C_BOE_30 SAP BO Enterprise Certified Application Associate Set 5

Martina belongs to the Finance and Accounting groups. The Finance group has been granted viewon demand access to the Accounting folder; the Accounting group has been granted Scheduleaccess to the Accounting folder. Within the Accounting folder is a Financial Analysis subfolderwhere the Finance group has inherited rights, where the Accounting group has advanced rightsand Schedule the document to run has been explicitly denied. The Everyone group has beengranted No Access at the Global level. If you check user rights for a report object in the FinancialAnalysis subfolder, what level of rights does Martina have for the object?


Options are :

  • The equivalent of View on Demand Access, explicitly granted
  • The equivalent of Schedule Access, explicitly granted
  • The equivalent of Schedule inherited, with Schedule the document to run explicitly denied
  • The equivalent of View on Demand inherited, with Schedule the document to run explicitly denied (Correct)

Answer : The equivalent of View on Demand inherited, with Schedule the document to run explicitly denied

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 2

Which two benefits does a system auditing plan provide your Business Objects Enterprisesystem? (Choose two.)A. Individual business units can be provided with custom reports.B. System audit reporting can provide analysis of use patterns.C. Users can determine when and why a server is offline.D. Administrators can remove unused report objects from the system.


Options are :

  • B,A
  • A,D
  • B,D (Correct)
  • B,C

Answer : B,D

Which two factors should you consider when designing the scalability of a Business ObjectsEnterprise installation? (Choose two.)A. Hard drive speedB. ODBC driver configurationC. Scheduled report processing capacityD. Overall system capacity to process user requests


Options are :

  • C,B
  • C,A
  • C,D (Correct)
  • B,D

Answer : C,D

Which of the following is the threshold that determines the number of required Crystal ReportsCache Servers?


Options are :

  • Simultaneous processing threads (Correct)
  • Concurrent active users
  • Total number of projected Crystal Reports instances multiplied by the average file size
  • One Crystal Reports Cache Server can support up to four Crystal Reports Page Servers

Answer : Simultaneous processing threads

SAP C_THR12_66 Certified Application Associate - HCM Exam Set 4

Which statement describes the recommended way to assign rights when planning your contentmanagement system?


Options are :

  • Assign security to users for each object
  • Assign security to groups for each category
  • Explicitly deny rights to the Everyone group at the Global level
  • Use the pre-defined access levels whenever possible (Correct)

Answer : Use the pre-defined access levels whenever possible

Which three factors should you consider when you configure a Business Objects Enterprisesystem? (Choose three.)A. Network topologyB. Geographic location of usersC. Page size of the system databaseD. Authentication method


Options are :

  • A,B,D (Correct)
  • A,B,C
  • C,B,D
  • A,C,D

Answer : A,B,D

Which two strategies can you employ to maximize your Business Objects Enterprise system’scapacity to process on-demand report viewing requests? (Choose two.)A. Verify the efficiency of your report objects.B. Install all job servers on a machine located close to the production database server machine.C. Distribute the processing load through multiple server groups, each including one or moreCrystal Reports Job Servers.D. Increase the number of Crystal Reports Page Server services that serve requests from theCrystal Reports Cache Server.


Options are :

  • C,D
  • A,C
  • A,B
  • A,D (Correct)

Answer : A,D

SAP C_TBIT44_71 Development Consultant Net Weaver Exam Set 3

For the Web Intelligence Report Server, what is the recommended service threshold for the“Maximum Simultaneous Connections” per CPU?


Options are :

  • 15 per CPU
  • 25 per CPU (Correct)
  • 10 per CPU
  • 5 per CPU

Answer : 25 per CPU

Within your Business Objects Enterprise system is a Marketing group whose members haveaccess to schedule reports in the Marketing folder and its subfolders. As part of your instancemanagement plan, you want to limit members of the Marketing group to 10 saved instances ofThese reports. What is the most efficient method of meeting this requirement?


