SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 2

When you maintain a center of work, the formulas to determine the timing of view. Formulas used to calculate the parameters of the formula. What may be the origin of the formula parameters for scheduling? (Choose three)


Options are :

  • General operating values of routes (Correct)
  • User-defined fields operational routes (Correct)
  • Common values of work scheduling view of the material master
  • Standard settings for operation of routes (Correct)

Answer : General operating values of routes User-defined fields operational routes Standard settings for operation of routes

Which of the following efforts can be minimized by using the KANBAN procedure?


Options are :

  • Effort sales and operations planning (SOP)
  • None
  • The organization of staging other material (Correct)
  • Organizational effort for capacity planning
  • The master data maintenance effort

Answer : The organization of staging other material

What are the features you can use suboperations? (Choose two)


Options are :

  • Production / resource allocation tools
  • pay (Correct)
  • Material component allocation
  • capacity Planning (Correct)

Answer : pay capacity Planning

Which of the following is necessary to check the ability to be carried out automatically when the production order is released?


Options are :

  • Place the finite scheduling indicator and checking rule determines the Work Center for the activities reviewed.
  • Activate availability check and configure a generic profile checking the degree of control the business function release. (Correct)
  • Activate availability check and configure a generic profile production scheduling profile.
  • None
  • Checks to set a suitable master the rule of the material of the product.

Answer : Activate availability check and configure a generic profile checking the degree of control the business function release.

SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 8

You want to improve the system of production order statuses user statuses.How you do this?


Options are :

  • Specifies the user modes depend on the type of order parameters. (Correct)
  • Define the position of edit your profile and determine its production scheduling profile.
  • Specifies the user's premises is the adaptation of the system table spaces.
  • Define the position of edit your profile and configure it according to the order.
  • None

Answer : Specifies the user modes depend on the type of order parameters.

Which of the following objects to enter the confirmation? (Choose two)


Options are :

  • work center
  • The trigger point
  • Production order operation (Correct)
  • production orders (Correct)

Answer : Production order operation production orders

Which option is selected routing will be there when you create a production order?


Options are :

  • Automatic selection based on the selection of the material master ID
  • Manual selection on the basis of the settings depend on the type of order parameters (Correct)
  • None
  • Manual selection is based on the routing list is maintained in the material master
  • Automatic selection of the reference operation set

Answer : Manual selection on the basis of the settings depend on the type of order parameters

What are the consequences in order to make the production of technically Complete (TECO)? (Choose three)


Options are :

  • Bookings are no longer relevant material requirements planning. (Correct)
  • Capacity Needs is set to zero. (Correct)
  • The order is no longer relevant material requirements planning. (Correct)
  • Confirmations are no longer possible.

Answer : Bookings are no longer relevant material requirements planning. Capacity Needs is set to zero. The order is no longer relevant material requirements planning.

Final assembly of the finished product should be used only when a customer order has been received. Every strategy of the finished product do you use?


Options are :

  • None
  • The design is assembly level (strategy 70)
  • Planning without final assembly (strategy 50) (Correct)
  • Planning with final assembly (strategy 40)
  • Design of make-to-stock (strategy 10)

Answer : Planning without final assembly (strategy 50)

SAP C_THR12_66 Certified Associate - Human Capital Exam Set 5

Which of the following elements can be used in the process in order? (Choose three)


Options are :

  • process steps (Correct)
  • parallel sequences
  • suboperations (Correct)
  • Interpersonal relationships (Correct)

Answer : process steps suboperations Interpersonal relationships

Objects that may affect the calculation of capacity requirements for the operation? (Choose three)


Options are :

  • Formulas (job center) (Correct)
  • Standard settings (routing) (Correct)
  • Action Controller (routing) (Correct)
  • In-house production time (material masters)
  • Shuttle Time (routing)

Answer : Formulas (job center) Standard settings (routing) Action Controller (routing)

What problem can occur if the lot size dependent's own production of the material time the host is not updated after changing the routing?


Options are :

  • None
  • The resulting design production capacity is no longer possible due to outdated timing parameters.
  • Lead time scheduling can take place.
  • Dependent on the requirements to request the components used at the wrong times of the basic material of a list of scheduling dates. (Correct)
  • Requirements for the design gets the proper exception to the basic message scheduling dates.

Answer : Dependent on the requirements to request the components used at the wrong times of the basic material of a list of scheduling dates.

To create a new material, which - kei remains externally procured- bills of material are used as a component in different final products can not be sold directly to a standard SAP material which type do you use?


Options are :

  • None
  • HAWA (trading good)
  • FERT (finished product)
  • ROH (raw material) (Correct)
  • NLAG (non-raw material)

Answer : ROH (raw material)

What are the qualities repetitive manufacturing? (Choose three)


Options are :

  • Period, based on the design of the quantities produced (Correct)
  • Production without orders and without any control mode (Correct)
  • shop fabrication
  • Continuous material consumption, production flow and yield (Correct)
  • Automatic line loading capacity limits based on all production lines

Answer : Period, based on the design of the quantities produced Production without orders and without any control mode Continuous material consumption, production flow and yield

What are the features you can use sub activities? (Choose two)


Options are :

  • capacity Planning (Correct)
  • pay (Correct)
  • Production / resource allocation tools
  • Material component allocation

Answer : capacity Planning pay

SAP C_TADM51702 Certified Technology Associate - System Exam Set 3

Where the master data object you set the standard values ??for an operation?


