PMI-002 Certification Project Management Practices Exam Set 1

Identifying the desired region, during the following process:


Options are :

  • Action sequences
  • Activity duration estimates
  • None
  • Defining actions
  • Timetable

Answer : Action sequences

PMP Practice Exams for Certification 2019 PMBOK 6 Edition Set 2

Which of the following should be measured periodically to determine differences from the plan.


Options are :

  • None
  • Demand stakeholders
  • Control schedule
  • Project Control
  • Projects

Answer : Projects

Consider the following estimates: optimistic three days, pessimistic nine days, about six days, which is a weighted average of PERT?


Options are :

  • 4
  • 6
  • 6.3
  • 6.1
  • None

Answer : 6

Virtual relationships or activities doll can be used in action sequences techNonelogy?


Options are :

  • None
  • FIG arrow method [the ADM]
  • Network fragment
  • Preference diagram of a process [the PDM]
  • everything above

Answer : FIG arrow method [the ADM]

PMP® Certification v6: 2 PMP Exams& Detailed PMP Math_14pdus Set 6

The development process of planning, the project manager may need to go through before the establishment of several iterations schedule baseline plan. All of the following tools and techniques can be used in this process:


Options are :

  • Resource leveling heuristics, mathematical analysis, calendars!
  • GERT, PERT, and lags
  • Time compression, resource balancing heuristics, PERT
  • Critical path, group, resource requirements
  • None

Answer : Time compression, resource balancing heuristics, PERT

The program is defined as PMBOK


Options are :

  • Means to split the project into manageable segments
  • None
  • Several sub-projects into the part of management, capable of projecting end, to ensure that the desired results
  • The plan includes project management process groups and procedures to manage multiple projects in
  • The end result desired by the development of key disciplines project

Answer : The plan includes project management process groups and procedures to manage multiple projects in

Which of the following is a common feature in most of the life cycle of the project described?


Options are :

  • The probability of successful completion of the project is the largest at the beginning of the project.
  • Costs are low and the staff started toward the end. And rapid decline approaching end of the project.
  • Stakeholders will be at the end of the project, the final performance of the product is the most significant effect.
  • None
  • a and b

Answer : Costs are low and the staff started toward the end. And rapid decline approaching end of the project.

PMI-SP Scheduling Professional Certification Practice Test Set 6

Which of the following does Nonet cause environmental factors involved in the development of human resources planning process:


Options are :

  • Reduce training funds
  • Organization Chart Tempates
  • Technical kNonew-how and project staff
  • Hiring freeze
  • None

Answer : Organization Chart Tempates

Project is a kick-off meeting. She confidently say that the vision and mission projects. The PM is the current and future management style:


Options are :

  • Associate
  • Attractive
  • Grading
  • Authoritarian
  • None

Answer : Attractive

This process, which is Nonet part of the project risk management:


Options are :

  • Appraisal
  • call
  • In response development
  • Quantization
  • None

Answer : call

PMI PGMP Program Management Professional Practice Exam Set 1

The project covers:


Options are :

  • The quality of the work contract text.
  • None
  • a and b
  • And wherein the function is incorporated in the product or service.
  • In order to obtain a product must meet the required features and functionality to get the job done.

Answer : In order to obtain a product must meet the required features and functionality to get the job done.

As an example of this project are:


Options are :

  • Construction process
  • Billing Customer
  • Management Organization
  • None
  • technical support

Answer : Construction process

This process is to identify and define the product or service is called:


Options are :

  • None
  • Management Protocol
  • Contract Closure
  • Source Selection
  • Acquisition plan

Answer : Acquisition plan

PMI-100 Certified Associate Project Management Practice Exam Set 2

Activity resource requirements ____________ input:


Options are :

  • None
  • Action sequences
  • Activity duration estimates
  • Estimating activity resources
  • Control schedule

Answer : Activity duration estimates

Began to deviate from the process are:


Options are :

  • The project manager is determined
  • everything above
  • Hypothesis
  • None
  • limit

Answer : everything above

Control costs applicable to:


Options are :

  • Chart of Accounts
  • Resource prices
  • Organizational strategy
  • They occur because the management change
  • None

Answer : They occur because the management change

PMI-SP Scheduling Professional Practice Exam Set 5

Planning process are:


Options are :

  • Definition, team development, schedule control, budget control, contract management
  • Planning, resource planning, quality assurance, risk control
  • None
  • Definition, resource planning, assessment of cost, schedule development. Defining actions
  • Welcome, control, status reporting, risk management

Answer : Definition, resource planning, assessment of cost, schedule development. Defining actions

What type of organization, the project manager complete control over the project?


Options are :

  • Powerful matrix
  • Weak matrix organization
  • Project-based organizations
  • Balanced matrix organization
  • None

Answer : Project-based organizations

Which of the following is Nonet output control progress:


Options are :

  • None
  • modify
  • Scheduling Updates
  • Learn a lesson
  • Corrective Action

Answer : modify

PMI-002 Certification Project Management Practices Exam Set 2

Key management skills include:


Options are :

  • communication
  • Negotiating team
  • None
  • everything above
  • leadership

Answer : everything above

Receive change requests ____________?


Options are :

  • None
  • Project Baseline
  • Summary
  • Charter
  • sow

Answer : Project Baseline

_______ is the most accurate cost estimation techniques.


Options are :

  • Analogous estimating
  • None
  • None
  • The bottom-up assessment
  • Parametric Modeling

Answer : The bottom-up assessment

PMI Certification

You are a project manager. You took over the project in the design process, you will find that many people have signed the project plan. Which of the following would be a concern you?


Options are :

  • We must spend more time on configuration management.
  • Who is a partner in the project?
  • Determine the reporting structure
  • Which will include change control board?
  • None

Answer : We must spend more time on configuration management.

Resource leveling is a technique:


Options are :

  • Activity duration estimates
  • Action sequences
  • None
  • Estimating activity resources
  • Timetable

Answer : Timetable

Contractual relationship, including:


Options are :

  • Official approval and closing
  • None
  • Contract Documents
  • everything above
  • Procurement Audit

Answer : everything above

PMP Practice Exams for Certification 2019 PMBOK 6 Edition Set 4

"In order to complete the Performance Index" (such as TCP) is calculated as follows:


Options are :

  • By the cost budget remaining work on the basis of the difference between the cost of the actual cost and estimated end
  • Done by multiplying the cumulative cost performance index by estimating
  • By reducing the actual cost estimate end-date
  • By increasing the estimated actual cost of completed to date, and multiplied by the cumulative cost performance index
  • None

Answer : By the cost budget remaining work on the basis of the difference between the cost of the actual cost and estimated end

Reserve analysis method does Nonet use __________.


Options are :

  • Cost Estimate
  • Assess the duration of action
  • Determine your budget
  • None
  • Control costs

Answer : Control costs

This does Nonet include the increase in efficiency:


Options are :

  • Improving team behavior
  • Improve the ability of the individual
  • In improving the ability of the team
  • Improvement in the number of overtime hours
  • None

Answer : Improvement in the number of overtime hours

PMI-100 Certified Associate Project Management Practice Exam Set 4

Who came up, maintaining desktop systems to achieve business needs, the project has already begun to respond.


Options are :

  • development process
  • Scoping process
  • Information techNonelogy development process
  • Planning process
  • None

Answer : Planning process

Following its conflict resolution model allows cooling-off period, but rarely in the long run, to solve this problem?


Options are :

  • Solve the problem
  • drop out
  • Obstruction
  • force
  • None

Answer : drop out