Options are :

  • Set the Instance Limit for the Marketing group to 10 for the Marketing folder and for each of the subfolders.
  • Set the Instance Limit for the Marketing group to 10.
  • Set the Instance Limit for the Marketing group to 10 for each of the objects in the Marketing folder and all of its subfolders.
  • Set the Instance Limit for the Marketing group to 10 for the Marketing folder. (Correct)

Answer : Set the Instance Limit for the Marketing group to 10 for the Marketing folder.

Which three factors may determine how the Business Objects Enterprise system is configured?(Choose three.)A. Location of the production databases(s)B. Required level of system availabilityC. Hardware configurationsD. Number of licensed Windows seats


Options are :

  • D,B,C
  • A,D,C
  • A,B,D
  • A,B,C (Correct)

Answer : A,B,C

SAP C_TADM51_731 Certified Technology Associate System Exam Set 4

Which three statements describe a way to increase the on-demand viewing capacity of yourcompany’s Business Objects Enterprise system? (Choose three.)A. Increase the number of available Crystal Reports Page Servers.B. Optimize record selection formulas.C. Place Crystal Reports Page Server close to the production database.D. Bind each Crystal Reports Page Server to a specific Crystal Reports Cache Server.


Options are :

  • D,B,C
  • A,B,D
  • A,B,C (Correct)
  • A,D,C

Answer : A,B,C

Which two strategies can you employ to maximize your Business Objects Enterprise system’scapacity to process scheduled report instances? (Choose two)A. Verify the efficiency of your report objects.B. Install all job servers on a machine located close to the production database server machine.C. Distribute the processing load through multiple server groups, each including one or moreCrystal Reports Page Servers.D. Increase the number of Crystal Reports Page Server services that serve requests from theCrystal Reports Cache Server.


Options are :

  • A,B (Correct)
  • D,B
  • A,D
  • A,C

Answer : A,B

Which step would not be a part of developing a content management plan for the BusinessObjects Enterprise system?


Options are :

  • Setting group and user access levels on the folders and objects
  • Setting up folder structures to organize the content
  • Determining the disk requirements for the Output File Repository Server (Correct)
  • Setting instance limits on the folders and objects

Answer : Determining the disk requirements for the Output File Repository Server

SAP C_THR12_66 Certified Associate - Human Capital Exam Set 3

Users attempting to log on to InfoView receive the “Account Information Not Recognized….” errormessage. When you attempt to log into the Central Management Console (CMC), you receive the“Unable to connect to cluster….” error message. Which server should you examine to troubleshootthis problem?


Options are :

  • The Central Management Server (Correct)
  • The Web Server (Internet Information Server)
  • The production database server
  • The Web Application Server

Answer : The Central Management Server

The Extreme Mountain Bikes Inc. Sales Department has two regions: Eastern and Western. Youwant to limit View Access for each region’s reports to members of the appropriate regional salesgroup only. You create the following folders and groups in the company’s Business ObjectsEnterprise system: Sales Top Level folder Sales Eastern Region subfolderSales Western Regionsubfolder Sales group Sales Eastern subgroupSales Western subgroup. Which three securitychanges should be made to achieve the access requirements? (Choose three.)A. Grant the Everyone group No Access at the Global levelB. Grant the Sales group View access to the Sales Top Level folderC. Grant the Sales group Full Control to the Sales Top Level folderD. Grant the Sales Eastern subgroup View access to the Sales Eastern Region subfolder


Options are :

  • A,B,D (Correct)
  • A,B,C
  • C,B,D
  • A,C,D

Answer : A,B,D

Which server must you configure to connect to the auditing database in order to provide auditinginformation for your Business Objects Enterprise system?


