C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 6

What element controls the Customizing definition of the planned costs in production orders?


Options are :

  • cost option
  • Accounting type
  • calculation procedure
  • profile calculation
  • None

Answer : cost option

C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 7

Which of the following objects, which can be activated to backwash for production orders? (Choose three)


Options are :

  • routing
  • Material Master (finished product)
  • production profile
  • Material Master (Component)
  • work center

Answer : routing Material Master (Component) work center

If the SAP system can determine the production version?


Options are :

  • In the BOM
  • routing
  • None
  • In the work center
  • The recording material

Answer : The recording material

Which of these efforts can be minimized by using kanban process?


Options are :

  • Efforts to sales and operations planning (SOP)
  • Organizational efforts for capacity planning
  • Organizational effort to produce material
  • None
  • The effort to maintain master data

Answer : Organizational effort to produce material

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

Check the availability of the process of creating the production order, using different scale test than during order release. How can you meet this requirement?


Options are :

  • None
  • Maintaining appropriate rules validation check control for order creation and order release.
  • Support the relevant rules for checking the availability of the nature of the parameters depending on the sequence.
  • Maintain the corresponding group in the material availability inputs.
  • Maintain current regulations availability in production profile.

Answer : Maintaining appropriate rules validation check control for order creation and order release.

During the design phase, the customer some philosophies regarding type of contract parameters in the article master data record in the SAP system. Which of the following types of property purchases are valid? (Choose two)


Options are :

  • Given the workpiece material can freely choose between E (mining), F (external procurement) and X (buying both types) regardless of the type of material.
  • If None commands E (extraction) corresponding external purchases is still possible, depending on the type of material.
  • Procurement Types E (in fact, the production) and F (external procurement) should be clarified with the aid of special kinds of purchasing.
  • If both types of purchases allowed an input X (the two types of purchases), demand planning includes the production in-house.

Answer : If None commands E (extraction) corresponding external purchases is still possible, depending on the type of material. If both types of purchases allowed an input X (the two types of purchases), demand planning includes the production in-house.

In Customizing for the planning requirements, the project team observes that the alternate P1, P2, P3, and P4 are also available as a standard in addition to the MRP PD type. The number in each of these alternatives is a kind of restorative. What kind of identification firming? (Choose two)


Options are :

  • Dealing with the new requirements in the planning time fence.
  • Dealing with the new proposals on public procurement, to be adopted in connection with the new requirements in the planning time fence.
  • Processing of existing proposals on purchases outside of time planning the fence.
  • Processing of existing proposals on procurement during planning time fence.

Answer : Dealing with the new proposals on public procurement, to be adopted in connection with the new requirements in the planning time fence. Processing of existing proposals on procurement during planning time fence.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

All statements regarding SAP-term plan (LTP) properly? (Choose two)


Options are :

  • In the case of external procurement, LTP creates purchase orders.
  • planning scenario must be enabled to use it in the LTP.
  • Sequencing planned point materials can be incorporated in LTP.
  • As a rule, LTP is the operational planning of major components.

Answer : planning scenario must be enabled to use it in the LTP. Sequencing planned point materials can be incorporated in LTP.

Which of the following elements can be used in the process right? (Choose three)


Options are :

  • sub-operations
  • relationships
  • stages
  • processing instructions

Answer : relationships stages processing instructions

Which of the following elements of the basic data necessary for mass production? (Choose three)


Options are :

  • Repetitive Manufacturing Profile
  • The cost price of the product collector
  • production version
  • The area of food

Answer : Repetitive Manufacturing Profile The cost price of the product collector production version

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

Which of the following statements about ATP (available to promise) checks material components are correct? (Choose two)


Options are :

  • ATP testing is used to evaluate the free space on a specific workstation
  • ATP check can also be adjusted to take into account future needs and income.
  • ATP check can be carried out automatically when you release the production order.
  • ATP tests are automatically performed during the MRP (MRP) is working.

Answer : ATP check can also be adjusted to take into account future needs and income. ATP check can be carried out automatically when you release the production order.

What are the features that you can use sub-operations? (Choose two)


Options are :

  • Production / distribution of resources, tools
  • Material Distribution Components
  • costs of
  • capacity planning

Answer : costs of capacity planning

The options series production you can use to perform the download link to SAP ECC system and therefore generate schedule starting number (RSQ) of the ordinary planned orders? (Choose three)


Options are :

  • Automatic selection of variants in production material requirements (MRP), using the settings selection methods
  • Manual distribution of the planned volumes of production planning table
  • Automatic selection of variants by applying the production records location in material requirements (MRP)
  • Suitable repetitive manufacturing profile that includes an option for automatic line selection

Answer : Automatic selection of variants in production material requirements (MRP), using the settings selection methods Manual distribution of the planned volumes of production planning table Automatic selection of variants by applying the production records location in material requirements (MRP)

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

Which of the following statements regarding ATP checks in SAP ECC, which are launched from the sales right?


Options are :

  • ATP value of the amount that can be used to confirm incoming customer orders.
  • None
  • If the ATP check determines inaccessibility. Then checked in the next step whether it is possible to buy or produce at the moment.
  • ATP check does Nonet accept stock and entering the account. It controls the consumption of planned independent requirements.
  • ATP monitoring provides a permanent connection between customer orders and fixed income.

Answer : If the ATP check determines inaccessibility. Then checked in the next step whether it is possible to buy or produce at the moment.

Which of the following basic data can be used to process orders? (Choose three)


Options are :

  • Resources
  • serial numbers
  • master Recipies
  • production versions

Answer : Resources master Recipies production versions

Which of the following statements about the fate of the procedures correctly?


