Blue Prism Certified Developer - Mock Test Set 4

How many Start Stages can a sub-page in a Process have?


Options are :

  • 0
  • 1
  • 2
  • Any Numbers of Start Stage

Answer :1

How should the properties be configured for the Process to throw a new Business exception, i.e. a different exception to the one encountered in Page1?


Options are :

  • Configure Exception Type() in the Exception Type field and ExceptionDetail() in the Exception Detail field. Leave the Preserve the type and detail of the current exception checkbox un-ticked.
  • Tick the Preserve the type and detail of the current exception checkbox. Leave the Exception Type and Exception Detail fields blank.
  • Leave the Exception Type field blank and type "Business Exception" in the Exception Detail field.
  • Type Business Exception in the Exception Type field and type a custom message in the Exception Detail field.

Answer :Configure Exception Type() in the Exception Type field and ExceptionDetail() in the Exception Detail field. Leave the Preserve the type and detail of the current exception checkbox un-ticked.

Study the following process flow:

This is the Main Page of a simple process which calls the Page Calculation before completing.

The data items are configured as follows:

X is a Number data item with an initial value of 20

Y is a Number data item with an initial value of 5

Result is a Number data item with no initial value.

The Calculation page stage is configured as follows:

The Calculation Page is as follows:

The Data Items are configured as follow:

X is a Number data item with an initial value of 10

Y is a Number data item with an initial value of 5

Result is a Number data item with no initial value,

The Start Stage is configured pass through the X and Y values an input parameters

The divide calculation stage expression is [X] / [Y]

The end stage is configured to pass back the results value as an output parameter.

What will be contained in the Result Data Item on the Main Page following the execution of the Process?


Options are :

  • 0
  • 2
  • 4
  • No Value

Answer :4

Blue Prism Certified Developer - Mock Test Set 2

Study the following page in a process:

Calculation stages will write A, B or C to the Output value data item. What will be the outcome after the page has run?


Options are :

  • Data Item Output Value contains "A"
  • Data Item Output Value contains "B"
  • Data Item Output Value contains "C"
  • An Internal Exception will be thrown

Answer :Data Item Output Value contains "B"

OR



What will be the outcome after the page has run?


Options are :

  • Data Item Output Value contains A
  • Data Item Output Value contains B
  • Data Item Output Value contains C
  • An Internal Exception will be thrown

Answer :Data Item Output Value contains A

Which of the following indicates a case in a Work Queue is being Processed?


Options are :

  • Option A)
  • Option B)
  • Option C)
  • Option D)

Answer :Option B)

Blue Prism Certified Developer - Mock Test Set 1

Which of the following indicates a case in a Work Queue is Waiting to be Worked?


Options are :

  • Option A)
  • Option B)
  • Option C)
  • Option D)

Answer :Option C)

The following Calculation Stage uses the Today function to get the current date as a date value and place it in a data item entitled "Today";

Which of the following statements is correct?


Options are :

  • If the data item "Today" is configured with a Data Type of Text, an exception will be thrown on execution of the calculation stage
  • If the data item "Today" is configured with a Data Type of Date, an exception will be thrown on execution of the calculation stage
  • If the data item "Today" is configured with a Data Type of DateTime, an exception will be thrown on execution of the calculation stage
  • None of these statements are correct

Answer :None of these statements are correct

A Blue Prism solution interfaces with an internet application called HappyWeb There is a test website available for development, and a training site available for user acceptance testing, and there is the production she available for processing live cases in HappyWeb.

Which of the following is true?


Options are :

  • All development and testing MUST be done using the production site. This is because the test and training websites might not mirror production exactly.
  • A local text file should be used to easily configure the details of the HappyWeb website to be used in each Blue Prism environment.
  • An Environment variable should be used to store the HappyWeb URL.
  • Three different versions of object that launches the HappyWeb website will need to be created and maintained, one for each environment.

Answer :An Environment variable should be used to store the HappyWeb URL.

BluePrism Developer Certification (AD01) - Practice Tests Set 1

An error was encountered while running a process.

