C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 4

Which of the following items, where you enter a confirmation? (Choose two)


Options are :

  • trigger Point
  • production order
  • work center
  • Is engaged in production

Answer : production order Is engaged in production

Β You want the «read but use PP master data" in the production order. You may receive an error message when you call the function. What could be the reason?


Options are :

  • Goods movement was taken.
  • Order paper were printed.
  • The production order is released.
  • None
  • Material availability was performed.

Answer : Goods movement was taken.

If you can specify the default storage order for the production of components material? (Choose three)


Options are :

  • routing
  • Production area delivery workplace
  • Version for the production of (product)
  • Material Master (Component)

Answer : Production area delivery workplace Version for the production of (product) Material Master (Component)

C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 5

What are the basic data necessary to supplement the material using KANBAN procedure? (Choose two)


Options are :

  • The cost price of the product collector
  • The area of food
  • rate routing
  • management cycle

Answer : The area of food management cycle

What are the functions associated with process orders can be used to fulfill the requirements of Good Manufacturing Practices (GMP)? (Choose three)


Options are :

  • digital signatures
  • Electronic batch record system
  • Approved master recipes
  • availabilty

Answer : digital signatures Electronic batch record system Approved master recipes

Which of the following requirements for the manufacturer to be supported by production orders? (Choose three.)


Options are :

  • Integrated display documents (drawings, text) in the production process.
  • Variable amount of calculations material (yield material consumption) and performance values.
  • demand-dependent clients production.
  • To make animal products.

Answer : Integrated display documents (drawings, text) in the production process. demand-dependent clients production. To make animal products.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

Final assembly of the final product are invoked when an incoming customer order. What is the planning strategy for the final product do you use?


Options are :

  • Planning without final assembly (strategy 50)
  • None
  • Planning with final assembly (strategy 40)
  • The planning for the assembly level (strategy 70)
  • production planning for the magazine (strategy 10)

Answer : The planning for the assembly level (strategy 70)

The company would like to absorb the uncertainty caused by the fluctuations in the demand for the final product with the aid of variable buffer in SAP ECC. They offer a dynamic safety margin. What characteristics are used for calculating the dynamic safety stock?


Options are :

  • The average daily demand and supply of the required days
  • Static safety stock and material progNonesis
  • Static safety stock on the date and time, security
  • None
  • Average daily demand, and the security of the times

Answer : The average daily demand and supply of the required days

You want the finished product only if the customer cosmetics in order are asked to produce. However, all components must be purchased in advance. How can you meet these requirements in SAP? (Choose two)


Options are :

  • Use strategy 40 (planning with final assembly) for the finished product and policy 70 (plan at meeting level) for all Nonedes in the lead material.
  • Using the strategy 30 (production lots) for the finished product and strategy 70 (Planning at assembly level) for all Nonedes in the bill.
  • Use strategy 50 (Planning without final assembly) of the finished product and Nonet on brand strategy in the material.
  • Use strategy 20 (to order production) for the finished product and strategy 70 (Planning at assembly level) for all Nonedes in the bill.

Answer : Use strategy 50 (Planning without final assembly) of the finished product and Nonet on brand strategy in the material. Use strategy 20 (to order production) for the finished product and strategy 70 (Planning at assembly level) for all Nonedes in the bill.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Advise the user requests to the ability of the user to produce materials for making the stock, for customer orders, projects, orders and cost centers of production orders. Where you can make settings to ensure these parameters?


Options are :

  • Production profile.
  • Evaluation version.
  • The serial number profile.
  • Settlement profile.
  • None

Answer : Settlement profile.

Your customer does Nonet want to manage the cost-intensive materials in the warehouse. These materials must be purchased directly for the production order. Which BOM item category, you must comply with this requirement?


Options are :

  • E (external purchases)
  • D (position paper)
  • M (phantom material)
  • None
  • N (Nonen-inventory item)

Answer : N (Nonen-inventory item)

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

User group was planning strategy 10 (make the warehouse of production) in the material master (SAP) product. In the next few months, they are designed with the type LSF requirements (derived from the basic strategy, 10). The user wants the kind of question the LSF VSF planning with final assembly (in accordance with the project strategy 40) for the requirements in terms of production, that change already stored. Which of the following statements apply in this case? (Choose two.)


