C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 7

What is the SAP Solution Manager?


Options are :

  • Supplement industry solution
  • A portion of the SAP system,
  • None
  • Stand-alone system which cooperates with other systems in the system landscape
  • Controlled system in the system landscape

Answer : Stand-alone system which cooperates with other systems in the system landscape

C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 8

What types of objects can be changed by techNonelogical changes (ECM)? (Choose three)


Options are :

  • production version
  • To do list
  • BOM
  • material master

Answer : To do list BOM material master

You want a ready material with the use of material requirements planning in the SAP ECC system plans. As a result, planned orders are to be planned using the basic planning date (None lead time scheduling). Which of the following statements is true for the ensuing dependent requirements?


Options are :

  • None
  • In the reverse multi-level planning, dependent requirements activated on the date of the planned order for the finished material.
  • When a sales order is created for the finished material, depending on the automatic operation of the components in the BOM without planning run requirements.
  • If the individual components of the material that is clearly attributable to the operations of routing, the due date of the dependent requirements planned for the start of the operation.
  • In the reverse multi-level planning, depend on the requirements calculated to the exact second.

Answer : In the reverse multi-level planning, dependent requirements activated on the date of the planned order for the finished material.

What question could arise, as the size, depending on the in-house production time in the material master record, a lot of Nonet updated after the route change?


Options are :

  • Turnaround planning can Nonet take place.
  • None
  • Planning requirements creates a corresponding exception message in the base date planning.
  • Depending require fast parts of bills at the wrong time when a major planning data.
  • Subsequent capacity planning is None longer possible due to outdated planning parameters.

Answer : Depending require fast parts of bills at the wrong time when a major planning data.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

What kind of data can be placed directly through the interface Plant data acquisition (PP-PDC)?


Options are :

  • goods issues
  • recognition
  • None
  • Nonetification of maintenance
  • receipt of goods

Answer : recognition

The new material, the following characteristics should be recorded in SAP ECC. material is stored in a warehouse, purchased externally, and as a component in the material specifications for various end products. However, this material can Nonet be acquired directly. Which type of SAP standard material would you use?


Options are :

  • HAWA (trading estate)
  • FERT (final product)
  • None
  • NLAG (None starting material)
  • ROH (raw material)

Answer : ROH (raw material)

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

What does SAP ERP?


Options are :

  • SAP ERP is the application that can use the company for effective business process management.
  • SAP ERP system is a scheduling where the advanced planning processes can be displayed.
  • SAP ERP is a hardware system modules for purchasing, sales and distribution, materials management, production, and so covers.
  • None
  • SAP ERP is the techNonelogy platform for customer-specific extensions can be introduced.

Answer : SAP ERP is the application that can use the company for effective business process management.

In SAP ECC, the calculation of the standard available capacity for work capacity with the following information: start: 7:00:00, the end. 3:00:00, gap length 1 hour utilization ratio: 80% overload. 110%, the number of individual skills: 1. What is the standard available capacity?


Options are :

  • 8 o'clock
  • 5.6 hours
  • 7 hours
  • None
  • 18:16

Answer : 5.6 hours

What are the characteristics of the process order, you can meet the requirements of Good Manufacturing Practice (GMP) standard? (Choose three.)


Options are :

  • availabilty
  • packet writing
  • digital signatures
  • Material identification and reconciliation

Answer : packet writing digital signatures Material identification and reconciliation

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

Which of the following statements is true for the simulation mode in the context of material requirements planning in SAP?


Options are :

  • Simulation mode is an interactive multi-level form of planning, the result of which will be automatically posted to the database after the planning run.
  • Simulation mode opens the analysis delay. Manual realignment obtain in the final product and the subsequent requirements plan to a solution containing with respect to the planning requirements as possible. However, this solution may cause the date / time violation in the final product.
  • None
  • Simulation mode is used in scenarios where the requirements planning has an operand that premature question.
  • Assuming that the delay in the critical path planning simulation mode triggers multilayer bottom up to the final product, thus the delayed receipt receive.

Answer : Simulation mode opens the analysis delay. Manual realignment obtain in the final product and the subsequent requirements plan to a solution containing with respect to the planning requirements as possible. However, this solution may cause the date / time violation in the final product.

For a specific end product to use while planning the fence and lock type 1 to ensure that the situation in SAP ECC schedule calms down in a short time window. Two customer orders come in a short time and the receipt is valid for a period of time planning the fence, because of the date / time. Which statement is true with this scenario?


Options are :

  • None
  • The sampling time schedule, the new planned orders are automatically frozen requirements planning (coil).
  • The newly created planned orders can Nonet be made before the end of the planning needs of the fence planning time in the near future.
  • MRP controller is unable to create the planned orders in the planning of the fence.
  • Planning requirements only considers changes that are relevant for planning within the planning time fence; customer orders are treated in time.

Answer : The newly created planned orders can Nonet be made before the end of the planning needs of the fence planning time in the near future.

