IBM Maximo Asset ManagementV7.5 Implementation Practice Test Set 4

The customer wants to send a e-mail message by using the Create Communication actions Work Order Tracking using the communication model The communication model can be reached should be set to what value?


Options are :

  • WORKFLOW
  • WOTRACK
  • APPS
  • Escalation
  • None

Answer : APPS

What is required for the process comes to choosing a sub-process node?


Options are :

  • None
  • The process must be in place.
  • The process must have at least one condition node.
  • The process is activated.
  • The process is different reference object.

Answer : The process must be in place.

How inventory item created?


Options are :

  • Create a target Warehouse application and add it to the store
  • Create a warehouse target application and enter the relevant unit
  • None
  • Create a target Item application, and specify the relevant unit
  • Create a target Item app and add it to the store

Answer : Create a target Item app and add it to the store

What three steps is performed Quick reporting application?


Options are :

  • report the actual work order
  • plan crafts and tools required for the work
  • More work logs
  • Enter meter readings
  • apply the route of the work order
  • edit work order hi story

Answer : report the actual work order Enter meter readings apply the route of the work order

What makes a forecast of the dates of preventive maintenance record locked Preventive Maintenance application?


Options are :

  • select Lock forecast from the Action menu
  • change the status of a locked
  • update the extended date field
  • None
  • enable the planned dates, Locked check box

Answer : select Lock forecast from the Action menu

Which of them is true the creation of Service Level Agreement (SLA)?


Options are :

  • It is created based on the Maximo business object to which it applies.
  • It was created agreements and guarantees based on a contract approvals, as defined in the application.
  • It is created based on service requests initiated by the Work Orders application.
  • It is created based on the collections of assets that appear in the inventory system.
  • None

Answer : It is created based on the Maximo business object to which it applies.

IBM Maximo Asset ManagementV7.5 Implementation Practice Test Set 5

Preventive maintenance (PM) work orders which can be triggered by two criteria?


Options are :

  • Time-based PMS is based on the elapsed time from the previous work
  • Item-based PMS is based on the status item when it is transferred to the storage room service
  • The meter-based particles are based on meter readings property
  • The unit of measurement-based PMS is based on the advent of the Metrics application
  • Asset-based PMS based on the status of the asset when it is transferred to the maintenance of the storage room

Answer : Time-based PMS is based on the elapsed time from the previous work The meter-based particles are based on meter readings property

What determines the transfer process of the IBM Maximo Asset Management V7.5?


Options are :

  • received materials consumed in another place
  • data or tools from one warehouse to another
  • Sending services are consumed in another place
  • None
  • the carriage of goods by courier to the receiving location

Answer : data or tools from one warehouse to another

The customer wants to automatically close the escalation of work orders that have been in perfect condition for more than 30 days. Which one is true to this escalation?


Options are :

  • The escalation should be a condition that supervises the work order status.
  • The escalation should be a condition that supervises the work order status and edited.
  • None
  • The escalation point should be set to repeat.
  • Escalation point would have taken the time interval 720.

Answer : The escalation should be a condition that supervises the work order status and edited.

What is true of the routes?


Options are :

  • When the route has been applied to a work order, the result taskwork or child work orders can no longer be changed.
  • Once the route has been applied to a work order, a new sequence numbers can be given as a result of work orders taskwork or a child.
  • None
  • And the parties, which apply to the route will be in the same place as the site ID route record.
  • And the parties, which apply to the route will be in the same place as the site ID for the parent record.

Answer : Once the route has been applied to a work order, a new sequence numbers can be given as a result of work orders taskwork or a child.

With IBM Maximo Asset Management V7.5 application can watch the work force, which applies to special requirements or to view the work order requirements, which are suitable for craft, skill level, vendor, contract, availability calendar, or move the screen workforce?


Options are :

  • task Manager
  • Preventive Care
  • rapid reporting
  • None
  • Job plans

Answer : task Manager

Which of them is true about the spread of the scheduling IBM Maximo Asset Management V7.5 (Maximo)?


Options are :

  • Maximo expansion is carried out at intervals.
  • Maximo carry out the expansion of each hour.
  • None
  • Maximo monitors the database when the schedule.
  • Maximo carry out expansion activities, as planned.

Answer : Maximo monitors the database when the schedule.

Every application is used to increase the values ??of the structure list?


Options are :

  • None
  • domain Names
  • organizations
  • database Configuration
  • Work Order tracking

Answer : organizations

How is the document to include an e-mail sent to the communication model?


Options are :

  • Create a dialog box to send a communication attachments
  • Linked Documents tab to send a communication box
  • Communication from the Model tab and select the document Attachments
  • Attachment Folders tab, select the Include the box
  • None

Answer : Communication from the Model tab and select the document Attachments

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 1

Which three fields are available when creating a service request?


Options are :

  • storeroom
  • advantage
  • Affected Location
  • Detail
  • Summary
  • Company

Answer : advantage Detail Summary

How do preventive maintenance (PM) record left in the PM forecast a preventive maintenance application?