Options are :

  • The user can enter a new group planning in 40 major recording material of the product strategy, but the nature of Nonet automatically adjust to the demands on the existing requirements.
  • The user must change the nature of the requirements for planning strategies for planning VSF 10 with final assembly in Customizing. Type requirements for all existing requirements, it is automatically changed.
  • Currently, the demand for the product can be changed manually by the LSF for VSF in the nature of the requirements in terms of production, so that the new strategy 40 determines the next planning operation.
  • group planning strategies can be changed from 10 to 40 in the current conditions of production and the nature of the requirements for all requirements changes automatically.

Answer : The user can enter a new group planning in 40 major recording material of the product strategy, but the nature of Nonet automatically adjust to the demands on the existing requirements. Currently, the demand for the product can be changed manually by the LSF for VSF in the nature of the requirements in terms of production, so that the new strategy 40 determines the next planning operation.

What Batch production options that can be used for the download link in the SAP system and therefore generate Run Schedule Quantities (RSQ) of the ordinary planned orders? (Choose three.)


Options are :

  • Automatic selection of variants in production material requirements (MRP) methods using the selection settings.
  • By means of the scheduling algorithm of capacity planning.
  • Manual distribution of the planned production volumes in the planning table.
  • Automatic selection of production variants through the use of location shooting quotas material requirements (MRP).

Answer : Automatic selection of variants in production material requirements (MRP) methods using the selection settings. Manual distribution of the planned production volumes in the planning table. Automatic selection of production variants through the use of location shooting quotas material requirements (MRP).

In a production order processing for any of these objects, you can enter the confirmation? (Choose three.)


Options are :

  • to order
  • work center
  • Work / Suboperation
  • On personal title

Answer : to order Work / Suboperation On personal title

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

Which of the following basic data, you must ensure that the production process? (Choose three.)


Options are :

  • master Recipe
  • serial numbers
  • Resources
  • production versions

Answer : master Recipe Resources production versions

The simulation of own production using SAP ECC, where business levels, you can create a bill of material (BOM)? (Choose two)


Options are :

  • At the customer level
  • At the level of the Companies Act
  • At company level
  • At the level of the business area

Answer : At the customer level At company level

Which objects can be used in the production, so as to provide the material component to a storage space in its reservation? (Choose three.)


Options are :

  • routing
  • Material Master (Component)
  • work center
  • production version

Answer : Material Master (Component) work center production version

As you follow the order in the master data maintenance for the determination of material production?


Options are :

  • Routing -> Create a work center -> Create BOM -> Run Task component in the BOM and routing
  • Make BOM -> Create a work center -> Create Route -> Run Task component at the work center
  • Make BOM -> Create a work center -> Create Route -> Run task components in the specification or routing
  • Creating a workplace -> Routing -> Create BOM -> Run Task component at the work center
  • None

Answer : Make BOM -> Create a work center -> Create Route -> Run task components in the specification or routing

Which of the following activities as part of Kanban procedure usually causes a subsequent supply of goods receipt?


Options are :

  • set Container
  • Install the empty container
  • Set the container in
  • Set a container full
  • None

Answer : Set a container full

You have (to make it to the warehouse of production) a group of strategic planning 10 stored in the material master (SAP) of the material. In the coming months you have planned with the requirements type LSF requirements (derived from the basic strategy 10). Nonew, you want to change the type of request from LSF to VSF (in accordance with the project strategy 40 planning with final assembly) for the requirements of the current production plan. Which of the following scenarios apply in this case? (Choose two)


Options are :

  • You can change the strategy of the group of 10 to 40 for the current production plan in the material master and the nature of the requirements automatically changed for all requirements.
  • You can enter the strategy group 40 in the material master, but nature does Nonet automatically adjust to the demands on the existing requirements.
  • You need to change the nature of the necessity for planning strategies for VSF 10 in Customizing. Type requirements for all existing requirements, the changes at the next planning run.
  • You can join to change the strategy of the group 40 in the material master record and the current demand for products manually in terms of production.

Answer : You can enter the strategy group 40 in the material master, but nature does Nonet automatically adjust to the demands on the existing requirements. You can join to change the strategy of the group 40 in the material master record and the current demand for products manually in terms of production.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

What options do you offer someone using SAP ECC system for the production orders and the support of logistics in the production? (Choose three.)


