use the company's management of business processes more efficiently.

Creation of routing, which involves five first sequence (10, 20, 30, 40, 50). When capacity bottlenecks, you want to use any other work of the second sequence Centers 30 and 40. What class do you use in order to create the second episode in the system?


Options are :

  • Ready-start ratio
  • None
  • An alternative sequence (Correct)
  • standard order
  • parallel sequence

Answer : An alternative sequence

Which of the following applies to design multi-site SAP ECC?


Options are :

  • When using a one-step stock transfer posting, transfer of stock to create a reception facility
  • None
  • Multi-site planning can be activated using a similar strategy.
  • As well as withdrawal from an alternative plant and stock transfer from another plant is defined through a special procurement keys. (Correct)
  • The use of "the scope of design" has always required a multi-site planning.

Answer : As well as withdrawal from an alternative plant and stock transfer from another plant is defined through a special procurement keys.

Every activity can trigger the automatic availability check for components production order?


Options are :

  • material staging
  • order release (Correct)
  • to restructuring
  • Goods receipt for the missing part
  • None

Answer : order release

When you maintain a center of work, the formulas to determine the timing of view. Formulas used to calculate the parameters of the formula. What may be the origin of the formula parameters for scheduling? (Choose three)


Options are :

  • Standard settings for operation of routes (Correct)
  • User-defined fields operational routes (Correct)
  • General operating values of routes (Correct)
  • Common values of work scheduling view of the material master

Answer : Standard settings for operation of routes User-defined fields operational routes General operating values of routes

SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 1

Which of the following organizational measures can be minimized by using KANBAN procedure?


Options are :

  • The master data maintenance effort
  • Effort material staging (Correct)
  • Effort sales and operations planning (SOP)
  • None
  • Effort capacity planning

Answer : Effort material staging

Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)


Options are :

  • MPS also can be defined as MRP area level. (Correct)
  • The design of the MPS and the MPS items are always in one term planning.
  • MPS planned items, the standard MRP run.
  • MPS to be taken into account in an MPS term. (Correct)
  • MPS items can be defined at the level of the plant. (Correct)

Answer : MPS also can be defined as MRP area level. MPS to be taken into account in an MPS term. MPS items can be defined at the level of the plant.

What could be the result confirmed the operation?


Options are :

  • Capacity needs updating (Correct)
  • Production order for play
  • Actual costs explained
  • None
  • The planned costs are updated

Answer : Capacity needs updating

Which of the following objects to activate the back flushing assignments? (Choose three)


Options are :

  • work center (Correct)
  • Material master (Component) (Correct)
  • Material master (finished product)
  • routing (Correct)

Answer : work center Material master (Component) routing

What is the SAP Solution Manager?


Options are :

  • The transaction SAP system
  • Controlled system in the system landscape
  • The add-industry solution
  • None
  • A standalone system that communicates with other systems in the system landscape (Correct)

Answer : A standalone system that communicates with other systems in the system landscape

You want to produce the finished product only when it is requested to the customer's order to place your order production. However, all configurations must be obtained in advance. How can you fill them with SAP? (Choose two)


Options are :

  • Use strategy 50 (Planning without final assembly) of the finished product and strategy all configurations of the bill of material. (Correct)
  • Use strategy 30 (production lots) of the final product and strategy 70 (Planning Assembly level) Bill all configurations of the material.
  • Use strategy 20 (make an order production) finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material. (Correct)
  • Use strategy 40 (design and final assembly) of finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material.

Answer : Use strategy 50 (Planning without final assembly) of the finished product and strategy all configurations of the bill of material. Use strategy 20 (make an order production) finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material.

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 7

Which feature applies to the consumption of 40 strategy (design and final assembly)?


Options are :

  • Consumption may increase the total production volume initially. (Correct)
  • Consumption can reduce the size of initial production volumes.
  • Consumption creates static and binding function independent from the planned requirements and customer requirements throughout the procurement process.
  • None
  • Consumption takes place in the planning material.

Answer : Consumption may increase the total production volume initially.

The company is based in the United States to produce the final product, which is used as a unit of measurement "pounds" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold to the unit "kg" (KG). What is the easiest way to meet this requirement?


Options are :

  • Determine the unit of a group to convert pounds to kilograms, and determines the basic tailoring of the material master basic data of one view.
  • Add a conversion factor to convert pounds kilograms of basic data view of the material master 1.
  • Create a new material, which refers to the original material and provides a metric unit of measurement of a host of new material.
  • None
  • There is no need to take any action. In this scenario, the conversion of measurement units takes place automatically. (Correct)

Answer : There is no need to take any action. In this scenario, the conversion of measurement units takes place automatically.

What can you use to organize the material staging assignments? (Choose three)


Options are :

  • transfer orders (Correct)
  • material documents
  • KANBAN (Correct)
  • Pull list (Correct)

Answer : transfer orders KANBAN Pull list

You want to use the function "Read PP master data" in the production order. Although the function call you will get an error message. What could be the reason?


Options are :

  • Material availability check is carried out.
  • Goods movements are posted. (Correct)
  • For the papers are printed.
  • A production order has been released.
  • None

Answer : Goods movements are posted.

During the project phase, the client raises questions concerning the type of acquisition parameters for the material master SAP system. Which of the following procurement type characteristics are valid? (Choose two)


Options are :

  • If both procurement types are permitted entry X (both procurement types), requirements planning based on own production. (Correct)
  • Contract Type E (own production), F (external supply) or X (both acquisition s) may be selected from a material, regardless of the type of material.
  • Procurement types E (own production) and F (external procurement) always need to be further refined special procurement types.
  • If Procurement type E (own production) has been set, the external procurement may still be possible, depending on the material type. (Correct)

Answer : If both procurement types are permitted entry X (both procurement types), requirements planning based on own production. If Procurement type E (own production) has been set, the external procurement may still be possible, depending on the material type.

