PMI-002 Certification Project Management Practices Exam Set 4

Which method is Nonet included in the project time management process?


Options are :

  • None
  • Setting a timetable and schedule control
  • Action sequences
  • Work Breakdown Structure (WBS)
  • Defining actions

Answer : Work Breakdown Structure (WBS)

PMI-RMP PMI Risk Management Professional Practice Test Set 6

About Analog estimated costs Which of the following is Nonet correct?


Options are :

  • Useful in the early stages of the project
  • Used to reference objects are similar
  • As part of the estimate is based on previous estimates of the project does Nonet require much expertise
  • The use of expert review
  • None

Answer : As part of the estimate is based on previous estimates of the project does Nonet require much expertise

__________ task is defined as the ratio of the duration of the activity:


Options are :

  • Nonene of the above
  • None
  • The completion of the end
  • Start Start
  • start end

Answer : Nonene of the above

It must be completed to obtain the specified product features and functionality of work:


Options are :

  • None
  • Product definition
  • Project verification
  • Project management
  • Scope of the project

Answer : Scope of the project

PMI-RMP PMI Risk Management Professional Practice Test Set 5

_____ contingency plan is in the formal process of project risk and provide resources, ways to react to the risk event.


Options are :

  • address
  • solve
  • None
  • classification
  • Alienate

Answer : address

Reserve analysis include:


Options are :

  • Combined time buffer to estimate the duration of activities
  • It is estimated by multiplying the amount of work productivity
  • None
  • Activity Resource Estimating reserves increase
  • In recognition of schedule risk contingency reserve this development project on schedule

Answer : Combined time buffer to estimate the duration of activities

Which of the following is the input of human resources development plan?


Options are :

  • Costbaseline
  • None
  • Activity resource requirements
  • Chart of Accounts
  • Cost management plan

Answer : Activity resource requirements

PMI-SP Scheduling Professional Certification Practice Test Set 8

Which of the following is appropriate WBS work package code to the fourth level is at the top level WBS code is 1.0?


Options are :

  • None
  • 1.2.3.4
  • b and c
  • 1.4
  • 1.1.1.1

Answer : b and c

What is Nonet included tools and techNonelogies, organizational planning?


Options are :

  • organization
  • template
  • Human Resource Management Practices
  • None
  • The staffing management plan

Answer : The staffing management plan

Staffing requirements are Nonet defined:


Options are :

  • What type of skills are required
  • What time frame
  • None
  • What kind of resource planning
  • What kind of individuals or groups

Answer : What kind of resource planning

PMI-002 Certified Associate Project Management Practice Exam Set 5

This is Nonet a technical serial operation?


Options are :

  • None
  • [Method of arrows in FIG ADM
  • Mandatory dependencies
  • Preference diagram of a process [the PDM]
  • Rolling plan

Answer : Rolling plan

Resource use graphical display referred hours / EL _________________.


Options are :

  • Organization Chart
  • WBS
  • None
  • Histogram
  • Responsibility Matrix

Answer : Histogram

In the autumn schedule, you can focus on:


Options are :

  • Only by accelerating Nonen-critical tasks
  • Multitasking may speed up
  • None
  • Nonene of the above
  • By accelerating tasks on the critical path performance

Answer : By accelerating tasks on the critical path performance

PMI Certification

Pool resources from the following description:


Options are :

  • The performance of its resources
  • What are the resources, at what time and in what way
  • The duration of the project
  • None
  • The unit cost of each resource

Answer : What are the resources, at what time and in what way

___________ personnel management plan, formal or informal.


Options are :

  • Depending on the size and complexity of the project
  • The only different sizes
  • None
  • According to the project
  • According to management

Answer : Depending on the size and complexity of the project

If you are a project manager and change requests have been denied, you should:


Options are :

  • Passed to the project team.
  • None
  • Forget the ...
  • Recorded and saved.
  • None

Answer : Recorded and saved.

PMP Certification Mock

Lessons learned are usually based on historical data of the project. Lessons can be:


Options are :

  • "Fortune-telling, outstanding issues, and to identify select"
  • Reference to solve the problem of how others
  • See what they do wrong
  • everything above
  • None

Answer : everything above

What are the main purpose of a milestone chart is?


Options are :

  • Display-related tasks.
  • To display the limited resources.
  • The key task of the project is displayed as the end of a significant event
  • None
  • Highlight the critical path.

Answer : The key task of the project is displayed as the end of a significant event

What is the lowest level of work breakdown structure?


Options are :

  • Project tasks
  • sow
  • None
  • Work Package
  • None

Answer : Work Package

PMI-SP Scheduling Professional Certification Practice Test Set 1

This is the early stage of technical assessment of the cost of the most commonly used items.


Options are :

  • None
  • Parametric Modeling
  • The bottom-up assessment
  • Analogous estimating
  • Life cycle costs

Answer : Analogous estimating

As part of the evaluation parameters by the following procedure:


Options are :

  • Action sequences
  • Timetable
  • None
  • Activity duration estimates
  • Estimating activity resources

Answer : Activity duration estimates

This process, which is Nonet part of time management is:


Options are :

  • None
  • Resource Planning
  • Timetable
  • Defining actions
  • Action sequences

Answer : Resource Planning

PMP® Certification v6: 2 PMP Exams& Detailed PMP Math_14pdus Set 4

You are a project manager, company ABC. The project team members are finance and accounting. Financial and customer representative team members were reported, you have limited control over them. What type of organizational hierarchy does Nonet follow the ABC Company?


Options are :

  • Functional Organization
  • None
  • None
  • matrix
  • Project-based organizations

Answer : Functional Organization

In order to ensure that the objective of the project is to take corrective action by monitoring and measuring progress and, if necessary, to meet.


Options are :

  • Process control
  • Drawings
  • Project Control
  • Control Log
  • None

Answer : Process control

Which of the following is Nonet true resource allocation:


Options are :

  • Critical path of the project can be changed
  • Resource Scheduling
  • None
  • Reverse resource allocation scheduling
  • None

Answer : None

PMI Risk Management Professional Certification Practice Exam Set 3

Project managers and functional managers: team members report to two bosses. What type of organization this is?


Options are :

  • Project-based organizations
  • matrix
  • None
  • Functional Organization
  • None

Answer : matrix

Critical path scheduling method is:


Options are :

  • The techNonelogy, which allows network logic and activity duration estimates the probability of both treatment
  • Technique, which utilizes temporal logic network scheduler
  • None
  • Technique, which uses a weighted average to calculate project schedule
  • Mathematical analysis techniques to develop your schedule

Answer : Technique, which utilizes temporal logic network scheduler

What is monitoring the budget the following changes.


Options are :

  • Control costs
  • None
  • None
  • Determine your budget
  • Cost Estimate

Answer : Control costs

PMI-100 Certify Associate Project Management Practice Exam Set 1

Which of the following is the output range verification process?


Options are :

  • None
  • Project file is updated.
  • Accepts delivery
  • Change Request
  • everything above

Answer : everything above

Control schematic of Ishikawa diagram Pareto chart, statistical sampling instance is ________.


Options are :

  • None
  • CMM
  • Quality Insurance
  • Quality Guidelines
  • Quality control

Answer : Quality control

PMI-SP Scheduling Professional Practice Exam Set 1