Options are :

  • Central Management Server (Correct)
  • Program Job Server
  • Crystal Reports Page Server
  • Crystal Reports Cache Server

Answer : Central Management Server

SAP C_TSCM66_66 Certified Associate Logistics Execution Exam Set 3

Which two advantages will you achieve by scaling a Business Objects Enterprise installation?(Choose two.)SAP C_BOE_30 Exam"Pass Any Exam. Any Time." - www.actualtests.com 70A. Optimized overall network bandwidthB. Increased scheduled reporting capacityC. Optimized production database performanceD. Increased on-demand viewing capacity


Options are :

  • B,D (Correct)
  • A,D
  • B,A
  • B,C

Answer : B,D

Which of the following describes Central Management Server (CMS) clustering? (Choose two.)A. Two or more Central Management Server machines function as a single Central ManagementServer.B. In the event of a failure, the workload of the failed Central Management Server is picked up byanother available Central Management Server within the cluster.C. The Business Objects Enterprise system can have multiple Central Management Servers. Onewill be the active Central Management Server and the others will become active in the event of afailure.D. Two or more Central Management Servers will handle all requests and distribute the loadbased on the load balancing algorithm specified by the administrator using the command lineoption balance.


Options are :

  • A,C
  • A,B (Correct)
  • A,D
  • D,B

Answer : A,B

You create a report containing a parameter named Countries that enables the person viewing thereport to select one or more countries to be displayed in the report. The report works properlywhen you view it on your machine using Crystal Reports. You publish the report to BusinessObjects Enterprise using the Central Management Console (CMC). When you view the report ondemand in InfoView, you are not prompted for a country value and the report displays only recordsfor customers located in England. Which scenario describes the cause of this issue?


Options are :

  • A cached version of the report is being served by the Crystal Reports Cache Server.
  • You hard coded England in the record selection formula.
  • The Country parameter has default value of England in the Central Management Console. (Correct)
  • There is a List of Values cache on the Report Application Server that must be flushed before the parameter will appear.

Answer : The Country parameter has default value of England in the Central Management Console.

SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 6

You want your company’s Business Objects Enterprise system to support interactive viewing andqueries to relational or OLAP data sources for many users. Which three configuration changes canyou make to meet your goal? (Choose three.)A. Increase the number of Crystal Reports Page Servers and Crystal Reports Cache Servers.B. Increase the number of Web Application Servers and Web Component Adapters properlyconfigured to handle OLAP Intelligence reports.C. Increase the number of Web Intelligence Report Servers to handle Web Intelligence requests.D. Make the reports as efficient as possible, including maximizing the efficiency of any universesthat might be used in Web Intelligence documents.


Options are :

  • B,A,D
  • B,C,A
  • B,C,D (Correct)
  • A,C,D

Answer : B,C,D

You are responsible for implementing a Business Objects Enterprise system for a client. The clientrequires that you develop a comprehensive content management plan for their Business ObjectsEnterprise system. Which step must you complete before you develop your content managementplan?


Options are :

  • Implement the system.
  • Test your system.
  • Conduct discussions with all the stakeholders (Correct)
  • Define all system requirements.

Answer : Conduct discussions with all the stakeholders

All of your Business Objects Enterprise services are installed on separate machines. You are ableto login to the Business Objects Enterprise system, browse through the contents of the folders andview OLAP Intelligence and Crystal Reports on demand using either the Crystal ReportsAdvanced DHTML viewer or the Active X viewer. You are not able to schedule Crystal Reports.Which Business Objects Enterprise server component is most likely the cause?


Options are :

  • Crystal Reports Cache Server
  • Input File Repository Server
  • Output File Repository Server
  • Crystal Reports Job Server (Correct)

Answer : Crystal Reports Job Server

SAP P_HCMTM_64 Certified Professional - HCM Talent Mngt Exam Set 2

Which three statements are true about the degree of availability of a single-server BusinessObjects Enterprise system? (Choose three.)A. Regular backups of the Central Management Server (CMS) system database and the FileRepository Server (FRS) files are essential.B. If one service fails, it can be taken over by a duplicate service on the same server.C. If the active Enterprise service fails, downtime will depend on how quickly another servermachine can be built.D. If the active Enterprise service fails, downtime will be minimal because a backup service onanother machine takes over.