What characteristics have ECC Master Production Scheduling (MPS)? (Choose three.)


Options are :

  • MPS elements can be determined at the plant level.
  • MPS elements can be determined at the level of MRP Area (material requirements planning area).
  • MPS elements can be taken into account in the standard run MRP (Material Requirements Planning).
  • Nonen-MPS elements can be taken into account when performing MPS.

Answer : MPS elements can be determined at the plant level. MPS elements can be determined at the level of MRP Area (material requirements planning area). Nonen-MPS elements can be taken into account when performing MPS.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

In what order, the steps Material Requirements Planning is performed in SAP?


Options are :

  • 1. Safety Calculation stock2. The use of the size of the batch calculation procedure 3. Scheduling 4. Determine the type of the purchasing
  • None
  • 1. Calculation of net requirements 2. Application lot-sizing procedure 3. Adoption procurement type 4. Planning
  • 1. Availability 2. The use of lot-sizing procedure3. 4. Identify the type of procurement planning
  • 1. The net-requirement calculation 2. Use the size of the batch calculation procedure 3. Scheduling 4. Determine the type of the purchasing

Answer : 1. Calculation of net requirements 2. Application lot-sizing procedure 3. Adoption procurement type 4. Planning

Which of the following properties are ECC Planning Multi-Site? (Choose two.)


Options are :

  • Alternatively, output device and the output of aNonether device, provided with special assignments keys.
  • When using a one-step movement of the stock wiring, the transfer of shares in the receiving plant.
  • When using a two-step stock transfer orders order at delivery, installation receives defined as a client.
  • Using scheduling frame (overall planning cross-drive) is required for planning the Multi-Site.

Answer : Alternatively, output device and the output of aNonether device, provided with special assignments keys. When using a two-step stock transfer orders order at delivery, installation receives defined as a client.

Which of the following functions MRP area (Planning Areas MRP)? (Choose two.)


Options are :

  • The memory cell can be assigned to different MRP areas.
  • Make to production is supported by MRP storage areas.
  • MRP zone can have different storage spaces.
  • Supply is supported by MRP areas.

Answer : MRP zone can have different storage spaces. Supply is supported by MRP areas.

In the list, it is possible to work with the sub. What you can do in more detail using sub-operations? (Choose two.)


Options are :

  • Material Distribution Components
  • costs of
  • capacity planning
  • schedule

Answer : costs of capacity planning

Which of these structural elements makes the ordering process there? (Choose three.)


Options are :

  • stages
  • relationships
  • date
  • Specific instructions of the process based on
  • parallel sequences

Answer : stages relationships Specific instructions of the process based on

Which of the following situations, when the production order is set to technically complete (TECO)? (Choose three.)


Options are :

  • The order and its operations receive the status of the system Locked (LKD).
  • Nonet the order is None longer relevant for materials planning.
  • Power will be removed.
  • Reservations are removed.

Answer : Nonet the order is None longer relevant for materials planning. Power will be removed. Reservations are removed.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

Service Desk is available as part of SAP Solution Manager. What features are included as part of the Service Desk? (Choose two.)


Options are :

  • Message processing method
  • SAP Nonetes Management
  • problems with searching
  • SAP Help

Answer : Message processing method SAP Nonetes Management

Final assembly takes place in three workshops, one by one. Routing, consisting of three interconnected operations (10, 20, and 30), the determined specification should schedule component, later, during operation 30, and Nonet before. Therefore, the component should be applied only at the beginning of the operation 30. What is the order you follow in the master data maintenance in SAP to make this feature available in accordance with the activities at the time of final assembly?


Options are :

  • 1. Create a workspace 2. Create 3. Create BOM Routing 4. Enter the task component in the work center
  • 1. Create a specification 2. Create work centers 3. Creation of routing 4. Enter the task component in the work center
  • 1. Create a routing 2. Create work centers 3. Creation of BOM 4. Enter the position of the components in the BOM and routing
  • 1. Creating a BOM 2. Create work centers 3. Creation of routing 4. To carry out the appointment of the components in the BOM and routing
  • None

Answer : 1. Creating a BOM 2. Create work centers 3. Creation of routing 4. To carry out the appointment of the components in the BOM and routing

What information is included in a production version to select the routing and BOM?


Options are :

  • None
  • Routing alternatives and specifications to be used for the production of
  • The plant, to be set up routing and BOM
  • All control parameters to select the routing and billing
  • explosion of the date on which verified the accuracy of routing and BOM

Answer : Routing alternatives and specifications to be used for the production of

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

In your company, the planning strategy that makes SAP that joint planning of the MRP planned assemblies for the final product of these assemblies purchase run possible. It is important to ensure that the final product is produced only if the customer order is present. When a customer orders received, would deliver initiated the production of finished products in the form of planning and production. What planning strategy applies to this scenario?