You want to use different options for the design of SAP ECC. What is the correct sequence of planning procedures?


Options are :

  • Sales and Production Planning -> Demand Management -> Long Range Planning -> Material Requirements Planning -> Capacity Planning (Correct)
  • Material Requirements Planning -> Demand Management -> Sales and Operations Planning -> Long Range Planning -> Capacity Planning
  • Demand Management -> Sales and Operations Planning -> Capacity Planning -> Long Term Planning -> Material Requirements Planning
  • Long-term planning -> Sales and Operations Planning -> Demand Management -> Material Requirements Planning -> Capacity Planning
  • None

Answer : Sales and Production Planning -> Demand Management -> Long Range Planning -> Material Requirements Planning -> Capacity Planning

SAP C_THR12_66 Certified Application Associate - HCM Exam Set 4

To plan the final material by means of the value of the material requirements planning SAP system. As a result, the planned orders should be scheduled based on date scheduling (not lead to a schedule). Which of the following properties of the resulting dependent requirements apply?


Options are :

  • When a customer's order to create a finished material, depending on the requirements of the bill automatically trigger the components of the material without planning run.
  • Multi-level backward scheduling, depend on the requirements of calculated the exact second.
  • If the individual material components are specifically addressed to the routing operation, the requirement dates depend on the requirements of each scheduled start date of the operation.
  • Multi-level backward scheduling, depend on the requirements of trips start date of a planned order of the finished material. (Correct)
  • None

Answer : Multi-level backward scheduling, depend on the requirements of trips start date of a planned order of the finished material.

What action would reduce the capacity requirements for the operation? (Choose three)


Options are :

  • By setting the status technically completed (TECO) (Correct)
  • Posting goods receipt for the production order
  • A restructuring operation
  • confirming the operation (Correct)
  • By reducing the amount of the order (Correct)

Answer : By setting the status technically completed (TECO) confirming the operation By reducing the amount of the order

What is the plan for the functions of the following SAP concerns?


Options are :

  • Demand Management (DM) lack of material situations are identified and the corresponding receipt elements are created.
  • The master production scheduling (MPS) refers to the primary design of important materials. (Correct)
  • Material Requirements Planning (MRP) includes an automatic leveling capacity.
  • Long-term planning (LTP) is in the form of long-term forecasting.
  • None

Answer : The master production scheduling (MPS) refers to the primary design of important materials.

What types of items can be changed change management (ECM)? (Choose three)


Options are :

  • work center
  • To-do list (Correct)
  • the production version
  • Bill of material (Correct)
  • material master (Correct)

Answer : To-do list Bill of material material master

You want to use different options for the design of SAP ECC. What is the correct sequence of planning procedures?


Options are :

  • Material Requirements Planning -> Demand Management -> Sales and Operations Planning -> Long Range Planning -> Capacity Planning
  • Long-term planning -> Sales and Operations Planning -> Demand Management -> Material Requirements Planning -> Capacity Planning
  • Demand Management -> Sales and Operations Planning -> Capacity Planning -> Long Term Planning -> Material Requirements Planning
  • None
  • Sales and Production Planning -> Demand Management -> Long Range Planning -> Material Requirements Planning -> Capacity Planning (Correct)

Answer : Sales and Production Planning -> Demand Management -> Long Range Planning -> Material Requirements Planning -> Capacity Planning

Where can define the valid receivers production order costs?


Options are :

  • None
  • In the variant costs
  • Production Scheduling Profile
  • settlement profile (Correct)
  • In the valuation variant

Answer : settlement profile

The company wants to use SAP requirements planning, together with the procedure NETPL (net change planning in planning horizon). The planning horizon should be given equally to all media by default. However, some materials have to be different planning horizon. What procedure do you recommend to set the planning horizon?


Options are :

  • Set the MRP planning horizon from Customizing and store conversion values corresponding to the material masters of materials.
  • Set the adjustment and store the transformation parameters of the planning horizon now marking material masters similar materials.
  • Set the MRP planning horizon from Customizing and determines the conversion entries through the factory parameter settings.
  • Place the adaptation of the planning horizon using the factory parameter settings and set the conversion entries via the MRP groups of similar materials. (Correct)
  • None

Answer : Place the adaptation of the planning horizon using the factory parameter settings and set the conversion entries via the MRP groups of similar materials.

You want to produce the finished product only when it is requested to the customer's order to place your order production. However, all configurations must be obtained in advance. How can you fill them with SAP? (Choose two)


Options are :

  • Use strategy 50 (Planning without final assembly) of the finished product and strategy all configurations of the bill of material. (Correct)
  • Use strategy 30 (production lots) of the final product and strategy 70 (Planning Assembly level) Bill all configurations of the material.
  • Use strategy 20 (make an order production) finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material. (Correct)
  • Use strategy 40 (design and final assembly) of finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material.

Answer : Use strategy 50 (Planning without final assembly) of the finished product and strategy all configurations of the bill of material. Use strategy 20 (make an order production) finished product and strategy 70 (Planning is an assembly level) for all configurations of the bill of material.

SAP P_HCMTM_64 Certified Professional - HCM Talent Mngt Exam Set 2

Where the master data object you set the standard values ??for an operation?


Options are :

  • material Master
  • routing (Correct)
  • work center
  • Production Resource / Tool (PRT)
  • None

Answer : routing