PMI-002 Certified Associate Project Management Practice Exam Set 14

When is the project manager assigned to the project?


Options are :

  • Already the project as possible.
  • Preferably before much project planning has been done.
  • All of the above.
  • None
  • At least before the start of the project implementation plan.

Answer : All of the above.

Develop a schedule during the process, a project manager may need to go through several iterations of the schedule before the establishment of the schedule baseline. All of the following are tools and techniques that can be used during this process:


Options are :

  • Duration compression, resource leveling heuristics, PERT
  • Critical path, group, Resource Requirements
  • Resource leveling Heuristics, Mathematical analysis, the calendar!
  • GERT, PERT, leads and lags
  • None

Answer : Duration compression, resource leveling heuristics, PERT

PMI-SP Scheduling Professional Practice Exam Set 4

funding for the project, a total of $ 70,000 was finalized BAC value of $ 60,000 What does the term can best describe the difference between the $ 10,000?


Options are :

  • Readiness Councils Reserve
  • cost variance
  • administrative expenses
  • None
  • schedule Variance

Answer : Readiness Councils Reserve

What you are likely to see the project proceeds with the scheduled dates must be strengthened and little or no slack?


Options are :

  • idle resources
  • A lot of the free float
  • positive float
  • None
  • negative float

Answer : idle resources

Which of the following is a process required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.


Options are :

  • The extent of control
  • The project plan update
  • The scope of the project management
  • None
  • The description of the product

Answer : The scope of the project management

Project is a project kick-off meeting. She confidently says the vision and mission of the project. This PM is present next management style:


Options are :

  • Charismatic
  • hierarchical
  • authoritarian
  • None
  • associative

Answer : Charismatic

Change requests received ____________?


Options are :

  • None
  • SOW
  • charter
  • Project baseline
  • Summary

Answer : Project baseline

The project covers:


Options are :

  • None
  • Features and functions of which are to be incorporated in the product or service.
  • The work that must be done in order to obtain a product with the specified features and functions.
  • a and b
  • Verbal description of the quality of work of the contract.

Answer : The work that must be done in order to obtain a product with the specified features and functions.

What type of organization, the project manager has complete control of the project?


Options are :

  • weak matrix organization
  • None
  • Projectized organization
  • Balanced matrix organization
  • strong Matrix

Answer : Projectized organization

Which of the following is the output of a process to determine an area?


Options are :

  • The project scope
  • Accepted deliverables
  • change requests
  • PROJECT DOCUMENT update.
  • None

Answer : The project scope

Contract shut comprising:


Options are :

  • procurement audits
  • None
  • the contract documentation
  • Official approval and closing
  • All the above

Answer : All the above

What is the difference between Make sure the scope and quality control?


Options are :

  • Make sure Scope concerns to ensure that changes are beneficial, while quality control is concerned that the whole work of the results are correct.
  • None
  • Make sure, the scale was mainly influenced by the results of the adoption of the work, when quality control results primarily relates to the accuracy of the work.
  • Maclass="card mb-3">