The work of the Order Information Preventive Maintenance application that is a required field?


Options are :

  • priority
  • Workgroup
  • Location
  • None
  • Work Order Status

Answer : Work Order Status

CBA Corporation wants to create a new application. This application must be four tabs, including a list and Main. What type of application should you use?


Options are :

  • Multi-Tab application
  • Smart application
  • None
  • One page application
  • power application

Answer : power application

Which of them describes the operation, select Return button issues?


Options are :

  • to return to the stock inventory can be found in the workshop
  • return set issued but unused inventory to another warehouse
  • to return excess inventory items to another storage bin
  • return set issued but unused in the original warehouse in stock
  • None

Answer : return set issued but unused in the original warehouse in stock

In addition, work order tracking application, which the other app allows the user to design a work or crafts?


Options are :

  • Safety plan application
  • Labor application
  • None
  • Fast reporting application
  • Activities and Tasks applications

Answer : Activities and Tasks applications

IBM Maximo Asset ManagementV7.5 Implementation Practice Test Set 2

The forecast predictive maintenance record is created. How does the forecast date adjustable preventive maintenance application?


Options are :

  • The forecast tab projection line, enter the value of the new date field, then click Save
  • From the Select action menu, select Create a forecast, enter a value in the forecast days in the field, then click OK
  • None
  • Frequency of the tab Time Based Frequency tab, enter a value in the date field, select Extended Record
  • Frequency of the tab Time Based Frequency tab, enter a value in the Frequency field, select Record

Answer : The forecast tab projection line, enter the value of the new date field, then click Save

The host application, the approved amount field show?


Options are :

  • Number of products that received inspection
  • Number of products that are awaiting review
  • None
  • Number of products that passed inspection
  • Number of products to accept inspection

Answer : Number of products that passed inspection

Which of them is described in the inventory backorder booking type is set to?


Options are :

  • Choose your destination lower than the amount of the current balance of commissioned works Order Materials subtab
  • Complete the restructuring of locations and enable the checkbox Tree Delivery
  • To enable the Block Negative Balance Available Organizations> Inventory Options> Preferences Inventory
  • Enabling Tree Delivery reserve on the type of work order - Materials sub-tab
  • None

Answer : To enable the Block Negative Balance Available Organizations> Inventory Options> Preferences Inventory

Where IBM Maximo Asset Management V7.5 features change?


Options are :

  • The application characteristics of the application
  • Logging.properties file
  • None
  • In the System Properties application
  • Mxserver.properties file

Answer : In the System Properties application

How, for example, to run a cron job?


Options are :

  • To define the schedule and set the parameters
  • The active set, and turn the Admin
  • Turn on Admin and define the schedule
  • Define the schedule and set Active
  • None

Answer : Define the schedule and set Active

Where is the location defined in the attached documents in an IBM HTTP Server?


Options are :

  • None
  • httpapp.xml file
  • web.xml file
  • document.conf file
  • httpd.conf file

Answer : httpd.conf file

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 1

In setting the new reports for different IBM Maximo Asset Management applications, which statement is true about browser shortcuts created for those reports?


Options are :

  • None
  • Links can create a report that does not have parameters
  • Links can create hyperlinks
  • Links can create any type of report
  • Shortcuts can be created with Application Designer

Answer : Links can create a report that does not have parameters

The bill was approved but the error was detected, and it must be corrected. How does this happen?


Options are :

  • Change status to WAPPR, to fix the bill and adopt it,
  • Change status to duplicate and correct with the new bill the correct information
  • Change status checked and to create a new invoice with the correct information
  • Change the mode to edit, correct the bill and adopt it,
  • None

Answer : Change status checked and to create a new invoice with the correct information

What is the standard default status of a purchase order when it is created in IBM Maximo Asset Management V7.5?


Options are :

  • Waiting for approval
  • New
  • None
  • Created
  • In progress

Answer : Waiting for approval

Which two utilities to check for your successful IBM Maximo Asset Management V7.5 installation?


Options are :

  • installHealthCheck
  • solutionValidation
  • solutionInstaller
  • installValidation
  • installVerification

Answer : solutionInstaller installValidation

What is true of the relationship between expansion and actions?


Options are :

  • The type of activity must be accessible from.
  • Measures should be related to the escalation of the action.
  • At least one of the function and the declaration must be related to the escalation of the point.
  • Activities will join the group of the sequence.
  • None

Answer : Measures should be related to the escalation of the action.

With IBM Maximo Asset Management V7.5 application to build and display failure hierarchies?


Options are :

  • fault reporting
  • None
  • failure of structures
  • failure of the Class
  • fault codes

Answer : fault codes

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 2

Which one is true, check the contents of a scheduled report?