Which of the following could cause this exception?


Options are :

  • An internal error always indicates a problem with the Blue Prism product. The Blue Prism support team should be contacted for assistance
  • The Attach action is not connected to another stage so cannot execute.
  • The Business Object has not been coupled to the application by either launching it or attaching to it.
  • The Launch action in the Attach Business Object no longer exists but the Process is attempting to use it.

Answer :The Business Object has not been coupled to the application by either launching it or attaching to it.

How many Tags can be added to a case in Work Queue?


Options are :

  • Only 1
  • More than 3
  • Less than 10
  • Any Number

Answer :Any Number

Which of the following Stages can be found in Object Studio but NOT in a Process Studio?



Options are :

  • Option A)
  • Option B)
  • Option C)
  • Option D)

Answer :Option B)

Blue Prism Developer Certification AD01- Exam Dumps Set 3

An exception was thrown because the system provided the message: "User does not exist".

What type of the exception is this?


Options are :

  • System Exception
  • Business Exception
  • Validation Exception
  • None of the above

Answer :Business Exception

Which of the native object is used to encrypt and decrypt the data items in Blue Prism flow?


Options are :

  • Credentials
  • Work Queues
  • Encryption
  • None of the above

Answer :Encryption

Which of the following Stages should not be used in Exception Block?



Options are :

  • Option A)
  • Option B)
  • Option C)
  • Option D)

Answer :Option B)

Blue Prism Developer Certification AD01- Exam Dumps Set 7

Which part of the Blue Prism would be used to configure Business Rules and Logic?


Options are :

  • Application Modeller
  • Object Studio
  • Process Studio
  • Control Room

Answer :Process Studio

Which of the below Stage has neutral effect on Process Flow?


Options are :

  • Wait Stage
  • Action Stage
  • Anchor Stage
  • Alert Stage

Answer :Anchor Stage

Which of the below configuration in Calculation Stage is correct to get tomorrow date in Blue Prism Process flow?



Options are :

  • AddDays(Today(),1)
  • AddDays(Today():1)
  • AddDays(Today();1)
  • Today()+1
  • Tomorrow()

Answer :AddDays(Today(),1)

Blue Prism Certified Developer - Mock Test Set 4

What is true about defer items from the work queue?


Options are :

  • New cases can be deferred to prevent them from being worked
  • Defer means the items are temporarily frozen
  • If get next item does not get an item,it does not necessarily mean that there are no unworked items in the queue
  • All of the above

Answer :All of the above

An Exception was thrown because the system provided the message:

"insufficient funds in account" .

What type of exception is it?


Options are :

  • Business or System Exception
  • System Exception
  • Business Exception
  • Validation Exception

Answer :Business Exception

What is wrong with this flow diagram?


Options are :

  • After Clicking the element using navigate stage , use arbitrary wait before sending input to the application
  • No retry logic added in recovery mode
  • Do not try recover the exception following the wait stage
  • Nothing wrong with the flow

Answer :Do not try recover the exception following the wait stage

Blue Prism Developer Certification AD01- Exam Dumps Set 7

Which of the following about an object's run mode is true?


Options are :

  • The run mode of a business object has no influence on how many business objects can be run at the same time.
  • A run mode of background will enable the business object to run at the time a other background, foreground and exclusive business objects.
  • A run mode of background will enable the business object to run at the same time as other foreground business objects.
  • A run mode of exclusive cannot at the same time as any other business object.

Answer :A run mode of exclusive cannot at the same time as any other business object.

Study the Following process flow on the MAIN PAGE of a process.

Consider the following explanations to what is wrong with the design?

1- The exception handling is not within an exception block

2- There is no resume stage in the shown process flow

3- There is a potential for the flow to cause an infinite loop

4- Because the flow is on main page, there should not be any "Re-Throw" exception stage as there is no parent/calling pages for the exception to "bubble-up" to.


Options are :

  • 3 Only
  • 4 Only
  • 2 and 4
  • 1,2,3,4

Answer :3 Only

Comment / Suggestion Section
Point our Mistakes and Post Your Suggestions