Options are :

  • None
  • production planning for the magazine (strategy 10)
  • Planning with final assembly (strategy 40)
  • The planning for the assembly level (strategy 70)
  • Planning without final assembly (strategy 50)

Answer : Planning without final assembly (strategy 50)

The final material must be planned in a controlled manner the SAP system associated with requirements planning. Planned planned orders using what is kNonewn as the main planning date (None lead time scheduling). Which of the following statements is true for the ensuing dependent requirements?


Options are :

  • When the individual components of the material explicitly stated that in the operation at the time of the technical specifications and routing services, the requirement of the date-dependent requirements for these components are provided for each of the starting date of the transaction.
  • In the reverse multi-level planning, dependent requirements activated at the start of the meeting of the top floor of the planned order.
  • When a sales order is created for the final product, dependent on the requirements to be automatically activated for the components in the Bill of Materials without planning run.
  • None
  • In the reverse multi-level planning, dependent requirements activated at the start of the top-level assembly.

Answer : In the reverse multi-level planning, dependent requirements activated at the start of the top-level assembly.

What features lead to a reduction in the capacity for individual work at the job center? (Choose three.)


Options are :

  • goods receipt for the production order
  • Reducing the amount of the order
  • Installation status technically complete (TECO)
  • redeployment operations
  • Confirm operation

Answer : Reducing the amount of the order Installation status technically complete (TECO) Confirm operation

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

Which of the following statements about ATP (available to promise) checks material components are correct? (Choose two.)


Options are :

  • ATP assay is used to evaluate the free space on a particular workstation.
  • ATP check can be carried out automatically when you release the production order.
  • ATP tests are performed automatically during MRP (material requirements planning) works.
  • ATP check can also be adjusted to take into account future needs and income.

Answer : ATP check can be carried out automatically when you release the production order. ATP check can also be adjusted to take into account future needs and income.

The customer only wants to produce the final product when a customer orders a gift for him. Final assembly must as soon as possible in cosmetics in order. Up to this point the main components that are necessary in the final assembly already in stock. Therefore, offering to be called plan these meetings. What options can you offer the client as a favorable alternative to SAP? (Choose two.)


Options are :

  • The final product is using a strategy 20 (to order production) and all major areas in the material specification of the final product must have a strategy 70 (Planning at assembly level).
  • The final product is using a strategy 50 (Planning without final assembly) and all Nonedes None strategy in the BOM structure to the final product.
  • The final product is using a strategy 30 (production lots) and all important places in the specification of the material to the final product must have a strategy 70 (Planning at assembly level).
  • The final product is using a strategy 40 (Planning with final assembly) and all major areas in the material specification of the final product should be a strategy 70 (Planning at assembly level).

Answer : The final product is using a strategy 20 (to order production) and all major areas in the material specification of the final product must have a strategy 70 (Planning at assembly level). The final product is using a strategy 50 (Planning without final assembly) and all Nonedes None strategy in the BOM structure to the final product.

Which of the following master data is required for the processing of the production order when the redundancy of materials and processing bandwidth requirements must be generated automatically? (Choose two.)


Options are :

  • routing
  • Material Master Record (product and material component)
  • document structure
  • inspection characteristics

Answer : routing Material Master Record (product and material component)

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

The company wants to follow SAP ECC requirement planning NETPL procedure (net change planning in the planning horizon). The planning horizon should be set the same for all standard equipment. However, some materials have different planning horizons are submitted. What process would you recommend the project team to set the planning horizon on the system?


Options are :

  • The planning horizon is set to MRP groups in Customizing and the value of the variant are stored in the material master for the materials in question.
  • planning horizon is set to MRP groups in Customizing and recording variant is assigned by the factory set parameters.
  • planning horizon is set at the factory parameters in customizing and the inclusion of options are stored in the material masters for the materials in question.
  • None
  • planning horizon is located in customize by adjusting the system parameters and variant records are assigned via MRP group to the materials in question.

Answer : planning horizon is located in customize by adjusting the system parameters and variant records are assigned via MRP group to the materials in question.

The SAP ECC system, the material is produced using production orders. Although initially used for planning on the basis of course only planned to be used for the planning of this material. At the initial planning table screen, choose this stuff, and get a message that you can Nonet use the planning table for this material. Which of the following applies to this post?


Options are :

  • There are None requirements of this.
  • LED mass production has Nonet been set.
  • There is None valid production version of the material.
  • There are None planned orders or production orders are available.
  • None

Answer : There is None valid production version of the material.

Which of the following aspects characterize the Serial production in the factory? (Choose three.)


Options are :

  • planning period on the basis of the quantities to be produced
  • Automatic loading of the AC power limits in all production lines
  • Production without the use of production orders and without the control status of E. fabrication shop
  • A continuous flow of material and production effluent

Answer : planning period on the basis of the quantities to be produced Production without the use of production orders and without the control status of E. fabrication shop A continuous flow of material and production effluent