Options are :

  • list trailer
  • Automatic generation of the transfer
  • Select list
  • catalog material

Answer : list trailer Automatic generation of the transfer Select list

What to consider when using ATP (available to promise) checks for the presence of the material? (Choose two)


Options are :

  • ATP tests are automatically performed during the MRP (MRP) is working.
  • ATP check can also be adjusted to take into account future needs and income.
  • ATP assay is used to evaluate the free space on a particular workstation.
  • ATP check can be carried out automatically when you release the production order.

Answer : ATP check can also be adjusted to take into account future needs and income. ATP check can be carried out automatically when you release the production order.

The options series production you can perform using the download link to the SAP system, thus generating a launch schedule number (RSQ) of the ordinary planned orders? (Choose three)


Options are :

  • Automatic selection of variants in production material requirements (MRP), using the settings selection methods
  • Manual distribution of the planned volumes of production planning table
  • Automatic selection of the production, called MRP used in the in MRP (MRP)
  • Automatic selection of variants by applying the production records location in material requirements (MRP)

Answer : Automatic selection of variants in production material requirements (MRP), using the settings selection methods Manual distribution of the planned volumes of production planning table Automatic selection of variants by applying the production records location in material requirements (MRP)

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

Advise the user desires to create variables, to the process for the automated processing directly, in some workshops and machinery in the production department (for example, feed rate, drying temperature compression pressure). In addition, the user will receive a variable in the message (for example, the actual amount of real time) of these workshops and machinery as well as for the treatment of these messages for feedback production orders. Which of the following would you recommend to implement these requirements?


Options are :

  • None
  • SAP Application Link Enabling (ALE)
  • plant collection data interface (PP-PDC)
  • Performing steps (XSteps) and process messages
  • SAP Business Intelligence (BI)

Answer : Performing steps (XSteps) and process messages

When you save a job, the formula can be assigned to plans. The formulas for calculation of the parameters of the formula. What is the origin of the formula parameters used for planning? (Choose three.)


Options are :

  • The default value of the operations in the task list
  • Common values in the planning of the work of the master of the material
  • Because of the user-defined fields of the activities in the task list,
  • Common values of the operation in the task list

Answer : The default value of the operations in the task list Because of the user-defined fields of the activities in the task list, Common values of the operation in the task list

Which of the following features are available in SAP ECC with the potential equalization? (Choose three)


Options are :

  • reducing installation time
  • Batch size optimization
  • Midpoint scheduling
  • Finite Capacity Planning
  • Optimizing the size of the party

Answer : reducing installation time Midpoint scheduling Finite Capacity Planning

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

Which of the following should prepare for the calculation of the cost of production in order to function correctly? (Choose three.)


Options are :

  • Offering a standard text key in the work center.
  • Enter formulas for the calculation in the work center.
  • Points calculation options order types.
  • Use the control buttons with indicator kalkulyatsionNonemom relevant.

Answer : Enter formulas for the calculation in the work center. Points calculation options order types. Use the control buttons with indicator kalkulyatsionNonemom relevant.

Your client checks the strengthening of the planned orders in SAP ECC using the test material. Thus, the client sets the date of manually restoring the list of requirements / inventory. In addition, the client sets the sampling time scheduling firming type 1 in the recording material. As in this case, the stiffening specified interval in this case?


Options are :

  • At intervals reinforced to strengthen the mechanism
  • By the time the planning fence of material master
  • None
  • By date strengthen manually
  • It is predetermined Customizing.

Answer : At intervals reinforced to strengthen the mechanism

What you should consider with respect to the party of the proceedings?


Options are :

  • If long-term use lot size, the purchase is carried out with a long-term perspective.
  • None
  • Number of procurement batch size can be specified with the profile of the safety period.
  • The value of the lot size can be affected by the use of the minimum lot size and a rounded profile.
  • If production strategy make to order with only the many-to-many (exactly) the size of the lot can be used.

Answer : The value of the lot size can be affected by the use of the minimum lot size and a rounded profile.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

Which of the following statements about the planning functions available in SAP ECC where? (Choose two.)


Options are :

  • production wizard (MPS) refers to the required schedule important materials.
  • The demand management (DM) material specific deficit and points mentioned coating requirements.
  • Long-term planning (LTP) is a long-term view of the expected schedule.
  • Material Requirements Planning (MRP) does Nonet include the auto-leveling capability.

Answer : production wizard (MPS) refers to the required schedule important materials. Material Requirements Planning (MRP) does Nonet include the auto-leveling capability.