PMI-002 Certify Associate Project Management Practice Exam Set 4

Which of the following statements are false information about Rolling Wave plan?


Options are :

  • None
  • Rolling Wave Planning is the cost and schedule used in the design of technology Define Activities process.
  • Rolling wave planning is the process of decomposing under each work package WBS corresponding scheduled activity is required to produce work package performance.
  • Rolling Wave Planning is an iterative phased approach to project development.
  • Rolling Wave Design illustrates one form of the preparation of a progressive design in which the work can be carried out near term low WBS outlined in detail in the work far in the future are planned WBS components that are relatively high at the WBS.

Answer : Rolling wave planning is the process of decomposing under each work package WBS corresponding scheduled activity is required to produce work package performance.

The project is considered successful when the _______________.


Options are :