PEGACMBB PRPC Certified Methodology Black Belt Practice Exam Set 2

Which Directly Capturing Objectives (DCO) tool allows you to draft the primary path of a starting flow? (Choose one)


Options are :

  • None of the above
  • Application Profile
  • Automated Document generation
  • Application Accelerator (Correct)
  • Flow Generator

Answer : Application Accelerator

What is the easiest way to open an Application Profile that is in progress? (Choose one)


Options are :

  • Use the menu options under File -> Open (Correct)
  • List items in the APPLICATION PROFILE workbasket
  • Open the profile by ID in the Find bar
  • Look at the list in a tab on the Operator ID record

Answer : Use the menu options under File -> Open

After the Construction phase is complete, the following sequence is typically followed using the SmartBPMŪ Methodology: (Choose one)


Options are :

  • Quality Assurance (QA) tests, User Acceptance Testing (UAT) tests, Transition to Support, Go- Live (Correct)
  • Smoke tests, Issue resolution, Transition to Support, Go-Live
  • User Acceptance Testing (UAT) tests, Quality Assurance (QA) tests, Transition to Support, Go- Live
  • Smoke tests, Regression tests, Issue resolution, Transition to Support, Go-Live

Answer : Quality Assurance (QA) tests, User Acceptance Testing (UAT) tests, Transition to Support, Go- Live

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 4

What should the review process for the Application Profile and Project Sizing artifacts ensure? (Choose one)


Options are :

  • All of the above
  • The return on investment is clearly articulated (Correct)
  • That Change Control items are clearly articulated
  • That the correct methodology is being used

Answer : The return on investment is clearly articulated

How can Application Profile data be migrated to another machine which has a separate instance of PRPC? (Choose one)


Options are :

  • Using the Application Profile Packaging tool (Correct)
  • Using the Application Accelerator Packaging tool
  • Through the Microsoft Excel export capabilities
  • It must be manually cut, copied, and pasted

Answer : Using the Application Profile Packaging tool

Which three are key activities during Project Initiation? (Choose three)

A. The business and project team walk through the current process to identify the current state

B. Identify and organize staffing models

C. Process improvements and re-engineering investigations begin

D. Capture atomic use cases in the tool


Options are :

  • B,D,C
  • A,B,C (Correct)
  • D,A,C
  • C,A,B

Answer : A,B,C

PEGACPBA71V1 Certified Pega Business Architect (CPBA) Exam Set 2

What is the main objective of the Project Sizing tool within the Application Profiler? (Choose one)


Options are :

  • To create a word document that can be attached to the Application Profile
  • To provide a spreadsheet to enter work types, use cases, complexities, and other data
  • None of the above
  • To calculate an effort estimate required for a project (Correct)

Answer : To calculate an effort estimate required for a project

All of the following are Expert Services EXCEPT: (Choose one)


Options are :

  • Design Review
  • User Experience Review
  • Change Management Review (Correct)
  • Transition Readiness

Answer : Change Management Review

In the Test Management Framework (TMF), a Segment is one or more steps that are performed by any number of actors. True or False


Options are :

  • False (Correct)
  • True

Answer : False

PEGACSSA-v6-2 Certified Senior System Architect (CSSA) Exam Set 6

When are project risks captured and what tool is used? (Choose one)


Options are :

  • In the Inception phase using Application Profiler (Correct)
  • In the Elaboration phase using Microsoft Excel
  • In the Inception phase using Microsoft Excel
  • In the Elaboration phase using Application Profiler

Answer : In the Inception phase using Application Profiler

The development, production, and testing environments should be set up no later than which phase? (Choose one)


Options are :

  • Construction
  • Transition
  • Elaboration (Correct)
  • Project Initiation Activities
  • Go-Live

Answer : Elaboration

In the Test Management Framework (TMF), a Scenario corresponds to a particular path down a flow. True or False


Options are :

  • True (Correct)
  • False

Answer : True

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 5

In the Construction phase, which of the following occurs in Iteration One? (Choose one)


Options are :

  • Complete the primary path of the flow (Correct)
  • Finish UI components
  • Complete interface configuration
  • Update testing strategy

Answer : Complete the primary path of the flow

PEGACLSA_6.2V2 Certified Lead System Architect (CLSA) Exam Set 2

An iterative approach releases small slivers infrequently. True or False


Options are :

  • False (Correct)
  • True

Answer : False

Which of the following are Change Management best practices? (Choose two)

A. Document new requirements with the appropriate level of detail

B. Prioritize the new requirements

C. Rerun the Application Accelerator to account for new change control requirements

D. Project Plan should be updated immediately to reflect new scope prior to approval process


Options are :

  • C,D
  • D,A
  • B,C
  • A,B (Correct)

Answer : A,B

Use cases should be organized into sets. True or False


Options are :

  • False
  • True (Correct)

Answer : True

PEGACSA-v6-2 PEGA SYSTEM Certified System Architect CSA Test Set 6

Which one of the following is unique to the Elaboration phase of the SmartBPMŪ Methodology? (Choose one)


Options are :