Options are :

  • A,D,C
  • A,B,D
  • D,B,C
  • A,B,C (Correct)

Answer : A,B,C

Which of the following may be a factor in determining the degree of availability of the BusinessObjects Enterprise system?


Options are :

  • The number of servers available (Correct)
  • Life cycle management
  • The number of named user licenses
  • Dynamic recovery planning

Answer : The number of servers available

You regularly back up the system data for your company’s Business Objects Enterprise system.The computer holding the Central Management Server (CMS) system database has just failed.What action must you take to use the backup copy of the Business Objects Enterprise systemdata?


Options are :

  • Verify network connectivity between the backup database and production database servers
  • Select the “Failover database” option on the Central Management Server (CMS) properties
  • Change the Central Management Server (CMS) Data Source to point to the backup copy of the Business Objects Enterprise database. (Correct)
  • Change the System DSN to point to the backup copy of the Business Objects Enterprise database.

Answer : Change the Central Management Server (CMS) Data Source to point to the backup copy of the Business Objects Enterprise database.

SAP C_HANATEC_1 Certified Technology Associate Practice Exam Set 5

Which three Business Objects Enterprise components should you backup as part of your disasterrecovery plan? (Choose three.)A. The Business Objects Enterprise program executableB. Command line parameters for Business Objects Enterprise serviceC. The contents of the Input and Output File Repository ServersD. The Central Management Server system database


Options are :

  • A,C,D
  • B,A,D
  • B,C,A
  • B,C,D (Correct)

Answer : B,C,D

Your Business Objects Enterprise system users are concerned they are receiving inaccurateresults when viewing Web Intelligence documents. Which two factors could contribute toinaccurate data? (Choose two.)A. Improperly configured Business ViewsB. Incorrect SQuestionL statementsC. Improperly configured Universe connectionsD. Incorrect references to the Web Intelligence job server


Options are :

  • B,D
  • D,C
  • B,C (Correct)
  • B,A

Answer : B,C

Your Business Objects Enterprise system is running on a Windows platform. Users complain thatthey are having problems processing and viewing Crystal Reports. Which two actions should youtake to check the state of the database connectivity? (Choose two.)A. Open the affected report objects on the report designer’s machine and attempt to refresh themagainst the corporate database.B. Check network connectivity between user machines and the database server.C. Connect to the Business Objects Enterprise system using the company’s intranet, and attemptto view and schedule the affected report objects.D. Open the affected report objects from Crystal Reports on the server machine and attempt torefresh them against the corporate database.


Options are :

  • B,D
  • C,A
  • C,B
  • C,D (Correct)

Answer : C,D

SAP C_TSCM42_66 Certified Associate Production Planning Exam Set 2

Which two benefits does an instance management plan provide for your Business ObjectsEnterprise system? (Choose two.)A. Reduced storage space requirements for the Input File Repository ServerB. Reduced storage space requirements for the Output File Repository ServerC. Faster system backupsD. Faster retrieval of a desired instance of a report


Options are :

  • B,C (Correct)
  • B,A
  • A,C
  • B,D

Answer : B,C

You plan to use an 8-CPU computer as a dedicated Crystal Reports Job Server in your BusinessObjects Enterprise system. What is the recommended way to set up this machine?


Options are :

  • Configure four Crystal Reports Job Server services, each set to handle 20 simultaneous jobs.
  • Configure eight Crystal Reports Job Server services, each set to handle 10 simultaneous jobs
  • Configure one Crystal Reports Job Server service, set to handle 40 simultaneous jobs.
  • Configure two Crystal Reports Job Server services, each set to handle 20 simultaneous jobs. (Correct)

Answer : Configure two Crystal Reports Job Server services, each set to handle 20 simultaneous jobs.