Business needs, assumptions and limitations and understanding the needs of customers and the high-level requirements are documented:


Options are :

  • None
  • The project plan.
  • The project management plan.
  • Stakeholder Register.
  • Work breakdown structure.

Answer : The project plan.

Once the project is committed to reducing defects in the product or service, the aim of the project is to create a / an:


Options are :

  • None
  • portfolio
  • result
  • program
  • improvement

Answer : improvement

The tool or technique used in the Control Procurements the process is:


Options are :

  • Provide Valle conferences.
  • None
  • booking analysis
  • Performance reporting.
  • Expert assessment.

Answer : Performance reporting.

What tool or technique used in Control Procurement process can be carried out during the execution of verifying compliance with the project deliverables?


Options are :

  • the procurement documents
  • None
  • Review budget
  • risk register
  • Audit and Inspection

Answer : Audit and Inspection

PMI PGMP Program Management Professional Practice Exam Set 1

Withdrawn from an actual or potential conflict or suspends its better prepared to be resolved or the other which describes five general techniques for managing conflict?


Options are :

  • Smooth / accommodate
  • Force / straight
  • None
  • Cancel / avoided
  • Compromise / reconcile

Answer : Cancel / avoided

Project management, temporary project can be:


Options are :

  • None
  • Completed without planning
  • The process of producing goods
  • The routine business processes
  • Long lasting

Answer : Long lasting

Configuration identification, configuration status accounting procedures, and configuration and internal audit are all functions where the process?


Options are :

  • To monitor and control project work
  • Perform quality assurance
  • None
  • Direct and manage project work
  • Perform Integrated Change Control

Answer : Perform Integrated Change Control

The component is human resource management, including the ways in which team members can get the certificates that support their ability to benefit from the project known as:


Options are :

  • training needs
  • None
  • staff acquisition
  • recognition and awards
  • compliance

Answer : training needs

Stakeholders should be managed as a key project:


Options are :

  • initiative
  • Process
  • Target
  • None
  • benefit

Answer : Target

Capacities of project management, such as motivational to encourage; listens actively; to persuade the team to perform an operation; and a summary, by coating, and identifying steps are known as:


Options are :

  • hard skills
  • technical skills
  • None
  • communication skills
  • organizational skills

Answer : communication skills

PMI-RMP PMI Risk Management Professional Practice Test Set 2

Project deliverables that have been completed and checked for faults in the Quality Control process is called:


Options are :

  • Verified deliverables.
  • None
  • Validated deliverables.
  • Accreditation criteria.
  • Activity resource requirements

Answer : Verified deliverables.

What process involves dividing the project deliverables and project work into smaller, more manageable parts?


Options are :

  • None
  • Develop a schedule
  • define scope
  • Create VVBS
  • Estimate Activity Resource

Answer : Create VVBS

Which type of project management office (PMO) to supply templates, best practices and training for project teams?


Options are :

  • control of
  • sturdy
  • instructive
  • Directive
  • None

Answer : sturdy

What tool or technique is used to Perform Integrated Change Control process?


Options are :

  • modeling techniques
  • decomposition
  • None
  • resource optimization
  • meetings

Answer : meetings

Every cost associated anomalies?


Options are :

  • training
  • Equipment
  • inspections
  • Liabilities
  • None

Answer : Liabilities

An example of the decision-making technique is the group:


Options are :

  • multi-criteria decision analysis
  • None
  • The nominal group technique
  • the affinity diagram
  • most

Answer : most

PMI-002 Certified Associate Project Management Practice Exam Set 12

Output has been approved version of the time-phased project budget?


Options are :

  • trend Analysis
  • None
  • cost baseline
  • resource calendar
  • The extent of baseline

Answer : cost baseline

The process of tracking project status and definition of the product as well as manage changes in the scope of the basic level are known:


Options are :

  • Define the extent of it.
  • Scope Management Plan.
  • Confirm the extent of it.
  • The extent of control.
  • None

Answer : The extent of control.

The project, a total of float measure:


Options are :

  • Estimate of total resources needed after the completion of the project forward pass.
  • Costs expended to restore order after a crash project schedule schedule
  • None
  • Time for action may be extended or delayed without changing the end of the project.
  • The ability to mix to schedule activities to reduce the duration of the project.

Answer : Time for action may be extended or delayed without changing the end of the project.

Determine which operating output expanded description of the activity by identifying the multiple components associated with each function?


Options are :

  • project calendars
  • activity list
  • None
  • PROJECT DOCUMENT Updates
  • activity is determined

Answer : activity is determined

Output Project cost management includes quantitative estimates meet the likely cost of the project work?


Options are :

  • The activity cost estimates
  • Earned Value Management
  • cost management plan
  • None
  • cost baseline

Answer : The activity cost estimates

through which project managers do not take the job?


Options are :

  • None
  • Members and consultants of the project
  • Of consultants and stakeholders
  • Stakeholders and functional leaders
  • members and stakeholders of the project

Answer : members and stakeholders of the project

PMI-RMP PMI Risk Management Professional Practice Test Set 6

The logical relationship in which the follower can begin before the predecessor action has been completed is known:


Options are :

  • None
  • End-start (FS).
  • End finish (FF).
  • Start finish (SF).
  • Start-start (SS).

Answer : End-start (FS).

Starting the Process Group processes can be carried out at the organizational level and to be out of the project:


Options are :

  • Communication channels.
  • Scope.
  • The strategic orientation.
  • the level of control.
  • None

Answer : the level of control.

Identify risks is part of that process group?


Options are :

  • showing
  • Design
  • commencement of
  • None
  • Closure

Answer : Design

Specification and deliverables and processes is the focus:


Options are :

  • question of control
  • change management
  • monitoring and control of projects
  • configuration management
  • None

Answer : configuration management

Zero duration of the milestones in the project planning occurs because the milestones:


Options are :

  • Represent both significant and insignificant steps in the project and are difficult to predict.
  • Represent the time, as a major project point or event.
  • Occur at random times in the project plans.
  • None
  • Are unpredictable and challenge the Plan Schedule Management process.

Answer : Represent the time, as a major project point or event.

What tool or technique is used to estimate the cost of the process?


Options are :

  • divination
  • Editor's offer analysis
  • Acquisition
  • None
  • Earned Value Management

Answer : Editor's offer analysis

PMP® Certification v6: 2 PMP Exams& Detailed PMP Math_14pdus Set 8

What is your estimate completion (EAC) where the budget for the completion (BAC) is $ 100 for the actual cost (AC) is $ 50, and earned value (EV) is $ 25?


Options are :

  • None
  • $100
  • $175
  • $125
  • $50

Answer : $125

Every quality tool may prove useful in understanding the quality and cost of the process?


Options are :

  • Checksheets
  • control Cards
  • histograms
  • flow charts
  • None

Answer : flow charts