Options are :

  • Access to the URL link sent by e-mail, and then log on Maximo and select the Download Content button
  • Use the Report Administration application to view and choose the report type list of outputs
  • Use a URL link to an e-mail is delivered to use the PDF file is served directly from an HTTP server
  • None
  • Use the Report Administration application to choose the correct report, and then on the View button

Answer : Access to the URL link sent by e-mail, and then log on Maximo and select the Download Content button

Now we need to create the escalation?


Options are :

  • Description
  • Condition
  • None
  • place
  • Schedule

Answer : Schedule

When the service level agreements (SLAs) are generated, two different types of calendars may be used: an a calendar or calendar calculation. Which one is valid?


Options are :

  • Calculation calendar to determine the valid values based on a specified query specified creator.
  • When both types of calendar left blank, the time and the transitions are both used to record matching criteria.
  • None
  • Applies to calendar to determine a certain displacement during working hours for the organization.
  • Applies calendar is used when the SLA apply to other SLA.

Answer : Applies to calendar to determine a certain displacement during working hours for the organization.

After completely receiving the transmission, it turns out that the object or tool has been damaged and must be sent back. How it is recognized that the good (s) has been returned to the transfer receipt of the request?


Options are :

  • None
  • Search for receiving a transmission, select the button to select the damaged file, select each item and updates the amount will be refunded, OK
  • Search for receiving a transmission, select the new row, enter the number, and select the target for the measure SHIPRETURN species
  • Search for receiving a transmission, select the new row, enter the number, and select the destination for SHIPDAMAGED Transaction Type
  • Search for receiving a transmission, select the button Select Return selecting each item and updates the amount will be refunded, OK

Answer : Search for receiving a transmission, select the button Select Return selecting each item and updates the amount will be refunded, OK

Whichever option you keep the picture of the target master record Item application?


Options are :

  • Click Action> Annex / Library folders
  • None
  • Click Action> Add / Image Conversion
  • By clicking on the icon Attachments
  • Click the picture icon

Answer : Click Action> Add / Image Conversion

The customer is the requirement to automatically generate a work order when a service request to the customer service manager approves the request using Workflow. Every object is this activity?


Options are :

  • work order
  • Workflow
  • None
  • SR
  • ticket

Answer : SR

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 3

What is the purpose Stock Classes IBM Maximo Asset Management V7.5?


Options are :

  • To determine whether the object can be placed in the warehouse
  • None
  • Specifies that the item can be automatically reorder
  • Appoint a difference stocked and special order items
  • Named, whether the target is automatically rearranged

Answer : To determine whether the object can be placed in the warehouse

If the integrity check tool reports that some groups have privileges Maximo security tables, how could this be solved?


Options are :

  • None
  • Create a new Security Group Maximo Maximo security tables and then run the integrity checker utility again
  • Run integrity checker in repair mode
  • Run integrity checker in backup mode
  • Create a new security group of all grants is Maximo security tables and then run the integrity checker utility again

Answer : Run integrity checker in repair mode

Every structure can be used when creating a resource for rotating the record?


Options are :

  • Asset data structures
  • None
  • material structures
  • Individual Assembly structures
  • Child Asset structures

Answer : Individual Assembly structures

Which one is true for the master Preventive Maintenance (PM) record?


Options are :

  • Master PM record to generate work orders, such as additional PM.
  • Master PM record generated Instruments application.
  • Master PM record generated in the corresponding application.
  • PM links with existing records and master PM record can be made.
  • None

Answer : PM links with existing records and master PM record can be made.

The transmission must be created to transfer the stocks to use by using the Inventory application. What are the usage type may be a record for Inventory Use to perform the shipping?


Options are :

  • SHIPPING
  • PROBLEM
  • RETURN
  • TRANSFER
  • None

Answer : TRANSFER

What is a Work Order?


Options are :

  • Request inventory locations restructuring
  • Request for user access to the application
  • The request stop on the route
  • None
  • Request for work to be performed

Answer : Request for work to be performed

C2010-505 IBM Smart Cloud Control Desk V7.5.1 IT Asset Test Set 4

Where Work Orders are created?


Options are :

  • Work Entry application
  • Work Order Tracking Application
  • Individual application
  • Group work Application
  • None

Answer : Work Order Tracking Application

When using the Asset Templates application to upgrade existing resources, which prevents the replacement of the information when applying for a model?


Options are :

  • Check to upgrade existing fields checkbox
  • Leave fields blank
  • None
  • Edit Organization options
  • Changes to the portal options

Answer : Leave fields blank