Options are :

  • Remove the selection: Add this forecast PM
  • Click Remove Forecast From the Select action menu
  • Change the status of PM NONSCHED
  • None
  • Select an option: Exclude PM forecast

Answer : Remove the selection: Add this forecast PM

Where the application is the default storage laid down?


Options are :

  • organizations
  • Use inventory
  • None
  • Item
  • inventory

Answer : organizations

The lease / rental agreement defines the general terms of contract between the seller and the customer's related to what?


Options are :

  • investment goods
  • fixed assets
  • Services
  • revolving funds
  • None

Answer : revolving funds

When you import data using Integration Framework, a property can be set to the user's own e-mail notifications?


Options are :

  • Mxe.int.admintoemail
  • None
  • Mxe.int.emailto
  • Mxe.int.adrninistratormail
  • Mxe.int.email

Answer : Mxe.int.admintoemail

What is true of the commitments made when creating service level agreements (SLAs)?


Options are :

  • When specifying any of the default folders in the types of commitments, which values are defined and include level attribution.
  • None
  • When securing the commitment of the SLA, the SLA provides instruction in one of the escalation.
  • By default, the binding is availability.
  • The SLA may specify multiple types of commitments.

Answer : The SLA may specify multiple types of commitments.

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 2

If the integrity check utility indicates that some missing indexes, which application should be used to fix this problem?


Options are :

  • database configuration application
  • None
  • Database Designer application
  • Asset app
  • Migration Manager application

Answer : database configuration application

What are the two valid options stopovers?


Options are :

  • Configuration part of the Records
  • assets
  • Locations
  • Condition Monitoring Points
  • Instruments

Answer : assets Locations

What <instaii homeVCTG_DE \ ACSI \ bin \ iistiu command do?


Options are :

  • Displays installed Maximo V7.5 and middleware components from Maximo System Information
  • Shows of Maximo V7.5 components installed from Maximo System Information
  • Displays installed Maximo V7.5 components and middleware installer installed, from the Deployment Engine view
  • Shows of Maximo V7.5 components installed, from the Deployment Engine view
  • None

Answer : Displays installed Maximo V7.5 components and middleware installer installed, from the Deployment Engine view

Each sequence describes the procedure to notify the labor contract / vendor?


Options are :

  • Open the Labor Reporting application, select Enter the agreement / Editor, select the function menu, enter information about the job
  • Reporting to open the application, select the Report tab Labor contract / vendor and the number of hours worked
  • Open the Labor Reporting application, choose Labor Report tab. Enter the contract / vendor and the number of hours worked
  • Reporting to open the application, select Enter the agreement / Editor, select the function menu, enter information about the job
  • None

Answer : Open the Labor Reporting application, select Enter the agreement / Editor, select the function menu, enter information about the job

Stocks of hard reservation is a request for materials, identifies the need for what?


Options are :

  • None
  • Target is based on the work order priority
  • Target based on the current balance
  • Destination within a certain period
  • Target a specific supplier

Answer : Destination within a certain period

When using the route, Work Orders Child option is specified. What logic does IBM Maximo Asset Management V7.5 use to determine the description of the unborn child work orders?


Options are :

  • None
  • If the route record is a description of the child becomes a work order description.
  • If you stop a route has no description, and it refers to an asset, work order description is the description of the asset.
  • If the route-train has no description, and it refers to a place, work order description is the concatenation of the location of the identification and location description
  • If you stop a route refers to a job plan, work order description is the concatenation of the work plan for the identification and description of the work plan.

Answer : If the route-train has no description, and it refers to a place, work order description is the concatenation of the location of the identification and location description

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 3

Which three statements are true with respect to return of property seller?


Options are :

  • Direct neck warmer can not be restored if it is moved.
  • An asset's inventory cost must not equal the reversing line cost.
  • Rotating funds can not be returned to the supplier.
  • Direct the collar can be restored if it is moved.
  • An asset inventory cost is the same reversing line costs.
  • The funds must be returned to the receiving warehouse.

Answer : Direct neck warmer can not be restored if it is moved. An asset inventory cost is the same reversing line costs. The funds must be returned to the receiving warehouse.

Which of them is true about the master preventive maintenance (PM) record?


Options are :

  • Master PM record does not generate work orders.
  • Associations existing record of PM and PM master records can not be made
  • Master PM record to generate work orders, like any other PM records.
  • None
  • PM Related records can not be created from the master PM records.

Answer : Master PM record does not generate work orders.

When the new Business Intelligence and Reporting Tool (BIRT) reports the use of various IBM Maximo Asset Management applications, which correctly describes the phase part of the process to add a new report?


Options are :

  • The system configuration option, select the report designer to import files
  • Using BIRT Report Designer Workstation, the menu item to bring new report
  • Before design files are imported, all the library files associated with it must be imported
  • Before design files are imported, the location of the files that define the location of the images and report back to the files must be populated with
  • None

Answer : Before design files are imported, all the library files associated with it must be imported

Multiple items or equipment, company is received at the receiving site and the second docking station includes a number of shipping. Every application is used to recognize and officially receive these items?


Options are :

  • revenue
  • None
  • Goods reset
  • acceptance
  • Receiving transmission

Answer : Receiving transmission

Comment / Suggestion Section
Point our Mistakes and Post Your Suggestions