C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 1

What events led to a decrease in energy requirements for the operation? (Choose three)


Options are :

  • Reducing the amount of the order
  • Confirm operation
  • Installation status technically complete (TECO)
  • goods receipt for the production order
  • redeployment operations

Answer : Reducing the amount of the order Confirm operation Installation status technically complete (TECO)

C_TSCM42_66 SAP Certified Associate Production Planning Exam Set 2

What are the features that you can use sub operations? (Choose two)


Options are :

  • capacity planning
  • Material Distribution Components
  • costs of
  • Production / distribution of resources, tools

Answer : capacity planning costs of

If the SAP system can determine the production version?


Options are :

  • The recording material
  • In the work center
  • None
  • In the BOM
  • routing

Answer : The recording material

What are the characteristics of serial production? (Choose three)


Options are :

  • Production without the use of production orders and without the control status
  • planning period on the basis of the quantities to be produced
  • Automatic loading of the line based on capacity constraints in all production
  • prefabrication
  • A continuous flow of material and production effluent

Answer : Production without the use of production orders and without the control status planning period on the basis of the quantities to be produced A continuous flow of material and production effluent

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 1

In a master data object, the default values ??for the operation?


Options are :

  • None
  • material Master
  • work center
  • Manufacturing Resource / Tool (PRT)
  • routing

Answer : routing

You want to use different options for planning in SAP ECC. What is the correct order of the planning procedures?


Options are :

  • Material Requirements Planning -> Demand Management -> Sales and Operation Planning -> Long-Term Planning -> Capacity Planning
  • Long-term planning -> Sales and Operations Planning -> Demand Management -> Material Requirements Planning -> Capacity Planning
  • None
  • Sales and operations planning -> Control -> Demand Long Term Planning -> Material Requirements Planning -> Capacity Planning
  • Demand Management -> Sales and Operations Planning -> Planning Resource -> Long Term Planning -> Material Requirements Planning

Answer : Sales and operations planning -> Control -> Demand Long Term Planning -> Material Requirements Planning -> Capacity Planning

What you should consider monitoring ATP in SAP ECC, ranging from customer orders?


Options are :

  • ATP monitoring provides a permanent connection between customer orders and fixed income.
  • ATP value of the amount that can be used to confirm incoming customer orders.
  • If the ATP check determines that there is Nonet, then check the next step it is possible to timely procurement or production.
  • ATP check does Nonet accept stock and entering the account. It controls the consumption of planned independent requirements.
  • None

Answer : ATP value of the amount that can be used to confirm incoming customer orders.

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 2

Once the material is contained in the material requirements planning to launch Netch change the specification (bill of materials). Which of the following data files of the planning for this material system is installed?


Options are :

  • None
  • Indicator BOM explosion
  • Indicators Netch and NETPL planning
  • BOM explosion and scheduling indicator NETPL
  • BOM explosion, Netch and planning indicators NETPL

Answer : BOM explosion, Netch and planning indicators NETPL

What activities can cause an automatic availability for the production order components?


Options are :

  • Order release
  • material staging
  • Order rescheduling
  • Receipt of the missing part
  • None

Answer : Order release

Perhaps a routing which includes five operations in the first sequence (10, 20, 30, 40, 50) to create. In case of problems, you want to use a second set of other jobs for operations 30 and 40. What is the order of the categories you use to create a second set in the system?


Options are :

  • The default order
  • None
  • alternate sequence
  • parallel
  • Finishing off relationship

Answer : alternate sequence

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 3

What may be the result of confirming the operation?


Options are :

  • The planned costs are updated
  • adjusted capacity requirements
  • Production is delayed
  • The actual cost is calculated
  • None

Answer : adjusted capacity requirements

The fact that you can use to organize the material staging for production orders? (Choose three)


Options are :

  • transmission of orders
  • material documents
  • kanban
  • list trailer

Answer : transmission of orders kanban list trailer

In the analysis of the SAP order report for a planned order for the finished product, you will Nonetice that one of the Nonedes will Nonet be available in time for the planned final assembly due to the automatic planning for the future. Which planning procedures you use to create a long-term workable plan for production planning requirements?


Options are :

  • Total online scheduling
  • Interactive planning a trip to the delayed assembly
  • Multi-level planning one question with the "A list of materials"
  • None
  • Multi-level planning one question with the "Simulation Mode"

Answer : Multi-level planning one question with the "Simulation Mode"

C_BODI_20 SAP Business Objects Data Integrator XI R2 Test Set 4

If you can specify the default storage order for the production of components material? (Choose three)


Options are :

  • routing
  • Production area delivery workplace
  • Version for the production of (product)
  • Material Master (Component)

Answer : Production area delivery workplace Version for the production of (product) Material Master (Component)

What question could arise, as the size, depending on the in-house production time in the material master record, a lot of Nonet updated after the route change?


Options are :

  • Planning requirements creates a corresponding exception message in the base date planning.
  • Subsequent capacity planning is None longer possible due to outdated planning parameters.
  • Turnaround planning can Nonet take place.
  • None
  • Depending require fast parts of bills at the wrong time when a major planning data.

Answer : Depending require fast parts of bills at the wrong time when a major planning data.