  • Build out the foundation of the proposed application (Correct)
  • None of the above
  • The business and project team walk through the current process to identify the current state
  • Conduct product demos, proof of concepts and workshops

Answer : Build out the foundation of the proposed application

When is the Change Control process enforced? (Choose one)


Options are :

  • Transition
  • Project Initiation
  • Go-Live
  • Elaboration/Construction (Correct)
  • Inception

Answer : Elaboration/Construction

You would like to know how a release candidate handles extreme loads. Select the phase and the team with which you will be working. (Choose one)


Options are :

  • Construction / Developers
  • Transition / User Acceptance Testing (UAT) testers
  • Construction / Quality Assurance (QA) testers
  • Transition / Quality Assurance (QA) testers (Correct)
  • Transition / Developers
  • Construction / User Acceptance Testing (UAT) testers

Answer : Transition / Quality Assurance (QA) testers

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 4

The Sizing tool can be automatically generated from inputs to the Application Accelerator. True or False


Options are :

  • False (Correct)
  • True

Answer : False

Which artifacts from the business are organized and grouped to form projects in the Inception phase? (Choose two)

A. Use cases

B. Requirements

C. Project scenarios

D. Test scenarios


Options are :

  • A,B (Correct)
  • C,D
  • D,C
  • C,A

Answer : A,B

The Smart BPMŪ Methodology can be deployed with any other methodology including Scrum, Rational Unified Process (RUP), and Waterfall. True or False


Options are :

  • True
  • False (Correct)

Answer : False

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 6

When can an Application Profile be inserted into a project created with the Project Management Framework? (Choose one)


Options are :

  • At any time (Correct)
  • Only when transitioning from the Elaboration phase to Construction phase
  • Only when transitioning from Inception phase to Elaboration phase
  • Only at the beginning of the project

Answer : At any time

PEGACSSA-v6-2 Certified Senior System Architect (CSSA) Exam Set 5

When importing an application profile into a Project Management Framework project, a user is given the option to import use cases as which of the following? (Choose one)


Options are :

  • Task Groups only
  • Tasks only
  • Tasks, Task Groups, or Bugs
  • Tasks or Task Groups (Correct)

Answer : Tasks or Task Groups

Which of the following are benefits of using the Project Management Framework (PMF)? (Choose one)


Options are :

  • All of the above (Correct)
  • Track and control assignments directly in the tool
  • Improves the quality of your PRPC application
  • Use a single set of tools to develop, document, and report

Answer : All of the above

What is the difference between a Test Management Framework (TMF) Scenario and a TMF Segment? (Choose one)


Options are :

  • None of the above
  • A Segment is a specific path down a flow and is composed of Scenarios
  • Segments are sequenced to ensure they run in the correct order; Scenarios cannot be sequenced
  • A Scenario is a specific path down a flow and is composed of one or more Segments (Correct)

Answer : A Scenario is a specific path down a flow and is composed of one or more Segments

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 5

What is the primary navigation mechanism inside of the Project Management Framework (PMF) to view relationships between tasks? (Choose one)


Options are :

  • The Project's workbasket
  • A user's work list
  • The Tree (Correct)
  • Referencing rules

Answer : The Tree

Bugs can be associated with which of the following in the Project Management Framework (PMF)? (Choose one)


Options are :

  • Projects only
  • Projects, Task Groups, and Tasks
  • Projects or Task Groups (Correct)
  • Task Groups and Tasks

Answer : Projects or Task Groups

Which of the following are true statements regarding the Test Management Framework (TMF)? (Choose two)

A. TMF reduces implementation costs because it is a stand-alone product

B. TMF reduces implementation costs because it leverages other Directly Capturing Objectives

(DCO) capabilities

C. TMF requires the use of Project Management Framework to accomplish tests within projects

D. TMF can integrate with Project Management Framework or other bug tracking software


Options are :

  • B,D (Correct)
  • A,C
  • D,A
  • B,C

Answer : B,D

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 2

The import feature of the Application Accelerator deletes all currently existing requirements in the application accelerator work object and replaces them with those from an import. True or False


Options are :

  • True (Correct)
  • False

Answer : True

Which one of the following statements is true regarding the Project Management Framework (PMF)? (Choose one)


Options are :

  • It can be customized like any other framework to adjust user experience, process, or validation rules (Correct)
  • It should be installed on the PRPC system where development work is being done
  • It can be customized exclusively through preference settings
  • It is locked down when shipped and the processes cannot be customized by anyone other than Pega systems resources

Answer : It can be customized like any other framework to adjust user experience, process, or validation rules

How is connectivity established between a PRPC development environment and the Project Management Framework (PMF)? (Choose one)


Options are :

  • A system setting is configured on the development instance pointing to PMF (Correct)
  • An environment variable is set up on the PMF instance pointing to development
  • They are installed on the same instance, so no additional work is required to connect
  • None of the above

Answer : A system setting is configured on the development instance pointing to PMF

PEGACSSA-V6-2 Certified Senior System Architect (CSSA) Exam Set 5

Comment / Suggestion Section
Point our Mistakes and Post Your Suggestions