Options are :

  • Production Resource / Tool (PRT)
  • work center
  • None
  • material Master
  • routing (Correct)

Answer : routing

SAP ECC, you can calculate the available standard capacity of the center of the work capacity the following information: - Start: 7:00:00 - End: 3:00:00 p.m. - Pause duration: 1 hour - Implementation rate: 80% - Overload: 110% - Number of individuals: 1 How big is the standard available capacity?


Options are :

  • 5.6 hours (Correct)
  • 8 hours
  • 7 hours
  • None
  • 6.16 hours

Answer : 5.6 hours

What features related to process orders can be filled with Good Manufacturing Practices (GMP) requirements? (Choose three)


Options are :

  • electronic batch record (Correct)
  • Availability check
  • The approved master recipes (Correct)
  • Digital signature (Correct)

Answer : electronic batch record The approved master recipes Digital signature

You want to improve the system statuses of the production order for user facilities. How do you do this?


Options are :

  • Define the position of edit your profile and determine its production scheduling profile.
  • None
  • Define the position of edit your profile and determine the order type (Correct)
  • Specifies the user's premises is the adaptation of the system table spaces.
  • Specifies the user modes depend on the type of order parameters.

Answer : Define the position of edit your profile and determine the order type

What functions can be done before releasing a production order? (Choose three)


Options are :

  • Dial routing (Correct)
  • determination of Stock
  • scheduling (Correct)
  • BOM Selection (Correct)

Answer : Dial routing scheduling BOM Selection

Which of the following functions making SAP Supply Chain Management (SCM) offer?


Options are :

  • The design of supply chains across company boundaries (Correct)
  • Communication with customers of different interaction channels
  • None
  • Product development, safety, quality and service
  • Optimization strategy with the acquisition of the supplier pool

Answer : The design of supply chains across company boundaries

SAP C_TB1200_88 Certified Associate – SAP Business One Exam Set 4

In the adaptation of the requirements of the design, the project team discovers that the options P1, P2, P3 and P4 is supplied, as standard, in addition to the MRP type PD. The amount of each of these options represents a firming type. What Firming Define? (Choose two)


Options are :

  • Handling the new requirements within the planning time fence.
  • Handling proposals for new purchases that have been created due to the new requirements within the planning time fence. (Correct)
  • None
  • Handling of existing procurement proposals outside the planning time fence.
  • Handling of existing procurement planning proposals at the fence. (Correct)

Answer : Handling proposals for new purchases that have been created due to the new requirements within the planning time fence. Handling of existing procurement planning proposals at the fence.

After the material is incorporated into the material requirements planning NETCH term change the BOM (bill of materials). Which of the following planning file entries for this material set the system?


Options are :

  • BOM explosion indicator
  • None
  • BOM explosion NETCH and NETPL planning indicators (Correct)
  • BOM explosion and the design of the detector NETPL
  • NETCH and NETPL planning indicators

Answer : BOM explosion NETCH and NETPL planning indicators

Where can configure the default storage location of the component material production order? (Choose three)


Options are :

  • The production version of the (product) (Correct)
  • routing
  • Center for Production supply area work (Correct)
  • Material master (Component) (Correct)

Answer : The production version of the (product) Center for Production supply area work Material master (Component)

When analyzing the SAP order report planned order for the finished product, one will notice that the configurations are not available in time to schedule the final configuration as the automatic forward timing. Which do you use the design to create a feasible production plan from the planning point of view of the tool?


Options are :

  • Interactive yksittäispisteytyksiä for the design of delay in assembly
  • None
  • Total design online
  • Multi-level yksittäispisteytyksiä design with "simulation mode" option (Correct)
  • Multi-level yksittäispisteytyksiä design with "display of the material list" option

Answer : Multi-level yksittäispisteytyksiä design with "simulation mode" option

What master data you need material replenishment using KANBAN procedure? (Choose two)


Options are :

  • control cycle (Correct)
  • Production supply area (Correct)
  • Rate routing
  • Product price Collector

Answer : control cycle Production supply area

What can be used to process orders with the following master data? (Choose three)


Options are :

  • serial numbers
  • Production / resource tools
  • resources (Correct)
  • master recipes (Correct)
  • production versions (Correct)

Answer : resources master recipes production versions

SAP C_THR12_66 Certified Application Associate - HCM Exam Set 4

What you need to consider regarding ATP checks which trigger the SAP customer orders?


Options are :

  • None
  • ATP amount is the amount available that can be used to confirm the incoming customer orders. (Correct)
  • If the ATP check determines is not available, it then checks the next step, whether the current acquisition or production is possible.
  • ATP check does not take into account inventory and receipts. It will check the consumption of the planned independent requirements.
  • ATP amendment establishes fixed connections to customer orders and confirmed their receipts.

Answer : ATP amount is the amount available that can be used to confirm the incoming customer orders.

Which of the following activities, which are usually triggered by KANBAN procedure later in stock sending the receipt of the goods?


Options are :

  • Set "Container transport"
  • Set "Container full" (Correct)
  • None
  • Set "Container empty"
  • Set "container in the process"

Answer : Set "Container full"

Which of the following is offered MRP areas in SAP ECC? (Choose two)


Options are :

  • MRP area may belong to different memory locations. (Correct)
  • The preset can be given different MRP areas.
  • Subcontracting supports the MRP areas. (Correct)
  • Make your subscription supports the production storage location MRP areas.

Answer : MRP area may belong to different memory locations. Subcontracting supports the MRP areas.