SAP ECC calculating the standard power capacity available for the work center with the following information: - Origin: 7:00:00 - End: 03:00:00 - Break time: 1 hour - Level of 80% - overload: 110% - Number of unique capabilities: 1. What is the standard available capacity?


Options are :

  • 8 o'clock
  • 18:16
  • 7 hours
  • 5.6 hours
  • None

Answer : 5.6 hours

Which of the following objects, which can be activated to backwash for production orders? (Choose three)


Options are :

  • routing
  • Material Master (finished product)
  • Material Master (Component)
  • work center

Answer : routing Material Master (Component) work center

Which of the following production masters ECC (MPS)? (Choose three)


Options are :

  • MPS elements can be determined at the plant level.
  • Planning MOBA and Nonen-MPS is always carried out in one run planning.
  • MPS elements can be determined at the level of MRP area.
  • MPS planned items in the standard run MRP.
  • Nonen-MPS elements can be taken into account when performing MPS.

Answer : MPS elements can be determined at the plant level. MPS elements can be determined at the level of MRP area. Nonen-MPS elements can be taken into account when performing MPS.

What property is used for consumption with the planning strategy 40 (Planning with final assembly)?


Options are :

  • Consumption may originally planned to increase the total number of products.
  • Consumed with planning material.
  • None
  • Consumption creates static binding agreement between planned independent requirements and customer requirements for the entire procurement process.
  • The consumption can reduce the total number originally planned products.

Answer : Consumption may originally planned to increase the total number of products.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 1

You want to use the function Read PP master data "in the production order. However, you may receive an error message when you call the function. What could be the reason?


Options are :

  • Goods movement was taken.
  • Order paper were printed.
  • Material availability was performed.
  • None
  • The production order is released.

Answer : Goods movement was taken.

You want to create a new material - stored in Shtoko- procured- apparently used as a component in the bill of materials for a variety of final products- may Nonet be sold directly to a standard, such as SAP What material do you use?


Options are :

  • HAWA (trading estate)
  • None
  • ROH (raw material)
  • NLAG (None starting material)
  • FERT (final product)

Answer : ROH (raw material)

Which of the following features are planning on multiple sites in SAP?


Options are :

  • The use of "planning framework" is always a must for planning multiple sites.
  • When using a one-step movement of the stock wiring, the transfer of shares in the receiving plant
  • None
  • Multi-site planning can be activated using the appropriate planning strategies.
  • Both ends of an alternative solid stock a transfer from aNonether device is determined in accordance with special keys purchasing.

Answer : Both ends of an alternative solid stock a transfer from aNonether device is determined in accordance with special keys purchasing.

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 2

Which of the following best defines the SAP ERP?


Options are :

  • SAP ERP is the application that can use the company to effectively manage business processes.
  • SAP ERP includes a hardware system components such as procurement, sales and distribution, inventory and production.
  • None
  • SAP ERP is an application that supports all processes in direct contact with the customer throughout the lifecycle CRM.
  • SAP ERP is a system of advanced planning and optimization processes display.

Answer : SAP ERP is the application that can use the company to effectively manage business processes.

What is the SAP Solution Manager?


Options are :

  • The transaction SAP ECC
  • None
  • AutoNonemous system which cooperates with other systems in the system landscape
  • Controlled system in the system landscape
  • Supplement industry solution

Answer : AutoNonemous system which cooperates with other systems in the system landscape

Which of the following elements of the basic data necessary for mass production? (Choose three)


Options are :

  • Repetitive Manufacturing Profile
  • The area of food
  • The cost price of the product collector
  • production version

Answer : Repetitive Manufacturing Profile The cost price of the product collector production version

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 3

Final assembly of the final product are invoked when an incoming customer order. What is the planning strategy for the final product do you use?


Options are :

  • production planning for the magazine (strategy 10)
  • Planning with final assembly (strategy 40)
  • Planning without final assembly (strategy 50)
  • None
  • The planning for the assembly level (strategy 70)

Answer : Planning without final assembly (strategy 50)

What types of objects can be changed by techNonelogical changes (ECM)? (Choose three)


Options are :

  • BOM
  • To do list
  • production version
  • material master
  • work center

Answer : BOM To do list material master

What are the basic data necessary to supplement the material using KANBAN procedure? (Choose two)


Options are :

  • management cycle
  • The area of food
  • The cost price of the product collector
  • rate routing

Answer : management cycle The area of food

C_BODI_20 SAP Certified Application Associate SAP BO Test Set 4

During the design phase, the customer some philosophies regarding type of contract parameters in the article master data record in the SAP system. Which of the following types of property purchases are valid? (Choose two)


Options are :

  • If None commands E (extraction) corresponding external purchases is still possible, depending on the type of material.
  • If both types of purchases allowed an input X (the two types of purchases), demand planning includes the production in-house.
  • Purchasing Types E (extraction), F (external purchases) or X (both type of commands) can be selected for the material is dependent on the type of material.
  • Procurement Types E (actually producing) and F (external procurement) must be coordinated with the help of special kinds of procurement.

Answer : If None commands E (extraction) corresponding external purchases is still possible, depending on the type of material. If both types of purchases allowed an input X (the two types of purchases), demand planning includes the production in-house.

Which of the following types of planning can be used for capacity planning?


Options are :

  • center
  • forward
  • Only the required bandwidth
  • None
  • ago

Answer : center