Options are :

  • If production strategy make to order with only the many-to-many (exactly) the size of the lot can be used.
  • The value of the lot size can be affected by the use of the minimum lot size and a rounded profile.
  • If long-term use lot size, the purchase is carried out with a long-term perspective.
  • None
  • Number of procurement batch size can be specified with the profile of the safety period.

Answer : The value of the lot size can be affected by the use of the minimum lot size and a rounded profile.

You want to create a new material with the following properties: the material is stored in a warehouse, externally purchased and used as a component in the bill of materials for a variety of end products. The material may Nonet be sold directly. Which type of SAP standard materials do you use?


Options are :

  • NLAG (None starting material)
  • FERT (final product)
  • HAWA (trading estate)
  • None
  • ROH (raw material)

Answer : ROH (raw material)

What is supported by production orders?


Options are :

  • Automatic reading master data with PP order release
  • Automatic printing of the order of documents on the establishment of order
  • Automatic creation of transfer orders when you release order
  • Automatic selection of the work in the release order
  • None

Answer : Automatic creation of transfer orders when you release order

What are the basic data necessary for creating material for the production of orders?


Options are :

  • None
  • routings
  • production versions
  • Production tools / resources
  • Material master records

Answer : Material master records

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

When you save a job, the formula can be assigned to plans. The formulas for calculation of the parameters of the formula. What is the origin of the formula parameters used for planning? (Choose three)


Options are :

  • Common values routing operation
  • Typical values routings operations
  • Common values in the planning for the master material
  • The user-defined field in the routings

Answer : Common values routing operation Typical values routings operations The user-defined field in the routings

You want to send the data on production-related jobs as a confirmation of receipt of the goods, the issue of goods, but also other evidence of specific users of the external process control systems in SAP ECC. How can you meet this requirement?


Options are :

  • Use Application Service Interface (SAPI).
  • Use the basic interface (CIF).
  • None
  • Using the PP-PDC-interface.
  • Using the PI-PCS interface.

Answer : Using the PI-PCS interface.

Of demand / supply of the finished one customer orders and firm planned order with the same number. Availability dates for both MRP elements in the working days. Date of publication of the fixed planned order established at a later date than the one from the sales. However, a report recast exceptions happen. What would be the reason? (Choose two)


Options are :

  • the need is Nonet going.
  • Fixed planned order is beyond the horizon of debt maturities.
  • MRP are connected by a fixed pin.
  • The delta between the dates of availability defined in customizing in the tolerance window.

Answer : Fixed planned order is beyond the horizon of debt maturities. The delta between the dates of availability defined in customizing in the tolerance window.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

You choose the basic data for production orders using production versions. What information is included in the production version?


Options are :

  • The standard to use
  • None
  • Control parameters for the selection of routes and specifications
  • The date of the explosion to a routing and specification
  • Alternative routing capabilities and specifications that will be used

Answer : Alternative routing capabilities and specifications that will be used

Material is planned within SAP MRP. The planner then manually material conversion functions planned order processing order in production. MRP controller Nonew access the current stock / requirements list and the MRP list for the material and compares these two lists. Which of the following statements are true for the two lists at the moment? (Choose two)


Options are :

  • MRP List has the status of "processed".
  • MRP list shows the production sequence.
  • Statement of needs / stocks shows a production order.
  • Statement of needs / stocks is updated at the exact time it was opened.

Answer : Statement of needs / stocks shows a production order. Statement of needs / stocks is updated at the exact time it was opened.

What events led to a decrease in energy requirements for the operation? (Choose three)


Options are :

  • Confirm operation
  • Installation status technically complete (TECO)
  • Reducing the amount of the order
  • redeployment operations

Answer : Confirm operation Installation status technically complete (TECO) Reducing the amount of the order

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

Which of the following activities as part of Kanban procedure usually causes a subsequent supply of goods receipt?


Options are :

  • None
  • Set "container full"
  • Set "container empty"
  • Set "in-process container"
  • Set Container transport "

Answer : Set "container full"

Which of the following functions MRP areas in SAP? (Choose two)


Options are :

  • FIELD MRP is different warehouses.
  • Supply is supported by MRP areas.
  • To order the production is supported by the storage areas of MRP.
  • The storage areas can be assigned to different areas of MRP.

Answer : FIELD MRP is different warehouses. Supply is supported by MRP areas.

You want the system status of the production order with the user statuses.How you improve it?


Options are :

  • Determine the status parameters of a user depending on the order.
  • Profiling standing ready to assign it to a client type.
  • Profiling standing ready to assign production profile.
  • Determine the status of the user in the user table of the system statuses.
  • None

Answer : Determine the status parameters of a user depending on the order.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

Which must be carried out the following activities on the availability of capacity for automatic verification when production is released?


Options are :

  • Set the final planning indicator and assign a validation rule should be checked in the workplace for work.
  • Activate allocate the availability and the overall profile of the production profile.
  • None
  • Designate an appropriate rule to check the availability of the recording material for the product.
  • Activate check appointment availability and a common profile to control the release of the order of business functions.

Answer : Activate check appointment availability and a common profile to control the release of the order of business functions.

You use the planning time fence and close type 1. You receive a sales order with the material availability date in the fence planning. What to consider in this scenario?


Options are :

  • MRP controller can Nonet create planned orders for sampling planning time.
  • Planned orders are created within the planning time fence and automatically wait Requirements Planning
  • None
  • Planned orders shifted by planning requirements to the end of the planning time fence.
  • Planning requirements considers only changes the schedule within the planning time fence are relevant.

Answer : Planned orders shifted by planning requirements to the end of the planning time fence.